{"id":41541,"date":"2007-11-22T18:09:41","date_gmt":"2007-11-22T10:09:41","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/ares-i-and-orion-technical-interchange-meetings-complete\/"},"modified":"2007-11-22T18:09:41","modified_gmt":"2007-11-22T10:09:41","slug":"ares-i-and-orion-technical-interchange-meetings-complete","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/ares-i-and-orion-technical-interchange-meetings-complete\/","title":{"rendered":"Ares I and Orion Technical Interchange Meetings complete"},"content":{"rendered":"<p>NASA Constellation (CxP) has completed the two-week Integrated Stack (IS) Technical Interchange Meeting (TIM), which has cleared the way for the start of the PDR (Program Design Review) stage.\n<\/p>\n<p>  In tandem, engineers have wrapped their evaluations on the Orion weight issues, with the Orion Vehicle Engineering Integration Working Group (OVEIWG) completing the first stage of \u201cbuy back\u201d capability to the ZBV (Zero Base Vehicle) Orion.<br \/>\n<em><font face=\"Arial\" size=\"2\"><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/em><\/p>\n<\/p>\n<p>Huge amounts of VSE related insider news, presentations and videos \u2013 THE most comprehensive place to follow Ares\/Orion development \u2013 are <font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>available for download on L2<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>. <\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>See list at the end of this article. <\/em><\/font><\/p>\n<p>All of this article is based on documented L2 information. For an overview of how L2 works, <font color=\"#ff3300\">**click here for sample**<\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**ARES I \/ ORION LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><font color=\"#0000ff\">**ARES V \/ Mars Transport Vehicle (MTV) LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><u>TIM Concluded:<\/u><\/em><\/font><\/p>\n<p>Confirming the end of the TIM, NASA sent out&nbsp;notes to program heads, claiming a number of \u2018open issues\u2019 have now been resolved \u2013 although the information failed to note exactly what issues have been removed from the evaluations.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The Constellation program has completed its two-week Integrated Stack Technical Interchange Meeting. A magnificent MOD (Mission Operations Directorate) team effort was made to cover several parallel splinter sessions,\u2019 noted the information.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Across the program, a tremendous number of open issues were resolved, with a good bit of forward work to flow into the program design analysis cycle. The final outcome depends on approval of a directive at a couple upcoming Constellation Control Boards \u2013&nbsp;and it is expected that some decisions will drive increased cost risk. We can summarize our outcome as follows: <\/font><\/p>\n<p>\u20181) No losses in vehicle operability. 2) Eliminated numerous TBD\/TBR\u00e2\u20ac\u2122s in our Mission Systems requirements \u2013 primarily things that probably did not belong in the requirements documents. 3) A further refinement of the forward plan for the requirements.\u2019<\/p>\n<p><em><u>Ares I issues:<\/u><\/em><\/p>\n<p>With regards to&nbsp;Ares I, NASA claim only a few \u2018operability issues\u2019 remain. However, there are still large scale design issues to be worked out, such as the nozzle redesign and trade studies on a decision relating to&nbsp;first stage expendability,&nbsp;with the latter noted as a 3000 lbs payload saving, via the deletion the recovery package \u2013 if adopted.<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"190\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=36408\" width=\"146\" align=\"left\" vspace=\"5\" border=\"0\/\">Acoustics environments issues \u2013 classed as \u2018serious threats to the program\u2019 include thrust oscillation and coupling vibrations on the first stage of Ares I. <\/font><\/p>\n<p>The TIM, discussing the issues as \u2018Induced Environments: vibration and acoustic sound pressure,\u2019 noted these&nbsp;are among the primary issues being worked. Solving the problem&nbsp;has led to the formation of a Tiger Team, tasked with reporting back on their findings in March, 08. <\/p>\n<p>Other issues for Ares I include Upper Stage \u2018Pogo\u2019 concerns \u2013 which will likely see the addition of suppression system, and undesirably, mass. Also being evaluated is the potential of J-2X shutdown thrust transients, which could impose a minus 0.4 g tension loading, along with a plus or minus 0.4 g lateral loading, on the Upper Stage and the Orion Service Module.<\/p>\n<p>On the positive side of the information, the ascent target for Ares I is now 10\u00d7100 nmi, up from the previously noted -11\u00d7100. In addition, confirmation was also noted that Ares V has been re-baselined with a 10 meter EDS (Earth Departure Stage) and 10 meter fairing, in response to the initial lunar design cycles. <\/p>\n<p><font face=\"Arial\" size=\"2\"><em><u>Orion ZBV efforts:<\/u><\/em><\/font><\/p>\n<p>Meanwhile, the Orion Project has completed adding back Level 1 (safety requirement) items, and is working with OVEIWG to assess Level 2 (operability and mission success) items. <\/p>\n<p><font face=\"Arial\" size=\"2\">Weight growth is now under control, but optimization will continue to avoid future threats. A strategy for implementing block updates is now&nbsp;in work to study improvements to later variants of Orion down the road.<\/font><\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\">\u2018A CxPO team briefed NASA HQ on results of the IS TIM and Orion\u2019s OVEIWG weight scrub. Orion and Ares were given the go to<\/font><font color=\"#0000ff\"> <\/font><font face=\"Arial\" size=\"2\">start working to Preliminary Design Review (PDR), signifying an acceptable closure of the architecture and a successful System Definition Review (SDR),\u2019 noted NASA documentation. <\/font><\/p>\n<p>\u2018While there are a number of forward actions, the IS TIM directive closes a critical set of open issues, and signifies completion of Phase A for the flight elements. Mission Ops, Ground Ops<font color=\"#0000ff\">,<\/font> and EVA are scheduled to complete their SDR\u2019s in the spring and we also look forward to entering Phase B.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><u>Mobile Launcher and Ares I-Y:<\/u><\/em><\/font><\/p>\n<p>In other news, the Mobile Launcher (ML) is on track for its contract to be handed out, with an aim to start construction in February 2008. Work will run through December 2009, with ground support equipment installation from January 2010 through July 2011. Testing and activation of the systems is scheduled for October 2011 through March 2012 in preparation of Ares I-Y in September 2012. <\/p>\n<p><font face=\"Arial\" size=\"2\">All dates are liable for a few months delay, due to concerns over the schedule of the first test flight, Ares I-X, currently aiming for April, 2009.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The primary concerns for the Ares I ML are the lift-off drift curves, which is how far the vehicle can drift horizontally on launch do to wind. The concern is that the vehicle may impact the tower in higher than anticipated winds, leading to stingier weather requirements. <\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=36407\" width=\"199\" align=\"left\" vspace=\"5\" border=\"0\/\">The other issue is that the current hold down post system is not compatible with the new SRB extended nozzle, as per current trade study.<\/p>\n<p><font face=\"Arial\" size=\"2\">A multitude of reviews and discussions are taking place to determine the content of the Ares I-Y test flight. Ares I-Y will be the first flight of a production first stage, a real second stage without a J2-X, and a real Orion without a LAS (Launch Abort System). <\/font><\/p>\n<p>An Operations Panel is looking into the ability for an increased role for the test flight, to be determined.<\/p>\n<p><em><u>Constellation PET:<\/u><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, the Constellation Program Excellence Team (PET) continues to address scenarios focused to increase the ESMD Headquarters and Constellation Program effectiveness by refining integrated headquarters, program and project roles, responsibilities, and processes. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Current roles and processes should be judged on their usefulness in achieving the Constellation mission. The PET reviewed and approved a proposed draft ESMD Level I Program Executives (PE\u2019s) roles and responsibilities,\u2019 note the PET leaders. <\/font><\/p>\n<p>\u2018Future scenarios include a Construction of Facilities (CoF) approval process, updated Interface Requirements Documents (IRDs)\/Interface Control Documents (ICDs) management structure and scope, NASA insight of NASA in-house work, and team working relationships. A Constellation Program Excellence Team face-to-face is being scheduled for the first week in December along with a Constellation Program retreat,\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\">The second Mission Operations (MO) Project Standing Review Board (SRB) Systems Definition Review (SDR) assessment was held on October 29 and 30. The board is pushing to lower operations costs and improve acquisition strategies by conducting an independent assessment. <\/font><\/p>\n<p>MO has been \u2013 and continues to be \u2013 engaged with the ZBV operations assessment, flight software integration and production process, and an independent cost assessment process.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"267\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=19781\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\/\">Selection of L2 Resources For Ares I, V and Constellation:&nbsp;Orion\/Ares I\/Atlas V Heavy<!--StartFragment -->&nbsp;NEO Feasibility Study (Video).<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;Constellation EVA Study Presentation. Superb Gene Kranz address to&nbsp;CxP&nbsp;workforce&nbsp;(Apollo to Orion feature) video. MOD \u2018LEO to Mars\u2019 presentations.<\/em><\/font><\/p>\n<p>Superb Ares I Launch Ascent, Pad&nbsp;Abort Test CGI Videos (three). Integrated Stack (IS) Technical Interchange Meeting (TIM) \u2013 Nov 6 to Nov 15. The full \u20188th Floor News\u2019 \u2013 Constellation Update (performance issues) \u2013 Nov 5. Ares I Mobile Launcher PMR.<\/p>\n<p><em>\u2018Proposed\u2019 Ares I SRBSF (Mini VAB) and graphic. LSAM (LDAC-1) Video and Images. Several Constellation All Hands Videos and Presentations. Ares I Pad Rollercoaster (Old and New presentation and slides \u2013 the very cool \u2018CGI ride on the Ares pad coaster\u2019 video. Ares I VAB \u2018In-Line\u2019 Stacking presentation slides.<\/em><\/p>\n<p><em><i><font face=\"Arial\"><\/font><font size=\"2\">Presentation of Ares\/Orion impacts relating to Shuttle manifest acceleration. Ares I Interstage diagrams. Ares V Super Crawler. Ares I Launch Pad images (ML etc.) Hi Res images of Ares I-X Upper Stage. Orion 606-7 Data Updates. Updates Constellation launch schedule through to Orion 15. Orion Seat test photos. New ML Graphic and info. New Ares V graphic and baseline data. Large collection of hi res Orion paracute drop tests. SIX Part Series of Ares I Upper Stage Graphical Overviews. DAC-1C DDD Vast Slides on Vehicle Design. ATK First Stage Presentation. 39B Lightning Towers Slides. DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes). <\/font><\/i><\/em><\/p>\n<p>Orion\/CEV Display Layout Presentation (40 pages). ATK figures on the 5-Seg Booster weight for CLV. Weather Shield (Rain Shield) for Orion on the pad. New Super hi-res images of Ares I. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation. <\/p>\n<p><font face=\"Arial\" size=\"2\">Orion Launch Abort System (LAS) overview presentation. Changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CLV Umbilical Trade Matrix XLS. Vehicle interfaces for the DAC 1C version of Orion Ares. Ares I-X Test Flight Plan (full outline) Presentation. Ares I-X timeline and modification expanded info. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. CLV DAC-1C (Changes to CLV Upper Stage). <\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"101\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" width=\"180\" align=\"left\" vspace=\"5\" border=\"0\/\">Ares I-X: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. ATK figures on the 5-Seg Booster weight for CLV. <\/p>\n<p><font face=\"Arial\" size=\"2\">90 Minute Video of Constellation all hands meeting. Escape System Trade Study Presentation. CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.<\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA Constellation (CxP) has completed the two-week Integrated Stack (IS) Technical Interchange Meeting (TIM), which has cleared the way for the start of the PDR (Program Design Review) stage. In tandem, engineers have wrapped their evaluations on the Orion weight issues, with the Orion Vehicle Engineering Integration Working Group (OVEIWG) completing the first stage of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41541","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41541"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41541"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41541\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}