{"id":41588,"date":"2007-10-02T01:41:10","date_gmt":"2007-10-01T17:41:10","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/saving-spaceship-orion-zero-base-vehicle-task-complete\/"},"modified":"2007-10-02T01:41:10","modified_gmt":"2007-10-01T17:41:10","slug":"saving-spaceship-orion-zero-base-vehicle-task-complete","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/saving-spaceship-orion-zero-base-vehicle-task-complete\/","title":{"rendered":"Saving spaceship Orion \u2013 Zero Base Vehicle task complete"},"content":{"rendered":"<p>NASA Constellation and Lockheed Martin engineers have completed the first stage of a realignment of the Orion spacecraft, a process to control mass issues relating to the Lunar capabilities of the vehicle \u2013 classed as the most significant issue engineers are currently working on.The process is being carried out on the Orion 607 \u2013 the latest version of the vehicle \u2013 which underwent a \u201cscrubbing\u201d of the vehicle to a minimum weight, ahead of the reapplication of some of the deleted capability.<br \/>\n&nbsp;&nbsp;<em><img fetchpriority=\"high\" decoding=\"async\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" border=\"0\" alt=\"\" hspace=\"5\" vspace=\"5\" width=\"600\" height=\"129\" align=\"left\"><\/em>&nbsp;<\/p>\n<p>&nbsp;&nbsp;&nbsp;<\/p>\n<p>&nbsp;&nbsp;&nbsp;<\/p>\n<p>&nbsp;&nbsp;&nbsp;<\/p>\n<\/p>\n<p><em><\/em><\/p>\n<p>Huge amounts of&nbsp;VSE related insider news and presentations \u2013 THE most comprehensive place to follow Ares\/Orion&nbsp;development \u2013&nbsp;are&nbsp;<em>available for download on L2<\/em><em>. <\/em><em>See list at the end of this article.<\/em><\/p>\n<p>All of this article is based on documented L2 information. For an overview of how L2 works, **click here for sample**<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em>**ARES I \/ ORION LIVE UPDATE PAGES**<\/em><\/p>\n<p><em>**ARES V \/ Mars Transport Vehicle (MTV) LIVE UPDATE PAGES**<\/em><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" border=\"0\" alt=\"\" hspace=\"5\" vspace=\"5\" width=\"125\" height=\"125\" align=\"left\">&nbsp;<\/p>\n<p>The most recent all-hands meeting noted progress in the overall integration effort, as Ares and Orion battle mass and scheduling issues, with \u2018teamwork and chemistry\u2019 stressed in the program-wide meeting as the way forward through the design efforts.&nbsp;<\/p>\n<p>\u2018Failure is an option during development,\u2019 Ares program leader Steve Cook said in one of the all hands presentations. \u2018We are willing to take calculated risks to further our knowledge.\u2019&nbsp;<\/p>\n<p>The current baseline shows an improvement on Ares 1 performance, changing from -30x100nmi to -11x100nmi. The insertion altitude has also changed from 55nmi to 70nmi.<\/p>\n<p>The ISS configuration for Ares I\/Orion is on relatively solid ground, while the Lunar configuration continues to be a concern, with only half of the launch margins of ISS Orion, which is continuing to slide in a negative direction. These concerns initiated the recent re-alignment of vehicle capabilities\/mass.<\/p>\n<p>Right now, Ares I could theoretically launch a Lunar Orion, but without a number of capabilities related to fault tolerance. The good news is that the J2-XD may achieve a higher ISP of between 452 and 458 sec, up from 448 sec.&nbsp;<\/p>\n<p>The Orion System Definition Review Board was recently completed, and the most significant issue was controlling spacecraft weight to match Ares I performance. The CEV project created a \u2018Zero Base Vehicle\u2019 to counter the problem.<\/p>\n<p>The goal of the ZBV is to pull out everything but the minimum capabilities to the single or zero fault tolerance level. The program is now returning certain mission capabilities to get back to a workable design. Working alongside this effort is an emergency-return capability, to survive critical systems failure, and a requirements levelling activity \u2013 used to re-define priorities.&nbsp;<\/p>\n<p>The most significant issue is controlling the spacecraft\u2019s weight, with notable principle factors relating to the total CEV mass limit due to performance of the Ares I launch vehicle, and the Crew Module landing limits on parachutes.<\/p>\n<p>\u2018The CEV Project initiated an effort to scrub the vehicle to a minimum weight, protecting for single fault tolerance for safety critical items, along with zero fault tolerance for mission critical systems.<\/p>\n<p>\u2018This effort identified the minimum vehicle capabilities necessary to accomplish a lunar sortie mission, and identified mass margins that could allow some additional vehicle functionality to eventually be added back into the design.<\/p>\n<p>\u2018This Zero Base Vehicle, as it is called, has been reviewed by the Constellation Program and has passed the review. MOD personnel have been actively participating in this activity, and have been instrumental in identifying \u2018buy-back\u2019 areas where additional capabilities need to be added back into the vehicle.<\/p>\n<p>\u2018The CEV Project is in the process of prioritizing buy-backs and are working to a mid-October completion date to have a new baseline vehicle that meets the mass targets,\u2019 noted Constellation Program\u2019s Bob Armstrong.<\/p>\n<p>\u2018In parallel with this effort are tasks to provide the crew a CEV Emergency Return Mode following a critical spacecraft system failure, including loss of the active cooling or computer control; and a CEV requirements levelling activity to ensure the existing requirements are allocated at the right level in the requirements and specifications structure.<\/p>\n<p>\u2018These activities will be folded in with the weight scrubbing activity and come to the CEV Project Control Board for approval of the new CEV 607 Point of Departure baseline on November 1. The Orion Design Analysis Cycle 2 (ODAC 2) will kick-off on November 15 and will provide critical analyses necessary for a successful PDR next year.\u2019<\/p>\n<p>Recent source information points to the Orion 607 being delayed until into November \u2013 when previously it was expected in mid-October \u2013 due to this vital ZBV activity.<\/p>\n<p>\u2018The CEV Project faces some very real challenges and difficult decisions will need to be made,\u2019 Armstrong added. \u2018As members of the CEV team, Mission Operations personnel are helping the CEV project management make informed decisions with respect to the impacts to future operations of the CEV.\u2019&nbsp;<\/p>\n<p>Under evaluation are more changes to the Orion 607 development cycle, with the option to replace the solid LAS (Launch Abort System) with a monopropellant liquid system or a hybrid liquid\/solid system.<\/p>\n<p>The new \u2018bullet cover\u2019 aerodynamic fairing makes room for a hydrazine tank under the fairing for use in a liquid LAS (see Constellation image sample at the top of the article showing mid design cycle Orion 607).<\/p>\n<p>NASA is also studying a possible option of retaining a mid-design cycle deletion of the airbag landing system in Orion 607, quadrupling the contract to find solutions to the mass issues associated with the system, classing the documented contract increase to \u2018avoid significant technical and programmatic impacts to the Orion project.\u2019&nbsp;<\/p>\n<p>In other news, KSC Constellation have decided that Orion will be serviced in the MPPF (Multi-Payload Processing Facility) and the LAS will be integrated in the VAB (Vehicle Assembly Building). There will be no hold down posts for Ares I, as gravity alone will keep the vehicle on the pad.<\/p>\n<p>Offline stacking of the first stage, a new concept to avoid the need for a second Ares I Mobile Launch Platform, is undergoing trade studies ahead of an expected approval.<\/p>\n<p>Also, the \u2018rollercoaster\u2019 Emergency Escape System has undergone a complete redesign, where the whole rail track structure will remain out at the pad complex and linked up with the LUT when the vehicle arrives (articles will follow \u2013 presentations on L2).<br \/>\n<em><\/em><em><br \/>\n<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=19781\" border=\"0\" alt=\"\" hspace=\"5\" vspace=\"5\" width=\"150\" height=\"267\" align=\"left\">Selection of L2 Resources For Ares I, V and Constellation:&nbsp;LSAM (LDAC-1) Video and Images. Several Constellation All Hands Videos and Presentations. Ares I Pad Rollercoaster (Old and New presentation and slides \u2013 \u2018CGI ride on the Ares pad coaster\u2019 video coming soon. Ares I VAB \u2018In-Line\u2019 Stacking presentation slides. Live updates on status of changes to Ares I first stage aft.<\/em>&nbsp;<\/p>\n<p><em><\/em><em>Presentation of Ares\/Orion impacts relating to Shuttle manifest acceleration. Ares I&nbsp;Interstage diagrams. Ares V Super Crawler. Ares I Launch Pad images (ML etc.) Hi Res images of Ares I-X Upper Stage. Orion 606-7 Data Updates. Updates Constellation launch schedule through to Orion 15. Orion Seat test photos. New ML Graphic and info. New Ares V graphic and baseline data. Large collection of hi res Orion paracute drop tests. SIX Part Series of Ares I Upper Stage&nbsp;Graphical&nbsp;Overviews.&nbsp;DAC-1C DDD Vast Slides on Vehicle Design. ATK First Stage Presentation. 39B Lightning Towers Slides. DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes).<\/em><\/p>\n<p>Orion\/CEV Display Layout Presentation (40 pages). ATK figures on the 5-Seg Booster weight for CLV. Weather Shield (Rain Shield) for Orion on the pad. New Super hi-res images of Ares I. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric \u2013 Feb 1. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation.<\/p>\n<p>Orion Launch Abort System (LAS) overview presentation. Major changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. Saturn Twang Test Video for use with Ares I-1R. CLV Umbilical Trade Matrix XLS.<\/p>\n<p>Vehicle interfaces for the DAC 1C version of Orion Ares \u2013 Jan 3. Ares I-1R Test Flight Plan (full outline) Presentation. Ares I-1 timeline and modification expanded info. Ares I troubleshooting latest. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. Latest Ares I and Ares V baseline Configuration image and data. CLV DAC-1C (Changes to CLV Upper Stage).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" border=\"0\" alt=\"\" hspace=\"5\" vspace=\"5\" width=\"180\" height=\"101\" align=\"left\">Ares I-1: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. Constellation news updates. ATK figures on the 5-Seg Booster weight for CLV.<br \/>\n&nbsp;<\/p>\n<p>90 Minute Video of Constellation all hands meeting. CLV TIM Meeting Information. CLV\/CaLV Infrastructure, Timelines and Information. Escape System Trade Study Presentation.<\/p>\n<p>CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Constellation SRR updates. CLV Stick \u2013 Troubleshooting\/Alternatives\/Updates. New CEV Images (include abort mode). Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.&nbsp;<\/p>\n<p><em><\/em><em><em><\/em><em><font face=\"Arial\"><\/font><\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA Constellation and Lockheed Martin engineers have completed the first stage of a realignment of the Orion spacecraft, a process to control mass issues relating to the Lunar capabilities of the vehicle \u2013 classed as the most significant issue engineers are currently working on.The process is being carried out on the Orion 607 \u2013 the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[640],"class_list":["post-41588","post","type-post","status-publish","format-standard","hentry","category-news","tag-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41588"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41588"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41588\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}