{"id":41553,"date":"2007-11-08T22:12:07","date_gmt":"2007-11-08T14:12:07","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-122-undergoes-pre-frr-examination\/"},"modified":"2007-11-08T22:12:07","modified_gmt":"2007-11-08T14:12:07","slug":"sts-122-undergoes-pre-frr-examination","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-122-undergoes-pre-frr-examination\/","title":{"rendered":"STS-122 undergoes pre-FRR examination"},"content":{"rendered":"<p>A large series of pre-Flight Readiness Reviews (FRRs) have been taking place this week, ahead of the December launch of Atlantis and the European Columbus module.\n<\/p>\n<p>  The fourth launch of the year is still on track to make the short December window \u2013 pending outstanding stage work on the International Space Station (ISS) \u2013 as the \u201cShuttle Surge\u201d continues its major offensive on completing station assembly.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>L2: STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-122 L2 Special&nbsp;starts this weekend.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample of L2 menu and content**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\"><\/font><font size=\"2\">**STS-122 Mission Documentation Build-Up&nbsp;Surge&nbsp;already in work on L2 \u2013 now including 12 MOD Flight Readiness Review (FRR) Presentations \u2013 Nov 5, Baselines and Mission Overviews**<br \/><\/font><\/em><br \/><font color=\"#0000ff\"><em>**LIVE updates on Discovery&nbsp;STS-120 Post Flight and STS-124 Processing**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE news updates on Atlantis&nbsp;STS-122 VAB Processing**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<\/p>\n<p>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<\/p>\n<p>&nbsp;<em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p><em><u>Atlantis\/STS-122&nbsp;Latest: <\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" style=\"WIDTH: 221px; HEIGHT: 196px\" height=\"30\" alt=\"\" hspace=\"5\" src=\"http:\/\/aerospacescholars.jsc.nasa.gov\/HAS\/cirr\/Images\/esa1lg.jpg\" width=\"28\" align=\"left\" vspace=\"5\" border=\"0\/\">Processing has continued without issue, as the stacked Atlantis, ET-125 and twin Solid Rocket Boosters undergo final preparations for rollout to Pad 39A early on Saturday morning. <\/p>\n<p>December 6 remains as the launch target for STS-122, although managers are currently monitoring how well stage work progresses on the ISS, with EVA-5 pushed from STS-120 into the schedule of Expedition 16, adding to work that has to be completed before the station is ready to receive Columbus.<\/p>\n<p>STS-122 will also conduct an Expedition 16 crew rotation on the ISS, with ESA (European Space Agency) astronaut Leopold Eyharts \u2013 a French Brigadier General \u2013 swapping places with NASA astronaut Daniel Michio Tani, who arrived on STS-120. <\/p>\n<p>\u2018SSP (Space Shuttle Program) is marching toward December 6, 2007 launch of Atlantis (STS-122). We intend to have all our reviews on a schedule supporting that date,\u2019 noted shuttle manager Wayne Hale on the latest Stand-up\/Integration report.<\/p>\n<p>Those \u2018reviews\u2019 reference the pre-FRRs which all lead up to the Agency SOMD FRR just days ahead of launch,&nbsp;following the new path debuted with STS-120\u2019s final FRR. <\/p>\n<p>Monday saw the completion of the MOD FRR, which produces the bulk of the documentation outlining mission status, alongside other departments conducting their pre-FRRs, which will eventually head into next week\u2019s SSP FRR \u2013 a precursor review ahead of the final launch date decision. (click link for three SSP FRR review articles from STS-120).<\/p>\n<p>\u2018SSP FRR will be November 13 and 14, 2007 at KSC. Due to Executive schedules, we\u2019re constrained to have the Executive FRR on November 20, 2007,\u2019 added the Stand-up. <\/p>\n<p>No decision will be made on the launch date until the ISS is ready to refine the schedule to show how far their have progressed in preparing the station for Columbus. However, at this stage, a few days delay to the launch date can be&nbsp;expected, although December 6 is still possible \u2013 and won\u2019t be ruled out until the SOMD FRR at the earliest.<\/p>\n<p>\u2018ISS is working hard to do reconfigurations needed between undocking of STS-120 and docking of STS-122. Currently doesn\u2019t look like can make December 6, 2007 by a few days, but may pull this back in,\u2019 added Hale at the Stand-up. \u2018We will continue to work toward December 6, 2007 until further notice and keep track of ISS.<\/p>\n<p>\u2018Cautioned it has been his goal to get STS-122 up and down before Christmas. If launch is December 6, 2007, landing should be December 20, 2007. If there is 3-4 day slip, due to ISS reconfiguration, then it will run closer to the holidays. Our first job is to support ISS, so be ready.\u2019 <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**(NOW INCLUDES STS-118 Re-Entry Video) Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Now includes HALO II Re-entry video**<\/em><\/font><\/p>\n<p>As noted by shuttle management at the post landing press briefing for STS-120, the launch window may actually gain a day of flexibility, with the end of the window currently December 13, but with the potential to move into December 14. This was also outlined in Monday\u2019s MOD FRR presentations. <\/p>\n<p>\u2018Current launch period extends between December 6 through December 13. Constrained by mated beta angle constraint of 65 deg,\u2019 noted the MOD FRR Presentation on Flight Design and Dynamics. \u2018December 13 assumes +1 day is used as a docked day. December 14 is a viable launch date if SSP agrees that +1 day will be used post undock.<\/p>\n<p>\u2018Geminid meteor shower peaks on December 14. Not a constraint to launch window. Monitoring crew activities during launch period.\u2019 <\/p>\n<p>By all accounts, the MOD FRR and departmental pre-FRRs have proceeded smoothly, with no major issues outstanding with Atlantis. However, NASA do not take chances with their orbiters, as exemplified by an addition note on the Stand-up, pointing towards a request by the new NASA Chief Engineer, who is asking for more information on how the SSP deal with unexplained anomalies.<\/p>\n<p>\u2018New NASA Chief Engineer requested discussion of unexplained anomalies (UAs), so Mr. Hale wants two examples of UAs from each Element for FRR next week (a recent UA and an older UA that is still enforced). Include in back-up material a brief description and discussion of why is acceptable. Also need the number of UAs still open in each Element, if feasible.\u2019<\/p>\n<p>STS-122\u2019s FRR process holds the key to the vast amount of pre-flight processing that takes place with an orbiter, as engineers continue to add modifications and flight safety features to the fleet.<\/p>\n<p>For example, this will be the first flight of the ATK-produced BSMs (Booster Separation Motors) flying in the forward section of the SRB. Atlantis will also debut a new ET Umbilical Camera Flash (Sync Cable and Flash), which is an improvement for the ability to collect imagery of the expended External Tank (ET) after separation on orbit, in order to evaluate any foam liberation from the tank.<\/p>\n<p>Debris source mitigation has been worked with OMS Pod Ceramic Inserts Replacement With Bonded FRSI Plugs, while other modifications include ECO (Engine Cut Off) Point Sensor System Wire Separation, as part of the ongoing effort to fully understand the issues relating to the <u><font color=\"#0000ff\">ECO sensors on early Return To Flight missions<\/font><\/u>. <\/p>\n<p><em>A full round up of the FRR presentations generated this week \u2013 and available to download in L2 \u2013 will be added to forthcoming articles.<\/em><\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation and quotes&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A large series of pre-Flight Readiness Reviews (FRRs) have been taking place this week, ahead of the December launch of Atlantis and the European Columbus module. The fourth launch of the year is still on track to make the short December window \u2013 pending outstanding stage work on the International Space Station (ISS) \u2013 as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41553","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41553"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41553"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41553\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}