{"id":41663,"date":"2007-07-12T00:41:37","date_gmt":"2007-07-11T16:41:37","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-arrives-at-pad-39a-august-7-launch-still-achievable\/"},"modified":"2007-07-12T00:41:37","modified_gmt":"2007-07-11T16:41:37","slug":"endeavour-arrives-at-pad-39a-august-7-launch-still-achievable","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-arrives-at-pad-39a-august-7-launch-still-achievable\/","title":{"rendered":"Endeavour arrives at Pad 39A \u2013 August 7 launch still achievable"},"content":{"rendered":"<p>With only a day or two of contingency remaining in the pad flow for STS-118, Endeavour has arrived at launch pad complex 39A this morning, ahead of the target launch date of August 7.\n<\/p>\n<p>  Delayed a day due to poor weather, Endeavour\u2019s stack eased out of the Vehicle Assembly Building (VAB) at 8:10pm local time, arriving at the pad at 2:10am. In total, eight IPRs (In Process Reviews) were cleared as no constraint for rollout following interface testing.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section. Special STS-118 L2 Section NOW LIVE, with breaking processing news and mission documentation.<\/font><\/em><em><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122 Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 ROLLOUT and Pad Flow**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><u>Article: <\/u><\/em><\/p>\n<\/p>\n<p>No engineering issues halted Endeavour from rolling out to the pad Monday morning, with only the weather in the local area proving to be the problem, as engineers readied NASA\u2019s youngest orbiter to start her trip to the launch complex. <\/p>\n<p>NASA information noted that by the time Endeavour received final clearance, time ran out on being able to \u2018hard down\u2019 Endeavour at the pad, before localised storms were forecast over the KSC area. <\/p>\n<p>\u2018To get to the pad in time we needed to roll out of the VAB NLT 0400 this morning. We got very close, and cleared the last of our constraints, but in the end, we did not have enough time for first motion by the cut-off time,\u2019 noted Tuesday processing information on L2. \u2018We are not carrying any constraints to tonight\u00e2\u20ac\u2122s (Tuesday)&nbsp;rollout effort.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;and&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<p>The only issues ahead of rollout consisted of a lost nut, which was found on the Mobile Launch Platform \u2018Zero Level\u2019 \u2013 and <font color=\"#0000ff\">the slight damage to the External Tank (ET-117), as reported on Monday<\/font>. Neither were deemed a problem after being cleared.<\/p>\n<p>\u2018Picked up eight IPRs (none are constraint to roll),\u2019 noted Shuttle Standup\/Integration report information. \u2018Planning to August 7 launch date; stoplight charts show yellow because are only two contingency days (as of Monday).\u2019<\/p>\n<p>\u2018Took paper (recorded issue)&nbsp;on a lost nut from D-platform. The nut was found on MLP Zero level,\u2019 added the processing information. \u2018The location was such that the only possible vehicle damage could be the SRB (Solid&nbsp;Rocket Motor)&nbsp;aft skirt. SRB Mechanical Engineering inspected and cleared the vehicle for roll to the pad. <\/p>\n<p>\u2018Potential ET Bipod damage found during B platform retract; retract was put on hold during evaluation. Scratches are within drawing limits and will be fly as is.\u2019<\/p>\n<p>Of the eight IPRs listed, several are of no concern, while the others will be worked on at the pad. One \u2013 which relates to the Master Events Controller (MEC) may involve a changeout at the pad, although there is limited information on the issue, which is in relation to the SRB commands which command ignition at launch, and separation at the end of first stage flight. <\/p>\n<p>\u2018During Ignition Sep PIC (Microcontroller) Test, SRB Ignition Fire 1 and Fire 2 failed. (Engineering) will reconfigure MDM (Multiplexers\/Demultiplexers) cross-strapping to get back to normal configuration for now until a trouble shooting plan is developed,\u2019 listed the IPR information. \u2018Will need to reconfigure (separate) MDMs when ready to trouble-shoot the IPR.\u2019 <\/p>\n<p>A changeout may be similar to that experienced with STS-99, when one of Endeavour\u2019s E-MECs had an anomaly during a standard pre-launch countdown test.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With only a day or two of contingency remaining in the pad flow for STS-118, Endeavour has arrived at launch pad complex 39A this morning, ahead of the target launch date of August 7. Delayed a day due to poor weather, Endeavour\u2019s stack eased out of the Vehicle Assembly Building (VAB) at 8:10pm local time, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41663","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41663"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41663"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41663\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}