{"id":41589,"date":"2007-09-30T01:46:36","date_gmt":"2007-09-29T17:46:36","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/discovery-arrives-at-pad-sts-122-booster-stacking-begins\/"},"modified":"2007-09-30T01:46:36","modified_gmt":"2007-09-29T17:46:36","slug":"discovery-arrives-at-pad-sts-122-booster-stacking-begins","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/discovery-arrives-at-pad-sts-122-booster-stacking-begins\/","title":{"rendered":"Discovery arrives at pad \u2013 STS-122 booster stacking begins"},"content":{"rendered":"<p>The Discovery\/STS-120 stack has arrived at Launch Pad 39A, following a a six hour journey Sunday morning. Scheduled rollout was delayed overnight due to poor weather.\n<\/p>\n<p>  Meanwhile, in High Bay 3, STS-122\u2019s stack is starting to take shape, with the opening segments of Atlantis\u2019 left hand Solid Rocket Booster being built up on top of the Mobile Launch Platform.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><em><font color=\"#ff0000\"><\/font><\/em><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"162\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=30174\" width=\"237\" align=\"left\" vspace=\"5\" border=\"0\/\">Extensive STS-120 Special Section on L2 now live,&nbsp;including Flight Plans, Handbooks, Manuals, documentation and presentations. STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/p>\n<p>STS-120 L2 Special includes 19 MOD Flight Readiness Review Presentations (see sample left)&nbsp;\u2013 the most expansive overview of the mission.&nbsp;**Click list for sample**<br \/>L2 is the world\u2019s only \u2018as it happens\u2019 area on the net that gives you a seat next to the shuttle engineers and managers, in real time.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 ROLLOUT and PAD&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>Mating operations inside the Vehicle Assembly Building (VAB) proceeded smoothly over the past week, protecting the one day of contingency in the flow towards launch.<\/p>\n<p>Rollout weather was being monitored ahead of Discovery\u2019s three mile crawl to the pad. Call to stations for engineers inside the VAB has been set for 4pm local time on Saturday, with the transporter crawler set to make first movement out of the giant building four hours later. <\/p>\n<p>Weather proved to be the defining factor, delaying operations until the morning.&nbsp;The journey took around six hours to complete. <\/p>\n<p>Processing of Discovery and her mated External Tank and twin Solid Rocket Boosters proceeded well over the past week, with only a couple of hours lost \u2013 since caught up \u2013 and only one engineering constraint to rollout \u2013 subsequently alleviated. Some minor elements of processing will be switched to the pad flow. <\/p>\n<p>\u2018Working mate operations; everything going well though they are a couple of hours down,\u2019 noted the latest Stand-up Integration report at the end of the working week. \u2018LO2 side is complete, and LH2 side will be finished soon. Being a couple of hours down is not a concern; do have opportunities to make this up. <\/p>\n<p>\u2018Do have one constraint to rollout. Discovered that grease was not getting to ET IT access bearing. Showing this as a constraint until Engineering determines what needs to be done in this area (since removed as a constraint).\u2019<\/p>\n<p>Discovery\u2019s payload has already made the journey to the pad, and the transporter which carried the canister with the STS-120 cargo is now clear of the launch complex. <\/p>\n<p>\u2018Payload canister lift to the PCR\/payload installation in the PGHM were completed yesterday; team working to lower the canister to the transporter at this time,\u2019 added Friday processing information. <\/p>\n<p>\u2018Weekend Outlook: CTS (Call To Stations) for SSV Rollout to the Pad is scheduled for 1600 Saturday with first motion at 2000 hrs. Vehicle power up is scheduled for Sunday morning, and weather permitting, APU hotfire for Sunday afternoon.\u2019 <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**(NOW INCLUDES STS-118 Re-Entry Video) Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour.&nbsp;FIVE&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Plus the newly added HALO II Re-entry video**<\/em><\/font><\/p>\n<p>So long as rollout occurs over the weekend, Discovery\u2019s pad flow is protected for the opening of the launch window for STS-120 on October 23. At the same time, STS-122\u2019s processing remains on track for a December 6 launch date, with the start of booster stacking in High Bay 3 of the VAB, albeit a day late.<\/p>\n<p>\u2018Planned to start SRB stacking Wednesday, but weather did not cooperate. Weather looks better Thursday, so will begin stacking,\u2019 added processing information, followed by confirmation from ATK on Friday, \u2018LH aft booster mate to the MLP is complete. The LAC segment has been transferred to the VAB.\u2019<\/p>\n<p><font color=\"#ff0000\"><em>**Book your flight and\/or hotel for STS-120 and\/or STS-122\u2019s&nbsp;launch, call today 1-877-291-0068**<\/em><\/font><\/p>\n<p>Meanwhile, shuttle manager Wayne Hale has noted the challenge of proceeding with due diligence with both processing flows, asking the workforce to be prepared for a busy period.<\/p>\n<p>\u2018Have a busy fall schedule. Challenge for STS-120 is not only the usual challenge of having a safe and successful flight, but also the additional challenge of office work in order to prepare for STS-122,\u2019 noted Hale. \u2018Ask that everyone be prepared with their teams to support PRCBs (Program Requirements Control Board) and other reviews during STS-120. <\/p>\n<p>\u2018Goal is to have a nice Christmas vacation where we can celebrate three successful flights this year.\u2019<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><br \/><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Discovery\/STS-120 stack has arrived at Launch Pad 39A, following a a six hour journey Sunday morning. Scheduled rollout was delayed overnight due to poor weather. Meanwhile, in High Bay 3, STS-122\u2019s stack is starting to take shape, with the opening segments of Atlantis\u2019 left hand Solid Rocket Booster being built up on top of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41589","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41589"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41589"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41589\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}