{"id":41566,"date":"2007-10-26T23:25:21","date_gmt":"2007-10-26T15:25:21","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/eva-1-completed-as-node-2-joins-the-iss\/"},"modified":"2007-10-26T23:25:21","modified_gmt":"2007-10-26T15:25:21","slug":"eva-1-completed-as-node-2-joins-the-iss","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/eva-1-completed-as-node-2-joins-the-iss\/","title":{"rendered":"EVA-1 completed \u2013 as Node 2 joins the ISS"},"content":{"rendered":"<p>Flight Day 4 of STS-120 has seen the conclusion to the opening spacewalk of what will be five EVAs during the mission. Discovery astronauts Scott Parazynski (EV1) and Doug Wheelock (EV2) completed with the six hour 14 minute spacewalk.\n<\/p>\n<p>  Friday has also seen the robotic ballet of removing the Node 2 \u201cHarmony\u201d module from Discovery\u2019s payload bay, for installation on the International Space Station (ISS).\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=31173\" width=\"212\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><font color=\"#ff0000\"><em>Extensive STS-120 Special Section on L2,&nbsp;including Flight Plans, ALL Handbooks and Checklists, Manuals, documentation and presentations. STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em><br \/>\n<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em>STS-120 L2 Special&nbsp;includes over 1000mb of presentations, over 45 Flight Data Files, Manuals,&nbsp;Memos&nbsp;and Exclusive Hi Res Images&nbsp;and video \u2013 the most expansive overview of the mission.&nbsp;<\/em><\/font><em><font color=\"#0033ff\">**Click&nbsp;here for sample**<\/font><\/em><\/p>\n<p><em><font color=\"#ff0000\" size=\"3\">L2 FLIGHT DAY LIVE: MER\/MOD\/MMT Live Updates (live console updates, live MMT presentations, for every flight day)<\/font><\/em><\/p>\n<p><font color=\"#0000ff\" size=\"3\"><em>**LIVE updates on Discovery&nbsp;STS-120 FLIGHT DAY 4**<\/em><\/font><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p><em><u>EVA-1 Objectives:<\/u><\/em><\/p>\n<p>The main objectives of EVA-1 include the SASA (S-band Antenna Support Assembly) retrieval from the Z1 truss and transfer to Shuttle cargo bay for stowage in SASA FSE (Flight Support Equipment); Node 2 preparation for unberthing from the payload bay, and PDGF (Power and Data Grapple Fixture) removal from payload bay for temp stowage on Node 2. <\/p>\n<p>They will also disconnect Z1 to P6 fluid umbilical QDs (Quick Disconnects); Install P6 Aft PVR (Photovoltaic Radiator) shroud; and Install P6 SSU (Sequential Shunt Unit) shroud, plus photo ops; and monitor unberthing of Node 2. <\/p>\n<p>ISS commander Peggy Whitson was tasked with looking after the spacewalkers, following their overnight campout. After the air was vented out of the Quest Airlock, Whitson gave Parazynski and Wheelock \u2013 who is making his debut EVA \u2013 the green light to get ready to egress into space. <\/p>\n<p>\u2018Ok, time to let you go out and play,\u2019 said Whitson. Later to be followed by \u2018Sweet! You\u2019re not going to believe this,\u2019 as the spacewalkers opened up the hatch, to reveal Earth, 200 miles \u2018below\u2019 them.<\/p>\n<p>The official start of EVA-1 was 5:02am Central Time, with Parazynski egressing first, out on to the awaiting Space Station Remote Manipulator System (SSRMS)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**(NOW INCLUDES STS-118 Re-Entry Video) Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Now includes HALO II Re-entry video**<\/em><\/font><\/p>\n<p>Earlier, robotic preparations took place on board ISS, ahead of the use of the Space Station\u2019s robotic arm (SSRMS), which then moved to grapple Node 2, before delivering it to a temporary spot on Node 1 \u2018Unity\u2019. <\/p>\n<p>The module will eventually be moved to the PMA-2 (Pressurized Mating Adapter 2) after Discovery undocks. The official time of Node 2 joining the ISS was 10:30am Central Time.<\/p>\n<p>Harmony is the first addition to the Station\u2019s pressurized volume since the arrival of the Russian Pirs docking compartment in 2001. The installation of Harmony paves the way for the addition of the European Columbus laboratory in December 2007, and the Japanese Kibo laboratory in April next year.<\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><u>Latest Issues \u2013 or lack thereof<\/u><\/em><\/font><br \/>\n<font face=\"Arial\" size=\"2\">The mission continues to be flawless for Discovery, as she heads through Flight Day 4. Listed as \u2018funnies\u2019 by the Mission Evaluation Room (MER) at the Johnson Space Center (JSC), only two notes of interest are being looked into.<\/font><br \/>\n<font face=\"Arial\" size=\"2\"><\/font>&nbsp;<br \/>\n<font face=\"Arial\" size=\"2\">\u2018Have two funnies: 1<b><\/b>) When crew manipulated the MPM on AC3 mid-2 circuit breaker for OBSS (Orbiter Boom Sensor System) Ops, deploy was hard pulling out and hard receding. <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Team is looking at it, but don\u2019t think it\u2019s a concern,\u2019 noted the latest Shuttle Stand-up\/Integration&nbsp;report.&nbsp;\u2018Think is only a sticky breaker, but will keep a close watch on it. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font>&nbsp;<br \/>\n<font face=\"Arial\" size=\"2\">\u2018Secondly, Galley sensor rate was low on cold water side. Saw this on previous missions. Crew understands how to bias this for EVA drink bag fill and food re-hydration.\u2019<\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font size=\"2\"><em><br \/>\n<\/em><\/font><\/p>\n<p><font size=\"2\"><em><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><\/em><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flight Day 4 of STS-120 has seen the conclusion to the opening spacewalk of what will be five EVAs during the mission. Discovery astronauts Scott Parazynski (EV1) and Doug Wheelock (EV2) completed with the six hour 14 minute spacewalk. Friday has also seen the robotic ballet of removing the Node 2 \u201cHarmony\u201d module from Discovery\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41566","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41566"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41566"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41566\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}