{"id":41560,"date":"2007-10-31T21:11:22","date_gmt":"2007-10-31T13:11:22","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-change-eva-4-for-array-repair-via-ambitious-plan\/"},"modified":"2007-10-31T21:11:22","modified_gmt":"2007-10-31T13:11:22","slug":"nasa-change-eva-4-for-array-repair-via-ambitious-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-change-eva-4-for-array-repair-via-ambitious-plan\/","title":{"rendered":"NASA change EVA-4 for array repair, via ambitious plan"},"content":{"rendered":"<p>NASA are working a plan to conduct the repair of the two rips in the P6 4B Solar Array on a 24 hour delayed EVA-4. Since delayed again to Saturday.\n<\/p>\n<p>  The plan is still being worked, though it will involve a spacewalker being sent to the damaged area on the end of the Space Station Remote Manipulator System (SSRMS) and the OBSS (Orbiter Boom Sensor System) arm. Major evaluations are taking place on how long the OBSS\u2019 sensor package can survive during the operation.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>Extensive STS-120 Special Section on L2,&nbsp;including Flight Plans, ALL Handbooks and Checklists, Manuals, documentation and presentations. STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p>STS-120 L2 Special&nbsp;includes over 1600mb of presentations,&nbsp;over 45 Flight Data Files, Manuals,&nbsp;Memos&nbsp;and Exclusive Hi Res Images&nbsp;and video \u2013 the most expansive overview of the mission.&nbsp;<em><font color=\"#0033ff\">**Click&nbsp;here for sample**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\">L2 FLIGHT DAY LIVE: MER\/MOD\/MMT Live Updates (live console updates, live MMT presentations, for every flight day)<\/font><\/em><\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Discovery&nbsp;STS-120 FLIGHT DAYS**<\/em><\/font><\/p>\n<p><em><u><\/u><\/em><\/p>\n<\/p>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>Article:<em><u><\/u><\/em><\/p>\n<\/p>\n<p><em><u>P6 4B Repairs:<\/u><\/em>&nbsp;<\/p>\n<p>Flight Day 8\u2019s deployment of SAW 4B, consisting of two photovoltaic blankets, each made up of 31 individual segments (bays), was aborted at 12:25pm when one of the bays showed a tear at its corner. Another smaller tear can be observed in hi res images of the damage. <\/p>\n<p>While the array is providing good power, structural integrity is the key factor for carrying out a repair. <\/p>\n<p>The plan is to work on a method of repairing the array ahead of EVA-4. Delaying EVA-4 and cancelling EVA-5 will allow NASA to work on a procedure. This proceedure&nbsp;\u2013 which is still&nbsp;at the planning stage \u2013&nbsp;may take engineers a while to figure out, and has since seen EVA-4 delayed to Saturday.<\/p>\n<p>As far as how the array suffered the tear during deployment, this is still being evaluated. However, it appears one of the guidewires snagged in a grommet. <\/p>\n<p>\u2018We believe one of the three guidewires snagged on one of the grommets, which started tearing out the hinge,\u2019 said ISS program manager Mike Suffredini. \u2018We retracted one bay to relieve some of the stress.\u2019<\/p>\n<p>If EVA-4 fails to repair the array, the program holds the option of added another docked day to STS-120, allowing for another spacewalk to try and find a solution. <\/p>\n<p>\u2018If EVA-4 is not successful, which is a possibility, we would like to have the option to pursue EVA-5 on Sunday. We would have to delay departure of Discovery by another day,\u2019 added Suffredini. <\/p>\n<p>\u2018This is our priority as a program. We need this array. It could gain further damage if we leave it in this configuration.\u2019<\/p>\n<p>The main area of conversation at the MMT relates to the trade-offs that would be required to allow a spacewalker to ride up to the damaged area, on top of the SSRMS and OBSS. <\/p>\n<p>The plan to use the SSRMS and OBSS in tandem (as seen in the image associated with this article) has now been confirmed.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**(NOW INCLUDES STS-118 Re-Entry Video) Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Now includes HALO II Re-entry video**<\/em><\/font><\/p>\n<p>While the challenge of having a spacewalker on the end of both booms is obvious, the plan&nbsp;has been deemed as having no expected structural issues for the two arms. <\/p>\n<p>However, the main focus relates to potential damage to the OBSS\u2019 sensor package, which would compromise the full capability of&nbsp;Late Inspections of Discovery\u2019s Thermal Protection System (TPS)&nbsp;after undocking. <\/p>\n<p>The OBSS sensor package is at risk of suffering a failure during the EVA repair, due to its \u2018thermal clock\u2019, which ranges from two hours for most instruments, to five hours for LDRI if warmed up and covered with a large ORU bag ahead of the EVA.&nbsp;<\/p>\n<p>At present, the OBSS is expected to survive, due to the high beta angle, which will allow the sensor package to stay \u2018warm enough\u2019 during the operation.<\/p>\n<p>Should damage occur to the OBSS, Late Inspections would be conducted only via the Discovery\u2019s RMS, which has slightly higher risk numbers, especially after \u2013 and still&nbsp;under consideration \u2013 the \u2018large\u2019 MMOD strike that was picked up by the WLE (Wing Leading Edge) sensors on Tuesday.<\/p>\n<p>The 2.74 GRMS indication is classed as a \u2018significant hit\u2019 on the port (left) panel 1. The indication was triple the maximum ever observed, noted NASA information. However, should there be MMOD damage on the panel, this would at least be spotted without the need of the OBSS\u2019 sensors.<\/p>\n<p>Regardless, NASA are working on contingencies for the OBSS, including the removal of certain sensors, to be left in an unpressurized airlock during the EVA, and the potential swapping around of cameras.<\/p>\n<p><font face=\"ArialNarrow-Bold\" color=\"#00009a\" size=\"5\"><\/font><font face=\"Arial\" color=\"#000000\" size=\"2\">\u2018If the Sensor Package 1 Pan Tilt Unit is not operational after the Solar Array Repair task, the PTU could possibly be swapped out for an Orbiter Payload Bay Camera PTU,\u2019 noted one MMT presentation.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018There are 2 other flight LCS units available to the Program currently in flow for other flights.<\/font><\/p>\n<p align=\"left\"><font face=\"Arial\" size=\"2\">\u2018The next need date for this particular unit would be mid Feb 2008 for STS-125. However, if the LCS fails due to thermal overstress, there are spare parts available for repair or for an additional unit build.\u2019<\/font><\/p>\n<p>With the changes to the mission timeline, the inspection of the starboard SARJ (Solar Alpha Rotary Joint) has been deleted from STS-120.<\/p>\n<p>MMT presentations now uploaded into L2. Work in progress repair plan also uploaded.<\/p>\n<p>See live threads for up-to-the-second live coverage.<\/p>\n<p><font color=\"#0000ff\"><em>L2 members<\/em><\/font><em>: All documentation and quotes&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA are working a plan to conduct the repair of the two rips in the P6 4B Solar Array on a 24 hour delayed EVA-4. Since delayed again to Saturday. The plan is still being worked, though it will involve a spacewalker being sent to the damaged area on the end of the Space Station [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41560","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41560"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41560"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41560\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}