{"id":41650,"date":"2007-07-26T22:05:11","date_gmt":"2007-07-26T14:05:11","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-clear-endeavour-for-august-7-launch\/"},"modified":"2007-07-26T22:05:11","modified_gmt":"2007-07-26T14:05:11","slug":"nasa-clear-endeavour-for-august-7-launch","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-clear-endeavour-for-august-7-launch\/","title":{"rendered":"NASA clear Endeavour for August 7 launch"},"content":{"rendered":"<p>NASA managers have concluded their Flight Readiness Review (FRR) by approving the August 7 launch date for shuttle Endeavour on STS-118.\n<\/p>\n<p>  The meeting deferred a couple of items to the L-10 Day Bench Review \u2013 primarily Launch On Need (LON) ability \u2013 with another review at the L-2 Day MMT (Mission Management Team) meeting, ahead of the opening of the launch window.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section.<\/font><\/em><\/p>\n<p>Special STS-118 L2 Section now live, with all the&nbsp;MOD Flight Readiness Review presentations (x16), a newly updated Flight Plan and handbooks, along with a large amount of mission documentation. STS-120 documentation build-up already begun.<em><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 PAD FLOW**<\/font><\/em>&nbsp;(Including links to all NASA Video \u2013 press conferences and mission milestones \u2013 for free).<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>In a surreal post-FRR press briefing \u2013 mainly due to revelations that will be the likely source of mass media headlines in the lead up to launch \u2013 the confirmation that Endeavour had been giving a go for launch was overshadowed&nbsp;by the subsequent questions from the media. <\/p>\n<p>However, with a week and a half before launch, Endeavour\u2019s first flight in near five years is scheduled to launch on time \u2013 in a window that opens on August&nbsp;7 \u2013 with a seven strong crew commanded by Scott Kelly. <\/p>\n<p>A few issues were deferred to later milestone meetings, as is usual pre-launch, most notably with the rescue requirement of LON, via Discovery. <\/p>\n<p>Her tank, ET-120, may still require some work to a couple of LO2 liquid level sensors, with the work schedule required to be inside of CSCS (Crew Shuttle Contingency Support) timelines. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**UPDATED: Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<p>Determining CSCS\/LON timelines, based on the level of Discovery\u2019s processing and hardware \u2013 with the tank currently in the latter stages of its journey from the Michoud Assembly Facility (MAF) to the Kennedy Space Center (KSC) \u2013 was pre-empted in pre-FRR information. <\/p>\n<p>That information noted that even if Discovery fails to reach processing milestones in time, NASA do have a back-up plan via the Russian Soyuz.<\/p>\n<p>\u2018Having L-10 Bench Review Friday. (Evaluations) to see how much time can squeeze out of standard CSCS, considering use of Soyuz for crew return, that the oxygen generation system (OGS) is functional and other non-standard assumptions.\u2019<\/p>\n<p>All other items at the FRR appear to have received clearance for flight, with the following milestone meetings to clear up any outstanding issues.<\/p>\n<p>Meanwhile, on the pad, Endeavour and the STS-118 stack have completed hypergolic fuel loading, with the final element \u2013 the fueling of the APU (Auxiliary Power Units), completed this morning.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have concluded their Flight Readiness Review (FRR) by approving the August 7 launch date for shuttle Endeavour on STS-118. The meeting deferred a couple of items to the L-10 Day Bench Review \u2013 primarily Launch On Need (LON) ability \u2013 with another review at the L-2 Day MMT (Mission Management Team) meeting, ahead [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41650","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41650"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41650"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41650\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}