{"id":41652,"date":"2007-07-24T20:49:27","date_gmt":"2007-07-24T12:49:27","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/michoud-workforce-praised-as-et-120-is-finally-shipped\/"},"modified":"2007-07-24T20:49:27","modified_gmt":"2007-07-24T12:49:27","slug":"michoud-workforce-praised-as-et-120-is-finally-shipped","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/michoud-workforce-praised-as-et-120-is-finally-shipped\/","title":{"rendered":"Michoud workforce praised as ET-120 is finally shipped"},"content":{"rendered":"<p>External Tank ET-120 is finally on its way to the Kennedy Space Center, within schedule for LON (Launch On Need) rescue mission support for Endeavour\u2019s upcoming STS-118 mission, earning high praise for the workforce from ET Project Manager John Chapman.\n<\/p>\n<p>  The tank, which has issues with its LO2 level sensors, will fly with Discovery on her primary mission of STS-120 in October.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section.<\/font><\/em><\/p>\n<p>Special STS-118 L2 Section now live, with all the&nbsp;MOD Flight Readiness Review presentations (x16), a newly updated Flight Plan and handbooks, along with a large amount of mission documentation. STS-120 documentation build-up already begun.<em><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 PAD FLOW**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122&nbsp;Processing**<\/font><\/em><\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article:<\/u><\/em><\/p>\n<p>The tank is one of four that were sent back from KSC for Return To Flight (RTF) modifications, a huge and complex undertaking which challenged a Michoud Assembly Facility (MAF) workforce, a workforce that is still recovering from hurricane Katrina.<\/p>\n<p>The tank still has work to be conducted on it, with the previously reported \u2018resistance\u2019 problems with LO2&nbsp;level sensors. At present, it is not clear which sensors \u2013 given there are many sensors representing levels of LOX propellant in the tank \u2013 are being evaluated for potential removal and replacement (R&amp;R) at KSC, or if further evaluation will take place before that decision is taken.<\/p>\n<p>It appears, however, that R&amp;R is the forward plan at this stage, which would take place at KSC, which may include the replacement of the Helium Inject Check Valve.<\/p>\n<p>\u2018Several liquid level sensors in the LO2 tank are showing abnormal resistance readings,\u2019 noted a NASA HQ memo. \u2018The signatures have a potential to affect tanking operations on the day of launch. Much discussion is on-going as to the failure mechanism and the impact to performing an R&amp;R of the sensors.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**UPDATED: Ride home through the fire,&nbsp;sparks&nbsp;and plasma of re-entry with Atlantis, Discovery and Endeavour. FOUR&nbsp;Stunning high quality&nbsp;2hr, 355-400mb Camcorder and HUD videos \u2013 from payload bay closure&nbsp;to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<p>Regardless, the tank is deemed as within schedule, just, for achieving its first role for Discovery, with the standby rescue LON mission currently targeting a ready date of October 5. <\/p>\n<p>Given the tank was originally due at KSC back in May, the ability of the workforce to work through modification issues \u2013 including the late \u2018poke outs\u2019 which included the&nbsp;level sensors \u2013 was commended by MSFC (Marshall Space Flight Center) boss Chapman. <\/p>\n<p>\u2018I commend you (Lockheed Martin manager Wanda Sigur) and your team for the ABSOLUTELY SUPERB job on Monday\u2019s Noon Board presentation on ET-120 LOX Loading Sensors and Helium Inject Check Valve R&amp;R. <\/p>\n<p>\u2018The charts were very informative and yet very succinct\u2026 a tough ideal to achieve in this highly technical business of ours. The quality of the presentation style, crispness of the explanations and responsiveness to the questions was also outstanding. <\/p>\n<p>\u2018I know that many members of your ET Team at MAF have not had much rest over the last few months. Please take solace in the realization that it is through THEIR tireless efforts and dedication that tomorrow ET-120 will begin its voyage to KSC to once again enter launch site processing as a full fledged flight asset.<\/p>\n<p>\u2018The entire Space Shuttle Program, the Agency, and in fact the Nation are in awe of your accomplishment.\u2019<\/p>\n<p>The tank was finally rolled out of building&nbsp;420 at MAF before&nbsp;7am local time this morning, ahead of its five day journey by barge to KSC.<\/p>\n<p>\u2018Current Schedule is to Offload ET-120 at the KSC Turn Basin on Sunday (07\/29) and Lift into H\/B-2 on Monday (07\/30),\u2019 confirmed processing information on Tuesday.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>External Tank ET-120 is finally on its way to the Kennedy Space Center, within schedule for LON (Launch On Need) rescue mission support for Endeavour\u2019s upcoming STS-118 mission, earning high praise for the workforce from ET Project Manager John Chapman. The tank, which has issues with its LO2 level sensors, will fly with Discovery on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41652","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41652"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41652"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41652\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}