{"id":41591,"date":"2007-09-26T18:17:12","date_gmt":"2007-09-26T10:17:12","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-120-on-track-for-weekend-rollout-sts-125-tank-change\/"},"modified":"2007-09-26T18:17:12","modified_gmt":"2007-09-26T10:17:12","slug":"sts-120-on-track-for-weekend-rollout-sts-125-tank-change","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-120-on-track-for-weekend-rollout-sts-125-tank-change\/","title":{"rendered":"STS-120 on track for weekend rollout \u2013 STS-125 tank change"},"content":{"rendered":"<p>The mating of Discovery with the STS-120 stack is proceeding on schedule inside the Vehicle Assembly Building (VAB), with rollout to Pad 39A targeted for Saturday or Sunday.\n<\/p>\n<p>  Meanwhile, a change to STS-125 \u2013 the mission to service the Hubble Space Telescope for a final time \u2013 has been approved, which sees a switch to the External Tank (ET) that will fly with Atlantis next Summer.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><em><font color=\"#ff0000\"><\/font><\/em><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"162\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=30174\" width=\"237\" align=\"left\" vspace=\"5\" border=\"0\/\">Extensive STS-120 Special Section on L2 now live,&nbsp;including Flight Plans, Handbooks, Manuals, documentation and presentations. STS-122&nbsp;to STS-127&nbsp;documentation already available.<\/p>\n<p>STS-120 L2 Special includes 19 MOD Flight Readiness Review Presentations (see sample left)&nbsp;\u2013 the most expansive overview of the mission.&nbsp;**Click list for sample**<br \/>L2 is the world\u2019s only \u2018as it happens\u2019 area on the net that gives you a seat next to the shuttle engineers and managers, in real time.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120&nbsp;VAB Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-123 Processing**<\/font><\/em><\/p>\n<p>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>Discovery remains right on track for her October 23 launch date, with a couple of minor issues failing to impact the schedule, which has only the one day of contingency remaining in its pre-launch flow. <\/p>\n<p>\u2018Vehicle is in VAB. Failed a brake test requirement Friday night due to insufficient pressure; raised pressure and passed. Pressurized struts Saturday morning and passed weight on wheels leak check on RH (Right Hand) landing gear strut that had seals replaced,\u2019 noted the latest Shuttle Stand-up\/Integration report. <\/p>\n<p>\u2018Had wire damage in wheel well and found tile damage around landing gear; repaired tile damage and vehicle is vertical. Recovered much of time lost on these problems. Doing VAB ops, and vehicle should roll Saturday or Sunday. <\/p>\n<p>\u2018Mr. (John) Shannon (deputy shuttle manager) said they (<font color=\"#0000ff\">USA and Goodrich engineers) did a tremendous job last week and on the weekend<\/font>; amazing they were able to recover time lost.\u2019 <\/p>\n<p>Another issue&nbsp;related to the minor problem of a loose card inside the MEC (Master Events Controller). <\/p>\n<p>\u2018Worked this weekend on EMEC S\/N 3 going to OV-103 for pad change out,\u2019 added the Stand-up. \u2018Had failure on ATP; indications are was test set failure during ATP. Are working with engineering on this to come to consensus that can rerun ATP. Still pressing for September 28 delivery of that box.<\/p>\n<p>\u2018Will discuss with OPO (Orbiter Project Office) the potential for AMEC cards to come up. Want to decide whether need to swap EMEC for unit on OV-103 (Discovery).\u2019 <\/p>\n<p>Several meetings are taking place over the coming days, as pre-Flight Readiness Reviews (FRR) pick up the pace ahead of the October flight. The schedule shows the STS-120 FRR due to take place on October 9, with the joint FRR scheduled for October 16. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available \u2013 Plus the newly added HALO II Re-entry video**<\/em><\/font><\/p>\n<p>Meanwhile, the decision has been made&nbsp;to&nbsp;the change the ET arrival schedule, leading to a tank swap on <font color=\"#0000ff\">STS-125<\/font>. This has seen Lockheed Martin change the delivery\/allocation of ET-127, which now flies in place of ET-129&nbsp;on the Hubble mission. <\/p>\n<p>\u2018ET-127 will complete before ET-129 and would support STS-125 (HST mission),\u2019 noted processing information. \u2018Tank processing configuration\/requirements similar\/same as ET-129. Verification\/Validation for LO2\/IT Flange TPS closeout delayed ET-129 processing.\u2019 <\/p>\n<p>\u2018Critical Path facility (Cell A) left open and available for tank processing. ET-127 previously spliced, aft interface installed and available for Cell A processing. Optimization for ET processing\/utilization of Cell A drove decision to process ET-127 ahead of ET-129. <\/p>\n<p>\u2018Re-sequence of ET-127 and ET-129 is necessary to meet delivery plan and integration requirements for USA\/KSC. ET-127 provides a tank with mature\/previously flown processes.\u2019 <\/p>\n<p>The decision was taken in the midst of an internal review of the ET manifest, which will see out the remaining flights of the shuttle, along with one spare tank after <font color=\"#3300ff\">STS-133<\/font>. <\/p>\n<p>While the tank deliveries have been caught up,&nbsp;since hurricane Katrina, the schedule remains challenging for the Michoud Assembly Facility (MAF) in New Orleans.<\/p>\n<p>\u2018Near term deliveries will be challenging due to high resource demands,\u2019 added the report. \u2018Additional demands on ET labor resource base must be mitigated. Overtime required to help overcome peak resource demand periods (15 -25 percent). <\/p>\n<p>\u2018Success oriented plan, no significant processing disruptions, nominal performance. Future ET schedule opportunity will be coordinated with USA\/KSC ET near term deliveries will continue to be challenging but obtainable.\u2019<\/p>\n<p>The plan earned praise from the shuttle management, which was also updated on the status of the next three tanks due to arrive at the Kennedy Space Center. <\/p>\n<p><font color=\"#ff0000\"><em>**Book your flight and\/or hotel for STS-120 and\/or STS-122\u2019s&nbsp;launch, call today 1-877-291-0068**<\/em><\/font><\/p>\n<p>\u2018Thanks to everyone at NASA, USA for cooperation to pull this together. Executing plan,\u2019 added the Stand-up, referencing the new ET manifest. \u2018ET-126 is in mod center. Have been doing many activities, including: early testing, work on longeron, \u2018spray day\u2019 last Saturday for six sprays. <\/p>\n<p>\u2018Continuing progress on ET-128. Completed all aft orbiter interface hardware build-up offline, and making preps to start moving that to tank. Doing much work on tank on ice\/frost ramp bases, installing intertank scaffolding. <\/p>\n<p>\u2018On ET-127, removing intertank scaffolding to move today out of final assembly into VAB, weather permitting. Want to move tank into Cell A today (Tuesday).\u2019<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><em><font face=\"Arial\" size=\"2\"><br \/><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The mating of Discovery with the STS-120 stack is proceeding on schedule inside the Vehicle Assembly Building (VAB), with rollout to Pad 39A targeted for Saturday or Sunday. Meanwhile, a change to STS-125 \u2013 the mission to service the Hubble Space Telescope for a final time \u2013 has been approved, which sees a switch to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41591","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41591"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41591"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41591\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}