{"id":41646,"date":"2007-08-02T01:37:56","date_gmt":"2007-08-01T17:37:56","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-to-donate-valve-for-endeavour-troubleshoot\/"},"modified":"2007-08-02T01:37:56","modified_gmt":"2007-08-01T17:37:56","slug":"atlantis-to-donate-valve-for-endeavour-troubleshoot","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-to-donate-valve-for-endeavour-troubleshoot\/","title":{"rendered":"Atlantis to donate valve for Endeavour troubleshoot"},"content":{"rendered":"<p>A replacement valve will be taken from Atlantis, after the United Space Alliance finalized a decision that will RandR (Remove and Replace) the cabin relief valve at the center of the failed leak tests on Endeavour.\n<\/p>\n<p>  The culprit, a Positive Pressure cabin Relief Valve B (PPRV B) \u2013 one of two valves \u2013 will be replaced overnight, in a process that at present will not affect the move to the launch countdown of STS-118, although the timeline is now very tight.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section.<\/font><\/em><\/p>\n<p>Special STS-118 L2 Section now live, with all the&nbsp;MOD Flight Readiness Review presentations (x16), a newly updated Flight Plan and handbooks, along with a large amount of mission documentation. STS-120 documentation build-up already begun.<em><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 PAD FLOW**<\/font><\/em>&nbsp;(Including links to all NASA Video \u2013 press conferences and mission milestones \u2013 for free).<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>Testing of the cabin relief valves were completed this morning \u2013 via leak checks \u2013 which isolated the origin of the leak is PPRV B, after PPRV A passed. Its location is behind the Waste Collection System (WCS).<\/p>\n<p>The results from the leak checks will be discussed at the OPO (Orbiter Project Office) meeting at noon today, with evaluations to consider whether the valve will require replacing. The R&amp;R plan was approved, with NASA now meeting to give the approve the plan.<\/p>\n<p>If replacement is the forward&nbsp;plan, the valve will be removed from Atlantis, to be replaced in Endeavour. Engineers do have other spare valves, which will ensure there is no impact to Atlantis\u2019&nbsp;processing timeline.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**UPDATED: Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<p>\u2018With the positive pressure cabin relief&nbsp;valve B enabled and valve A closed, the leakage rate was 0.06 psi\/hr,\u2019 noted information acquired via live updates on L2.<\/p>\n<p>&nbsp;<br \/>\n\u2018The Problem Resolution Team (PRT) recommends change out of the valve using Atlantis&nbsp;to cannibalize the part. This will be going to the Noon board for approval.<br \/>\n&nbsp;<br \/>\n\u2018If the OK is given to R&amp;R (Remove and Replace)&nbsp;the valve, access is needed behind the WMC panel and the anticipated duration is&nbsp;eight hours to perform the R&amp;R.<br \/>\n&nbsp;<br \/>\n\u2018After the R&amp;R, time has to be found in the schedule to perform&nbsp;two cabin leak checks with the vehicle powered down.\u2019<\/p>\n<p>Memos flying around the Kennedy Space Center this morning did point towards an on time call to stations for the August 7 launch attempt. This is still under review.<\/p>\n<p>The forward plan is to remove the valve from Atlantis this evening and R&amp;R in Endeavour overnight.<\/p>\n<p>Leak checks will be conducted on Friday and Saturday morning, ahead of the start of S0007 (launch countdown) on Saturday evening.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A replacement valve will be taken from Atlantis, after the United Space Alliance finalized a decision that will RandR (Remove and Replace) the cabin relief valve at the center of the failed leak tests on Endeavour. The culprit, a Positive Pressure cabin Relief Valve B (PPRV B) \u2013 one of two valves \u2013 will be [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41646","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41646"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41646"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41646\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}