{"id":41518,"date":"2007-12-23T21:30:15","date_gmt":"2007-12-23T13:30:15","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/engineers-evaluating-radiator-hose-issue-on-the-fleet\/"},"modified":"2007-12-23T21:30:15","modified_gmt":"2007-12-23T13:30:15","slug":"engineers-evaluating-radiator-hose-issue-on-the-fleet","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/engineers-evaluating-radiator-hose-issue-on-the-fleet\/","title":{"rendered":"Engineers evaluating radiator hose issue on the fleet"},"content":{"rendered":"<p>While the focus continues on the replacement of a suspect connector inside Atlantis\u2019 External Tank, engineers are evaluating a problem with a radiator hose on Discovery \u2013 which is causing a launch constraint concern with STS-122.\n<\/p>\n<p>  While the hose will likely be replaced on Discovery, engineers are assessing if they need to gain access to Atlantis\u2019 cargo bay, in order to carry out boroscope inspections \u2013 due to the possibility of finding a cracked hose \u2013 which may cause a Freon leak on orbit.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special NOW LIVE.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Special: 12 MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. 17 Shuttle FRR Presentations. Payload Presentations and vast amounts of live, uploaded images and presentations. Installation Movies (several)&nbsp;\u2013 already 1700&nbsp;megabytes strong** <\/font><\/em><\/p>\n<p>**COMPLETE Section on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 Troubleshooting Latest**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE updates on Discovery STS-124 Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>**Click here for FRR&nbsp;overview articles: Article 1 \u2013 Article 2**&nbsp;&nbsp;\u2013 Click *HERE* for all our articles on the STS-122 ECO\/Feedthrough Connector&nbsp;issue.<\/p>\n<p><!--StartFragment --><\/p>\n<p><em><u>ET-125 Troubleshooting&nbsp;Latest:<\/u><\/em><\/p>\n<p>All three orbiters are currently powered down for Christmas, with work continuing on the preparations for the removal of the LH2 Feed-through connector inside of ET-125. A carefully planned TPS (Thermal Protection System) foam removal procedure was drawn up by United Space Alliance and Lockheed engineers, in order to protect the rest of the tank.<\/p>\n<p>\u2018Will return on December 27 and complete remaining foam removals and removal of connectors,\u2019 noted processing information on L2. \u2018Will then repressurize the tank and complete work around December 28\/29.<\/p>\n<p>\u2018Continuing to work through various R&amp;R scenarios as discussed for STS-122\/ET-125. Now working through and prioritizing what makes sense as begin gathering additional information on processing and hardware performance. Key activities include development of dissection plans for TPS. <\/p>\n<p>\u2018Are removing cable trays and preserving electrical connector on ET-125 as much as we&nbsp;can. Building up test hardware and doing development work on facilities to perform cryo test of hardware.\u2019<\/p>\n<p><em><u>Aft Radiator Hose Issue:<\/u><\/em><\/p>\n<p>Due to the focus on the suspect connector, the usual troubleshooting \u2013 which is a natural part of any pad flow \u2013 has not required the full attention of shuttle management. However, a new issue has now been elevated for evaluation by the Orbiter Project Office\u2019s of NASA and the United Space Alliance. <\/p>\n<p>\u2018Issue on OV-103 (Discovery). When closed doors recently, noticed right aft radiator retract hose didn\u2019t retract back into box. Excess hose that connects Freon loop to radiator kinked in door. Hasn\u2019t happened before,\u2019 noted the Stand-up report on L2.<\/p>\n<p>\u2018Have done boroscope of area, and video is available, but doesn\u2019t show any obvious root causes. Will cycle door to determine how hose reacts. Safety folks involved and are concerned of possible crack in hose that may cause Freon leak. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Now includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>\u2018Plan is to determine as much information as possible and have door in safe configuration before holidays. May need to R&amp;R hose. Program assuming remote possibility that we may be able to fly hose as-is based on rationale and X-rays verifying no internal damage to hose.\u2019 <\/p>\n<p>Given Discovery isn\u2019t due to fly again until STS-124, time is on the side of engineers in the&nbsp;Orbiter Processing Facility. However, the first-of-its-kind issue has raised questions on the status of the hose on the other two vehicles \u2013 especially Atlantis.<\/p>\n<p>\u2018Radiator hose concern is constraint for STS-122. When looked for root cause, found no obvious blockage. KSC may need to determine a way to go into bay and inspect these hoses. For now, performing door cycles and visual observations, which probably won\u2019t get us to a root cause. <\/p>\n<p>\u2018Need to understand configuration for OV-104 and there would then be a risk discussion relative to flight rationale.\u2019<\/p>\n<p><em><u>Additional Atlantis Troubleshooting:<\/u><\/em><\/p>\n<p>Troubleshooting is also taking place on the ATVC (Ascent Thrust Vector Control) box \u2013 a system used to move the orbiter\u2019s main engine nozzles during launch \u2013 in Avionics Bay 5. Access to Atlantis\u2019 aft is available due to the recent the ECO (Engine Cut Off) sensor troubleshooting.<\/p>\n<p>This box had previously&nbsp;suffered issues on Discovery ahead of STS-121, due to a phenomenon known as \u2018tin whiskers\u2019 \u2013 which caused a major evaluation by shuttle managers, following a dissenting opinion by the Aerospace Corp. However, Atlantis\u2019 issue is not serious, with a spare available, should engineers need to replace it. <\/p>\n<p>\u2018ATVC problem on OV-104 (Atlantis). Actuator signature is erratic until after the box has been on for awhile and is warm, which is when everything goes back to normal. Could be due to thermal issues inside box or due to wiring between box and actuator. <\/p>\n<p>\u2018Troubleshooting plan is to swap driver output and swap twp actuators at the box and determine if problem follows swap. Part of plan is to look at MDM where signal comes out of box. Should be able to isolate problem. If problem is in box, have spare for R&amp;R. More to come on this; have a good plan to isolate root cause.\u2019 <\/p>\n<p><em><u>STS-123 Processing Latest:<\/u><\/em><\/p>\n<p>With the launch date for STS-122 still anywhere between January 10 and March, Atlantis\u2019 younger sister, Endeavour, has seen processing milestones for her mission, STS-123, remain under evaluation.<\/p>\n<p>Following a slight hiccup in her processing flow, with a leaking Main Landing Gear (MLG) strut, which required engineers to changeout the seals inside the gear, Endeavour is to all intents and purposes ready for rollover to the Vehicle Assembly Building (VAB). That, of course, is on hold, pending the reviewed launch date for Atlantis\/STS-122. <\/p>\n<p>\u2018Completed aft structure leak checks. Also working troubleshooting on Shuttle Orbiter Repackaged Galley (SORG); there\u2019s a potential tank R&amp;R that would occur after holidays. Retracting gear, doing step and gap, and performing landing gear functionals after holidays,\u2019 noted processing information.<\/p>\n<p>\u2018Tank and booster activities \u2013 Continuing with closeouts on system tunnels. Moved ET\/SRB mate date to no earlier than January 2. <\/p>\n<p>\u2018Not much work planned over the holidays. When they get back, they will be able to go into the OTS (Orbiter Transporter System) operations, weight and C.G. (Center of Gravity), etc. Will try to get into a position to roll out on January 8, which is a day earlier than originally planned. <\/p>\n<p>\u2018Want to try to get to a point where they are not in competition with launch (STS-122) on January 10, 2008 (No Earlier Than). If they can get over on January 8 they will be able to secure vehicles by January 10 and not have any interruption of operations. Plan on having about 60 people working through the holidays on the ET, and will take the two days off that have been outlined.\u2019<\/p>\n<p>While STS-122\u2019s launch date remains fluid, managers are continuing to plan ahead with the upcoming flights, to ensure they are in a strong posture in the event Atlantis manages to launch in January.<\/p>\n<p>\u2018Started looking at FRR (Flight Readiness Review) for STS-123. It looks like the Level 1 FRR will be on February 8, 2008, per Mr. Gerstenmaier\u2019s request,\u2019 added the Stand-up. \u2018Will look at doing the Program FRR the week before, depending on where we get on STS-122.\u2019<\/p>\n<p><em><u>STS-124 Processing Latest:<\/u><\/em><\/p>\n<p>Back with Discovery, her post flight (STS-120) processing is continuing, ahead of her next flight (STS-124). In addition to the aforementioned issue with the radiator hose, Discovery has seen four of her RCC panels removed, following the issues with weakened SiC to carbon substrate adherence, or \u2018debonding\u2019 of the top layer of the panels. The issue is currently going through the process of a Tiger Team level evaluation.<\/p>\n<p>STS-124\u2019s crew also visited the Michoud Assembly Facility (MAF) in New Orleans to look at the External Tank they will be flying uphill with, ET-128 \u2013 which is a modified tank that will debut the final changes to the Ice Frost Ramps (less foam \u2013 replaced by titanium), in what will be a test of the new tank ahead of the flagship mission to Hubble (STS-125). <\/p>\n<p>\u2018STS-124 crew at MAF to look at ET-128. Have installed two of the titanium yokes. All ice frost ramps, LOX and LH2 tank are in work, and are preparing for a longeron spray. LNC feedlines are in final checkout and ready to be installed,\u2019 noted processing information. <\/p>\n<p>\u2018Critical path remains through ice\/frost ramp installation activities and longeron sprays. Have all lower ice\/frost ramp pours in place; puts them in position to begin faring installations and pressurization line installation activities.\u2019<\/p>\n<p><em><u>Preparing for 2008:<\/u><\/em><\/p>\n<p>Despite failing to make it four flights in a year for the first time since 2002, the amazing recovery from major processing issues, such as the hail damage to STS-117\u2019s External Tank, the leaking MLG strut on Discovery and the ambitious processing flow plan for dual High Bay use, has seen 2007 become an overall&nbsp;success for the shuttle program.<\/p>\n<p>This was noted by deputy shuttle program manager Kim Doering at the latest Stand-up meeting, with her added emphasis on 2008 \u2013 arguably the most important year of shuttle operations for a decade, with around five missions, including the final trip to service Hubble. <\/p>\n<p>\u2018It has been an amazing year. This is the time to recuperate, because next year will be busy as well,\u2019 Ms Doering noted. \u2018Many folks had to sacrifice time away from friends and family. Hope when you reflect back on accomplishments, that you feel it was time well used. <\/p>\n<p>\u2018Have done good work here and are proud of the team.\u2019<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 and STS-120&nbsp;Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While the focus continues on the replacement of a suspect connector inside Atlantis\u2019 External Tank, engineers are evaluating a problem with a radiator hose on Discovery \u2013 which is causing a launch constraint concern with STS-122. While the hose will likely be replaced on Discovery, engineers are assessing if they need to gain access to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41518","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41518"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41518"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41518\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}