{"id":41522,"date":"2007-12-19T22:16:20","date_gmt":"2007-12-19T14:16:20","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-122-eight-options-under-evaluation-for-connector-repair\/"},"modified":"2007-12-19T22:16:20","modified_gmt":"2007-12-19T14:16:20","slug":"sts-122-eight-options-under-evaluation-for-connector-repair","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-122-eight-options-under-evaluation-for-connector-repair\/","title":{"rendered":"STS-122: Eight options under evaluation for connector repair"},"content":{"rendered":"<p>NASA managers will decide on one of eight options over the next seven days, options that will mitigate the problems associated with the LH2 Feedthrough connector, which was identified as the cause of the recent ECO (Engine Cut Off) sensor\/circuit issues.\n<\/p>\n<p>  Three of the options hold potential for allowing STS-122 to target launch on January 10, while the other five incur delays ranging up to around February 15.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special NOW LIVE.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Special: 12 MOD Flight Readiness Review (FRR) Presentations, Baselines and Mission Overviews. 17 Shuttle FRR Presentations. Payload Presentations and vast amounts of live, uploaded images and presentations. Installation Movies (several)&nbsp;\u2013 already 1600&nbsp;megabytes strong** <\/font><\/em><\/p>\n<p>**COMPLETE Section on ECO\/Feedthrough Connector issues and troubleshooting, graphical and data based \u2013 expansive.**<\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Atlantis&nbsp;STS-122 Troubleshooting Latest**<\/em><\/font><\/p>\n<p>**Click here for FRR&nbsp;overview articles: Article 1 \u2013 Article 2**&nbsp;&nbsp;\u2013 Click *HERE* for all our articles on the STS-122 ECO\/Feedthrough Connector&nbsp;issue.<\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><u>Troubleshooting Effort:<\/u><\/em><\/p>\n<p><!--StartFragment --><\/p>\n<p>A brilliant engineering effort pre-empted the identification of the issue \u2013 one which was tagged as the leading culprit days ahead of Tuesday\u2019s tanking test. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"156\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=37765\" width=\"214\" align=\"left\" vspace=\"5\" border=\"0\/\">Use of the Time-Domain Reflectometry (TDR) equipment came as part of a plan that been long in the making, as engineers made a concerted effort to get to the bottom of the problem that was causing the related launch scrubs. <\/p>\n<p>At the center of the efforts has been Ed Mango, a long time shuttle\/orbiter manager, who was hoping his troubleshooting plan would gain the data required via similar failures during the tanking test. <\/p>\n<p>\u2018It has been a long two weeks for many of us, but here we are ready to test our spaceship and try to determine what is going on with the ECO System. The Launch Team has done very well in getting the requirements, procedures and preps completed. The Troubleshooting Team has developed the best way to capture the failure,\u2019 he wrote to his team ahead of the tanking test. <\/p>\n<p>\u2018I know we are ready for tomorrow (Tuesday). The data will drive us. Evidence of a failure will be outstanding news because of the tools we have in place to capture the location and other characteristics about the condition. Lack of evidence of a failure within the ECO System will allow us to think differently about our Go Forward plans.<\/p>\n<p>\u2018I feel honored to represent this team and am taken back by all that was accomplished in about a weeks time. A clear, methodical, \u2018can-do\u2019 attitude is what each of you had to get us to this point. The energy by everyone was contagious, and helped foster our ability to be comfortable with our test plan for tomorrow.\u2019<\/p>\n<p><em><u>Go Forward Plan:<\/u><\/em><\/p>\n<p>Those \u2018Go Forward\u2019 plans are now being evaluated, ahead of a decision on which path to take by PRCB (Program Requirements Control Board) during this week \u2013 or possibily next week.<\/p>\n<p>Of the eight options, only one notes a plan of leaving the connector hardware in place \u2018as-is\u2019 \u2013 an option which appears likely to be dismissed. Information following the test recommends taking the opportunity of removing and replacing (R&amp;R) the connector to allow for forensic examination.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 205px; HEIGHT: 147px\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with an&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available and HUD videos from STA landings. Now includes HALO II Re-entry video, and re-entry videos from Gemini and Apollo (converted from 8mm)**<\/em><\/font><\/p>\n<p>Information on the available options under evaluation also note that there are only a limited number of options can be done on pad within current NET (No Earlier Than) launch target \u2013 that opens on January 10. However, that launch target has not yet been ruled out.<\/p>\n<p>The options show targeted completion dates for the work involved, with all but three options allowing for the stack to remain at the pad.<\/p>\n<p>The opening option \u2013 which involves further testing, but no replacement of connector hardware in the tank \u2013 allows for work to be completed by January 4. However, this option is being noted by sources as unviable.<\/p>\n<p>The following two options are gaining a lot of attention, with both procedures showing completion dates in time to make the January 10 launch date. These two options (Option 2 and 3) involve replacing the external element of the connector with \u2018cherry-picked\u2019 pins\/sockets from existing stock.<\/p>\n<p>Further options, such as option 4, involve larger changes to the make up of the connector, replacing the external plug of the connector with an internal plug, which would eliminate the element of hardware believed to be the cause of the problem. This option, however, would not allow for work to be completed until January 25.<\/p>\n<p>Option 5 has a similar schedule, involving the soldering of the external sockets \u2013 allowing for a better Pin\/Socket connection. Qualification and testing takes up the bulk of the schedule with this option, but is the final option available for work at the pad.<\/p>\n<p>A requirement to rollback is based around the internal elements of the connector, which would require the clean room environment inside the Vehicle Assembly Building (VAB) \u2013 last seen during the ECO sensor replacement work on two previous tanks.<\/p>\n<p>A PRCB meeting on Wednesday is likely to reduce the options yet further, before making a final decision \u2013 within a week. In the interim, each favored option will have its schedule refined.<\/p>\n<p>In parallel, more data is being gathered on the connector hardware via testing at the Michoud Assembly Facility (MAF) in New Orleans. This will allow for additional data not only for the mitigation efforts for STS-122 and STS-123, but for future flights down the schedule.<\/p>\n<p>\u2018Testing is underway at MAF and at MSFC on feedthrough connectors. This testing is aimed at answering questions about the plausibility of cryopumping through the connector\/wire harness assembly, nanofocus x-ray examination of connector response to cryo temps, and failure analysis of the ET-120 external connector non-metallics,\u2019 added information.<\/p>\n<p>Following the conclusion to Wednesday\u2019s PRCB, managers decided to give the gohead to start removing foam from the aft of the tank at the manhole access point. This work will take place this weekend.<\/p>\n<p>Further updates\/articles will follow\u2026<br \/><em><br \/><\/em><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers will decide on one of eight options over the next seven days, options that will mitigate the problems associated with the LH2 Feedthrough connector, which was identified as the cause of the recent ECO (Engine Cut Off) sensor\/circuit issues. Three of the options hold potential for allowing STS-122 to target launch on January [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41522","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41522"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41522"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41522\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}