{"id":41648,"date":"2007-07-29T17:26:57","date_gmt":"2007-07-29T09:26:57","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/engineers-troubleshooting-leak-in-endeavours-crew-cabin\/"},"modified":"2007-07-29T17:26:57","modified_gmt":"2007-07-29T09:26:57","slug":"engineers-troubleshooting-leak-in-endeavours-crew-cabin","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/engineers-troubleshooting-leak-in-endeavours-crew-cabin\/","title":{"rendered":"Engineers troubleshooting leak in Endeavour\u2019s crew cabin"},"content":{"rendered":"<p>The first real problem with Endeavour \u2013 during pad processing for STS-118 \u2013 is being worked by engineers at 39A, after a leak was observed in the orbiter\u2019s crew cabin.\n<\/p>\n<p>  The leak, observed at more than 10 times greater than the allowable rate of pressure decay, was first spotted on Saturday, and elevated as a problem during Sunday.\n<\/p>\n<p>  UPDATE: Leak Issue Resolved! See latest article on site.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section.<\/font><\/em><\/p>\n<p>Special STS-118 L2 Section now live, with all the&nbsp;MOD Flight Readiness Review presentations (x16), a newly updated Flight Plan and handbooks, along with a large amount of mission documentation. STS-120 documentation build-up already begun.<\/p>\n<p><font color=\"#0000ff\"><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 PAD FLOW**<\/em><\/font><em>&nbsp;(Including links to all NASA Video \u2013 press conferences and mission milestones \u2013 for free).<\/em><\/p>\n<p>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font color=\"#0000ff\"><em>**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/em><\/font><\/p>\n<p><font color=\"#0000ff\"><em>**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/em><\/font><\/p>\n<p><font color=\"#ff0000\"><em>**ISSUE RESOLVED \u2013 CLICK HERE FOR LATEST ARTICLE**<\/em><\/font><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>According to information and memos acquired by the L2 section of NASASpaceflight.com, the leak was observed by ECL\/ECLSS (Environmental Control &amp; Life Support Systems) engineers&nbsp;during the Crew Module with Spacehab Leak Test \u2013 part of the scheduled pad flow ahead of Endeavour\u2019s targeted opening launch attempt on August 7.<\/p>\n<p>Engineers noticed a decay in the crew cabin\u2019s pressure at a rate of 0.06 psi (pounds per square inch) over a one hour period. The maximum allowable rate is 0.022 psi over a four hour period. This led to the issue being raised to an IPR (Interim Problem Report).<\/p>\n<p>Troubleshooting was immediate, as engineers checked the Ground Support Equipment (GSE) \u2013 which has suffered a number of leaks during the pad flow \u2013 along with the opening of the side hatch and the venting of the vehicle.<\/p>\n<p>Following the evaluation of related systems, the hatch on the orbiter was closed and the cabin re-pressurized. Unfortunately, the decay in pressure remained at a rate of 0.06 psi.<\/p>\n<p>As part of the process to locate the area of the leak, engineers carried out the process of venting the vehicle again, before re-pressurizing only the crew cabin, only to find that the decay rate had increased to nearly 0.089 psi per hour. The crew cabin was once again&nbsp;vented for continued troubleshooting.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**UPDATED: Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<\/p>\n<p>Engineers on Sunday reviewed forward plans for the troubleshooting effort, as pad processing continued in tandem with the lowering of the APU (Auxiliary Power Unit) carts from the 135ft level of the launch complex \u2013 which requires the removal of all non-essential workers from the pad. <\/p>\n<p>At present, engineers are unsure as to why the orbiter\u2019s cabin is leaking, following a successful leak check on the orbiter whilst she was inside her OPF (Orbiter Processing Facility). That test was conducted on May 15. <\/p>\n<p>After the APU carts were lowered and moved to Launch Pad 39B, engineers returned to the orbiter to work on isolating the location of the leak, placing tape over various valves and locations related to the crew cabin.<\/p>\n<p>Endeavour has once again been powered up, as she awaits another leak check once her hatch has been closed. This time engineers will utilize an ultrasonic leak detector to aid their efforts to find the source of the leak. <\/p>\n<p>\u2018If the leak still exists, we should take the option to power up, go to remote, and clear the crew cabin, close the I\/E hatch and perform a cabin leak check removing the probe, installing the cap, and performing the leak check using the cabin press xdcr,\u2019 noted an Environmental Control engineering memo. <\/p>\n<p>\u2018Given the latest leak rate we saw (0.0886 psi\/hr) we will need to use cabin press (0.08 psi\/bit), and monitor for 4 hours.\u2019<\/p>\n<p>Efforts to isolate the leak will continue after this process.<\/p>\n<p>Meanwhile, an important milestone for STS-118\u2019s LON (Launch On Need) was achieved on Sunday, following the arrival of ET-120 at the Kennedy Space Center. <\/p>\n<p>The tank is required to fly with Discovery as a rescue mission, should Endeavour suffer a serious problem on orbit. Discovery\u2019s primary mission \u2013 STS-120 \u2013 is due to launch in October.<\/p>\n<p><font color=\"#810081\">The Pegasus barge containing ET-120<\/font> left the Michoud Assembly Facility (MAF) in New Orleans early last week. The tank is due to be transferred to the Vehicle Assembly Building (VAB), first shift Monday.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first real problem with Endeavour \u2013 during pad processing for STS-118 \u2013 is being worked by engineers at 39A, after a leak was observed in the orbiter\u2019s crew cabin. The leak, observed at more than 10 times greater than the allowable rate of pressure decay, was first spotted on Saturday, and elevated as a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41648","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41648"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41648"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41648\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}