{"id":41606,"date":"2007-09-08T00:30:26","date_gmt":"2007-09-07T16:30:26","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-122-atlantis-mission-timeline-protected-in-new-plan\/"},"modified":"2007-09-08T00:30:26","modified_gmt":"2007-09-07T16:30:26","slug":"sts-122-atlantis-mission-timeline-protected-in-new-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-122-atlantis-mission-timeline-protected-in-new-plan\/","title":{"rendered":"STS-122: Atlantis mission timeline protected in new plan"},"content":{"rendered":"<p>While ET-120 mating operations are continuing for STS-120 inside the Vehicle Assembly Building (VAB), shuttle managers have drawn up a plan to start processing of the next mission \u2013 STS-122 \u2013 in tandem, via a High Bay (HB) utilization plan.\n<\/p>\n<p>  With the STS-120 stack occupying High Bay 1 until the end of the month, engineers will use High Bay 3 \u2013 despite it currently undergoing door repairs \u2013 to build up the STS-122 stack.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentations and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><em><font color=\"#ff0000\"><\/font><\/em><\/em><\/p>\n<p>STS-120 build up of documentation in action on L2 \u2013 including major baseline presentations on orbiter and ET-120. Presentations and memos on the ET-120 repair status also available.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 Post Flight and STS-123 Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/p>\n<p>Only a matter of days separate the rollout of STS-120 to Pad 39A, before the requirement of starting the STS-122 build-up, but the shuttle program want to protect the STS-122 launch window \u2013 which opens early December \u2013 due to it being only a week long. <\/p>\n<p>\u2018To support December 6 launch date, working VAB HB 1 and HB 3 in parallel,\u2019 noted the latest Shuttle Stand-up\/Integration report. \u2018Focusing on finishing HB 3, tracking 22 day schedule. <\/p>\n<p>\u2018Critical path includes completion of door validations and securing the VLE, so all tools\/equipment are out of the way. If all goes well, will be ready to roll MLP (Mobile Launch Platform) in September 23.\u2019<\/p>\n<p>Planning for this eventuality has been on-going for about a month, with plans to build up parts of the boosters in a separate High Bay, before rolling over to High Bay 1 for the continuation of the processing.<\/p>\n<p>One vital element of STS-122 is the External Tank, ET-125, which was due to ship out of the Michoud Assembly Facility (MAF) on Thursday, but this was delayed by a small amount of extra work which was spotted during final shakedown in New Orleans. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Verdana\" color=\"#0000ff\"><em>**Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure \u2013 through re-entry with a&nbsp;astronaut held camcorder video \u2013&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/em><\/font><\/p>\n<p>\u2018Hoped to have ET-125 on its way Thursday, but after reviewing open work, keeping it at MAF to complete some activity,\u2019 added ET processing information.<\/p>\n<p>\u2018Had multiple R&amp;R (remove and replace) efforts that had to be performed at +Y longeron area on aft end of vehicle, which held up many closeout and trim operations of hardware surrounding this location. Working through final sanding and trimming operations and work at LO2 feedline bracket area.<\/p>\n<p>\u2018Determined with KSC it\u2019s best to complete this activity at MAF. Plan to complete this Friday, allowing for loading of tank on barge. Lockheed Martin will give updates of where they stand this afternoon with parties involved. Not working any issues other than last required, sanding and machining operations.\u2019<\/p>\n<p>Atlantis\u2019 STS-122 is will mark the 24th shuttle mission to the International Space Station (ISS) \u2013 delivering the European built Columbus module to the station, and carrying out a crew rotation, returning Expedition 16 Flight Engineer Daniel Tani to earth, after his short stay since arriving on October\u2019s STS-120. Replacing Tani will be ESA\u2019s Leopold Eyharts. <\/p>\n<p>STS-120\u2019s launch processing is proceeding on track, with some minor issues being worked. Discovery still on track to rollover to the VAB on September 19. Once there, she will be greeted by ET-120 and the twin Solid Rocket Boosters (SRBs) \u2013 which were mated on Thursday. STS-120 tracking an October 23 launch date.<\/p>\n<p>\u2018Are completing problems\/issues that they\u2019ve been working. APU (Auxiliary Power Unit) contamination work will be deferred. Concluded that potential for water re-servicing is acceptable according to samples taken,\u2019 noted processing information. \u2018Any re-servicing would be deferred to next flow. <\/p>\n<p>\u2018Ingress\/egress hatch limit switch rigging \u2013 final checks will be completed in next few days. Opening payload bay doors for this and would close doors by September 12, putting them in position to rollover on September 19.\u2019<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<br \/><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While ET-120 mating operations are continuing for STS-120 inside the Vehicle Assembly Building (VAB), shuttle managers have drawn up a plan to start processing of the next mission \u2013 STS-122 \u2013 in tandem, via a High Bay (HB) utilization plan. With the STS-120 stack occupying High Bay 1 until the end of the month, engineers [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41606","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41606"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41606"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41606\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}