{"id":41603,"date":"2007-09-12T23:22:03","date_gmt":"2007-09-12T15:22:03","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/preparing-for-the-shuttle-surge-all-three-orbiter-flows-on-track\/"},"modified":"2007-09-12T23:22:03","modified_gmt":"2007-09-12T15:22:03","slug":"preparing-for-the-shuttle-surge-all-three-orbiter-flows-on-track","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/preparing-for-the-shuttle-surge-all-three-orbiter-flows-on-track\/","title":{"rendered":"Preparing for the shuttle surge \u2013 all three orbiter flows on track"},"content":{"rendered":"<p>Three orbiters and three good processing flows, NASA is on track to carry out another three missions in the space of less than four months.\n<\/p>\n<p>  Those three assembly missions place the emphasis back on the international make-up of the space station, as Discovery, Atlantis and Endeavour carry major components into orbit for the US, Europe and Japan during STS-120, STS-122, and STS-123.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><em><font color=\"#ff0000\"><\/font><\/em><\/em><\/p>\n<p>Extensive STS-120 build up of documentation in action on L2 \u2013 **STS-120 Special Section&nbsp;on L2 to begin this weekend**,&nbsp;including Flight Plans, Handbooks, Manuals, documentation and presentations. STS-122 and STS-123 documentation already available.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 Post Flight and STS-123 Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p><em><u>STS-120\/Discovery status<\/u><\/em><\/p>\n<p>Discovery\u2019s flow remains on track for rollover from OPF-3 (Orbiter Processing Facility) on September 19, ready to be lifted over to High Bay 1 for mating with her External Tank (ET-120) and twin Solid Rocket Boosters (SRBs).<\/p>\n<p>That date is still to be confirmed ahead of the rollout review on Friday, but is likely to be passed, allowing the STS-120 stack to rollout on September 27, for a pad flow tracking an October 23 launch date.<\/p>\n<p>\u2018Vehicle in OPF; have plenty of schedule time for remaining work. Wrapping up ingress\/egress limit switch rigging, with functional completed. Plan to open payload bay doors, install PSA, close doors by Wednesday, do weight and C.G. (Center of Gravity) by Thursday, OTS (Orbiter Transporter System) on Friday, and be able to roll September 19,\u2019 noted the latest Shuttle Stand-up\/Integration report on L2. <\/p>\n<p>\u2018Should wrap up stress analysis done on bonding of OV-103 OMS (Orbital Maneuvering System) pod blankets this week before roll. This is not a constraint to launch, because could cut blankets at pad. Everything looks positive except for one tile (have a bit more work to do on that tile).<\/p>\n<p>\u2018ET processing in VAB (Vehicle Assembly Building) going well and on schedule; able to support rollover and mate ops next week. STS-120 has very green schedule overall.\u2019<\/p>\n<p>The mission, commanded by Pam Melroy, continues to be fine tuned, with an addition of a fifth EVA, additional middeck payloads being added to the baseline, including what is known as the Starboard Tool Stowage Assembly (TSA), for a test of the <font color=\"#0000ff\">T-Rad on orbit repair capability<\/font>, along with the addition of spare sets of EMU gloves \u2013 related to the recent incidents of cut gloves during spacewalks. (All presentations, with images, diagrams and new timelines available on L2).<\/p>\n<p>Preparations for the mission \u2013 from a paperwork standpoint \u2013 are also picking up the pace, with the Mission Operations Directive (MOD) Flight Readiness Review (FRR) set for next Monday.<\/p>\n<p><em><u>STS-122\/Atlantis status<\/u><\/em><\/p>\n<p>Meanwhile, Atlantis\u2019 STS-122 mission \u2013 delivering the European built Columbus module to the station, and carrying out an ISS crew rotation \u2013 has a key hardware element en route to the Kennedy Space Center (KSC), the shipping of External Tank ET-125. <\/p>\n<p>The tank \u2013 which was delayed slightly by last minute work during final inspections \u2013 finally left the Michoud Assembly Facility (MAF) on Monday, and will arrive at KSC at the end of the week. <\/p>\n<p>\u2018ET-125 on the way,\u2019 noted processing information. \u2018Should arrive at KSC at 07:00 Friday; should be at turn basin that afternoon. Will accept ET-125 at end of this week, and work through weekend to get into test cell.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/em><\/font><\/p>\n<p>Atlantis herself is starting to take shape for the December 6 or 7 launch date target, with the main focus of attention currently related to the installation of her left OMS Pod \u2013 set for Friday, and checks on Atlantis\u2019 COPVs (Composite Overwrap Pressure Vessels). <\/p>\n<p><font color=\"#0000ff\">The COPVs \u2013 especially on Atlantis \u2013 have been a focus of attention since STS-117<\/font>, when it was found that some of the tanks were starting to show signs of aging. Engineers decided to replace a couple of the COPVs during Atlantis\u2019 processing flow as a pre-caution, although they will undergo further testing to see if one can be used as a spare. <\/p>\n<p>\u2018Reliabilities flight by flight for each vehicle through end of Program came out with three nines, with fly as is recommendation,\u2019 confirmed notes from last week\u2019s Orbiter Project Office meeting. \u2018Will do health checks on tanks removed from OV-104 (Atlantis) to characterize fleet tanks and help decide which of the two tanks to use if ever need a spare.<\/p>\n<p>\u2018Will try to use spectrographic technique to determine strain in overwrap fibers on three tanks having higher risk \u2013 and confirm whether volume growth is not as high as originally reported on those tanks.\u2019<\/p>\n<p>To protect STS-122\u2019s short launch window, <font color=\"#0000ff\">NASA drew up a plan to start stacking the SRBs in High Bay 3<\/font>, before Discovery (STS-120) rolls out of High Bay 1. Currently, STS-122\u2019s milestones point towards SRB stacking to begin around September 23rd. ET-125 is due to be mated around October 17, Atlantis will rollover from OPF-1 for mating November 7, for rollout to Pad 39A a week later.<\/p>\n<p>\u2018In VAB High Bay 3, tracking six or seven areas, each on or ahead of schedule,\u2019 added processing information. \u2018Looks good for having Mobile Launch Platform (MLP) ready for the stacking of the boosters on September 22 or 23; fairly aggressive schedule for next 12 days.\u2019<\/p>\n<p><em><u>STS-123\/Endeavour status<\/u><\/em><\/p>\n<p>Endeavour, not long since she arrived back in OPF-2 after STS-118, is being <font color=\"#0000ff\">prepared for STS-123 \u2013 currently targeted for February 14, 2008<\/font>. STS-123 will deliver the first module of the Japanese laboratory, Kibo, on behalf of JAXA, along with the Canadian Dextre robotics system to the ISS. <\/p>\n<p>\u2018OPF flow going well; about 85 percent complete on TPS (Thermal Protection System) inspection. Working this week to remove engines and do OMS pod functionals. Over last five days, completed WLE (Wing Leading Edge) thermography, completing all thermography on vehicle. Will do work to replace chin panel.\u2019<\/p>\n<p>SSME (Space Shuttle Main Engine) removal has begun after it was delayed from the originally scheduled timeline due to problems with the Hyster \u2013 a fork lift type machine that is used to remove and install the engines.<\/p>\n<p>\u2018While running pre-operational checks on Hyster Thursday morning, getting ready to remove it from OV-105 (Endeavour), ran into interference problem with mast and a cattle guard (human safety item made of two inch aluminum tubing), causing some damage. Fixed damage, and are trying to completely understand this to make sure it is safe.\u2019<\/p>\n<p>Endeavour\u2019s schedule milestones currently point to SRB stacking to begin on November 15, ET-126 mate December 11, Endeavour to rollover for mating around January 7, for rollout to Pad 39A on January 14 \u2013 a month prior to launch.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**&nbsp;\u2013 STS-118 Mission review video also available.<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<br \/><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Three orbiters and three good processing flows, NASA is on track to carry out another three missions in the space of less than four months. Those three assembly missions place the emphasis back on the international make-up of the space station, as Discovery, Atlantis and Endeavour carry major components into orbit for the US, Europe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41603","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41603"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41603"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41603\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}