{"id":41649,"date":"2007-07-27T18:52:02","date_gmt":"2007-07-27T10:52:02","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-selects-local-firm-to-construct-kscs-ares-i-lightning-towers\/"},"modified":"2007-07-27T18:52:02","modified_gmt":"2007-07-27T10:52:02","slug":"nasa-selects-local-firm-to-construct-kscs-ares-i-lightning-towers","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-selects-local-firm-to-construct-kscs-ares-i-lightning-towers\/","title":{"rendered":"NASA selects local firm to construct KSC\u2019s Ares I Lightning Towers"},"content":{"rendered":"<p>Ivey Construction of Merritt Island, Florida, have won a $28m contract to build the three 600 ft high Lightning Towers that will surround Launch Pad 39B at the Kennedy Space Center.\n<\/p>\n<p>  The three towers will take several years to construct, and will start rising out of the ground before the pad receives its final shuttle \u2013 Endeavour\u2019s STS-400, for LON (Launch On Need) support of Atlantis\u2019 Hubble Servicing Mission \u2013 in 2008, with completion set for March, 2010.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"250\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=14333\" width=\"270\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><em><font face=\"Arial\" size=\"2\">Huge amounts of&nbsp;VSE related insider news and presentations \u2013 THE most comprehensive place to follow Ares\/Orion&nbsp;development \u2013&nbsp;are&nbsp;<\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>available for download on L2<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>. <br \/>See list at the end of this article.<\/em><\/font><\/p>\n<p><font size=\"2\"><br \/>\n<\/font><\/p>\n<p><font size=\"2\"><\/font><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**ARES I \/ ORION LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><font color=\"#0000ff\">**ARES V \/ Mars Transport Vehicle (MTV) LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">&nbsp;<br \/><font color=\"#0000ff\">**CLICK HERE for a NASA.gov animation of the Towers&nbsp;during a lightning strike**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>The lightning protection system is designed to reduce the probability of a direct lightning strike to the Ares I and Ares V vehicles&nbsp;and associated launch equipment during processing and other activities prior to flight.<\/p>\n<p>Under the contract, the company will provide all labor and materials to fabricate and construct three 600-foot, self-supporting structural steel towers and an overhead wire system with associated conductors.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"147\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=18899\" width=\"224\" align=\"left\" vspace=\"5\" border=\"0\/\">Documentation acquired by this site (available on L2)&nbsp;show a huge amount of work has already been undertaken on producing blueprints and guidelines for contractors to use for fabricating these huge structures that will surround the complex. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>Those blueprints are complete, to the finest detail, as Constellation move towards the actual fabrication of the steel work.<\/p>\n<p>Construction of these towers is expected to start this year, rising out of the ground as huge pylons, with five levels for worker access \u2013 the highest being Level E at 482ft \u2013 rising yet further to a total height of 594ft. <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Access to the five levels can be reached by stairs or via the \u2018man lift\u2019 that travels up the side of the tower. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Along with the towers \u2013 which it has been proposed will be named after Apollo 1, Challenger and Columbia \u2013 will be nine large downconducters, placed around the complex, which will be anchor points for the massive cables that will stretch across the lightning towers. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Foundation work will be the first element of construction to begin, leading to 12 areas of the complex that will undergo major engineering work.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">This work is not specifically required ahead of the 2009 test flight of <\/font><font face=\"Arial\" size=\"2\">Ares 1-X (1-X being the new name for the Ares I-1 fligh<\/font><font face=\"Arial\" size=\"2\">t. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>The second test flight is now renamed to Ares 2 from Ares I-Y.). For the test flight, NASA will simply add a longer lightning mast on top of 39B to protect the test vehicle.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">For shuttle, one final role remains for Pad 39B, hosting Endeavour, while Atlantis launches to&nbsp;carry out the final servicing mission to the Hubble Space&nbsp;Telescope (STS-125).&nbsp;<\/font><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The rescue mission is different to any of the other LON flights, due to Atlantis\u2019 trip into space being the only flight on the remaining shuttle manifest not to have the \u2018safe haven\u2019 of the International Space Station (ISS). Even in \u2018lifeboat\u2019 mode, a rescue orbiter has to reach the stricken craft within a few weeks, meaning the launch would also require accelerating in the flow. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"174\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/two.jpg\" width=\"149\" align=\"left\" vspace=\"5\" border=\"0\/\">While a \u2018P-t-P\u2019 (Pad to Pad) option was available, the turnaround was too tight to be viable, leading to NASA deciding to hold back the full handover date of Pad 39B to Constellation until after the stand-down was giving during STS-125. Previously, Constellation were set to get their hands on 39B on April 1 of this year. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">As outlined in the March 2007 presentation (available on L2), the plan is for the LON orbiter (Endeavour) to rollover to High Bay 3 and then out to Pad 39B first.&nbsp;Endeavour would sit on the pad while Atlantis was stacked in the opposite High Bay, for rollout two weeks after Endeavour. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>After the stand-down of the LON requirement was giving during STS-125,&nbsp;Endeavour would then be transported from Pad B to Pad A and prepared for her primary mission, STS-126.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Pad 39B will not be used for payload integration, given Endeavour\u2019s supporting rescue roll would not require any payload for the emergency launch, which allows the pad to undergo a level of Constellation related modifications, so long as they do not interfere with the launch aspects required for Endeavour to launch a rescue mission.<\/font><br \/><em><i><br \/><font face=\"Arial\"><\/font><font size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"267\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=19781\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\/\">Selection of L2 Resources For Ares I, V and Constellation: Ares V Super Crawler. Ares I Launch Pad images (ML etc.) Hi Res images of Ares I-X Upper Stage. Orion 606 Data Updates. Updates Constellation launch schedule through to Orion 15. Orion Seat test photos. New ML Graphic and info. New Ares V graphic and baseline data. Large collection of hi res Orion paracute drop tests. SIX Part Series of Ares I Upper Stage&nbsp;Graphical&nbsp;Overviews.&nbsp;DAC-1C DDD Vast Slides on Vehicle Design. ATK First Stage Presentation. 39B Lightning Towers Slides. DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes). <\/font><\/i><\/em><\/p>\n<p><em><i><font size=\"2\"><\/p>\n<p>Orion\/CEV Display Layout Presentation (40 pages). ATK figures on the 5-Seg Booster weight for CLV. Weather Shield (Rain Shield) for Orion on the pad. New Super hi-res images of Ares I. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric \u2013 Feb 1. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation. <\/p>\n<p><font face=\"Arial\" size=\"2\">Orion Launch Abort System (LAS) overview presentation. Major changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. Saturn Twang Test Video for use with Ares I-1R. CLV Umbilical Trade Matrix XLS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Vehicle interfaces for the DAC 1C version of Orion Ares \u2013 Jan 3. Ares I-1R Test Flight Plan (full outline) Presentation. Ares I-1 timeline and modification expanded info. Ares I troubleshooting latest. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. Latest Ares I and Ares V baseline Configuration image and data. CLV DAC-1C (Changes to CLV Upper Stage). <\/p>\n<p><\/font><\/font><\/i><\/em><\/p>\n<p><em><i><font size=\"2\"><font face=\"Arial\" size=\"2\">Ares I-1: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. Constellation news updates. ATK figures on the 5-Seg Booster weight for CLV. <br \/><\/font><\/font><\/i><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"101\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" width=\"180\" align=\"left\" vspace=\"5\" border=\"0\/\">90 Minute Video of Constellation all hands meeting. CLV TIM Meeting Information. CLV\/CaLV Infrastructure, Timelines and Information. Escape System Trade Study Presentation.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Constellation SRR updates. CLV Stick \u2013 Troubleshooting\/Alternatives\/Updates. New CEV Images (include abort mode). Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.<\/font><em><br \/><\/em><em><br \/><\/em><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><font face=\"Arial\" size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><br \/>\n<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><\/em><\/font><font face=\"Arial\" size=\"2\"><em><\/em><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ivey Construction of Merritt Island, Florida, have won a $28m contract to build the three 600 ft high Lightning Towers that will surround Launch Pad 39B at the Kennedy Space Center. The three towers will take several years to construct, and will start rising out of the ground before the pad receives its final shuttle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41649","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41649"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41649"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41649\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}