{"id":41581,"date":"2007-10-09T18:43:46","date_gmt":"2007-10-09T10:43:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-reviewing-showstopper-for-sts-120-rcc-panels-in-question\/"},"modified":"2007-10-09T18:43:46","modified_gmt":"2007-10-09T10:43:46","slug":"nasa-reviewing-showstopper-for-sts-120-rcc-panels-in-question","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-reviewing-showstopper-for-sts-120-rcc-panels-in-question\/","title":{"rendered":"NASA reviewing showstopper for STS-120 \u2013 RCC panels in question"},"content":{"rendered":"<p>NASA Engineering and Safety Center (NESC) have officially recommended for three of Discovery\u2019s RCC (reinforced carbon-carbon) panels to be replaced, after they were found to have \u201cweakened SiC to carbon substrate adherence,\u201d or \u2018debonding\u2019 of the top layer.\n<\/p>\n<p>  NESC\u2019s recommendation is being reviewed by shuttle management, with a decision to be taken during the Flight Readiness Reviews (FRR). Replacement would lead to a rollback of the vehicle.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><em><font color=\"#ff0000\"><\/font><\/em><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"162\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=30174\" width=\"237\" align=\"left\" vspace=\"5\" border=\"0\/\">Extensive STS-120 Special Section on L2 now live,&nbsp;including Flight Plans, Handbooks, Manuals, documentation and presentations. STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/p>\n<p>STS-120 L2 Special includes 19 MOD Flight Readiness Review Presentations (see sample left)&nbsp;\u2013 the most expansive overview of the mission.&nbsp;<font color=\"#0000ff\">**Click&nbsp;here for sample**<\/font><br \/>L2 is the world\u2019s only \u2018as it happens\u2019 area on the net that gives you a seat next to the shuttle engineers and managers, in real time.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 PAD&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>The RCC panels in question are on both leading edges of Discovery\u2019s wings, namely panels 9R, 12L, and 13R. <\/p>\n<p>The root cause of the issue is not known, but it is understood to be related to oxidization within the panels that causes the decrease in the adhesive bond&nbsp;that holds the SiC layer in place. However, that has not been confirmed by the resulting scans of the panels.<\/p>\n<p>The issue is impossible to observe with the naked eye, and NASA have been using high tech analysis methods \u2013 such as Microscopy \u2013 to spot degradation in SiC Coating adherence. <\/p>\n<p>The concern relates to the potential inability of the current on orbit scanning process \u2013 via the OBSS (Orbiter Boom Sensor System) \u2013 of seeing increased problems with the top coating of the RCC panels. <\/p>\n<p>That becomes a problem due to notes of analytical data showing that a loss of this top coating holds a risk of burn through&nbsp;on all three panels in question, following a sustained period of heating. <\/p>\n<p>As a result, NESC are recommending that the shuttle program should replace panels 9R, 12L, and 13R, which can\u2019t be achieved at the pad due to accessibility issues. It is not clear if the process could be completed in the vertical. Either way, a rollback would delay STS-120 to December at the earliest. <\/p>\n<p>However, given the data appears to point to worst case scenarios, and that flight experience has seen such issues before, shuttle managers may decide that the risk is no greater than they\u2019ve previously flown with, allowing the launch to proceed on track. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**(NOW INCLUDES STS-118 Re-Entry Video) Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Now includes HALO II Re-entry video**<\/em><\/font><\/p>\n<p>This would appear to be good rationale, as NESC are noting that once the suspect panels have been removed, a variety of tests would be required to back up their claims, and even then the results may not provide conclusive data to justify a decrease in risk \u2013 by their own admission. <\/p>\n<p>Managers and engineers at the FRR will continue to pore over the data, and will likely come to a conclusion over the next 24 hours. <\/p>\n<p>That FRR process is more convoluted for this mission, with pre-FRRs and a large Shuttle FRR (taking place this week) ahead of another final top level FRR next week.<\/p>\n<p>Timelines for the FRRs show the Shuttle Program Flight Readiness Review on October 9th and 10th, the MMT (Mission Management Team) Prebriefing on October 12th, the Level 1 SOMD Flight Readiness Review on October 16th and L-2 Prelaunch MMT on October 21st.<\/p>\n<p><font face=\"Arial\" size=\"2\">Pad processing continues to proceed well, with only minor troubleshooting issues, which are commonplace for such flows. <\/font><\/p>\n<p>A few hours of contingency time remains, but that takes into account a cease&nbsp;to pad operations during the launch of the Atlas V carrying the Wideband Global SATCOM satellite&nbsp;Wednesday night.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018An Atlas V is currently scheduled for launch from Complex 41 on Wednesday October 10th with a targeted T-0 at 2022. The launch window extends from 2022 \u2013 2133. The launch vehicle is flying in the 421 configuration with a 12 foot fairing, two solid rocket boosters and a single engine Centaur upper stage. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018This configuration allows for a concern for Toxics in the LC 39 area. Pad A will be cleared at 1700 Wednesday and Pad B will remain open.\u2019<br \/><\/font><br \/><em><font color=\"#0000ff\">L2 members<\/font>: All documentation and quotes&nbsp;\u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><br \/><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA Engineering and Safety Center (NESC) have officially recommended for three of Discovery\u2019s RCC (reinforced carbon-carbon) panels to be replaced, after they were found to have \u201cweakened SiC to carbon substrate adherence,\u201d or \u2018debonding\u2019 of the top layer. NESC\u2019s recommendation is being reviewed by shuttle management, with a decision to be taken during the Flight [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41581","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41581"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41581"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41581\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}