{"id":41665,"date":"2007-07-09T19:26:52","date_gmt":"2007-07-09T11:26:52","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/endeavour-sts-118-rollout-moved-to-tuesday-night\/"},"modified":"2007-07-09T19:26:52","modified_gmt":"2007-07-09T11:26:52","slug":"endeavour-sts-118-rollout-moved-to-tuesday-night","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/endeavour-sts-118-rollout-moved-to-tuesday-night\/","title":{"rendered":"Endeavour\/STS-118 rollout \u2013 moved to Tuesday night"},"content":{"rendered":"<p>NASA managers have approved rollout of the STS-118 stack, despite a series of last minute troubleshooting with the SRBs (Solid Rocket Boosters) and slight damage to the External Tank (ET-117).\n<\/p>\n<p>  However, rollout was moved to Tuesday night (10pm local) due to poor weather forecast in the Kennedy Space Center area during the latter part of Endeavour\u2019s seven hour journey to launch pad complex 39A.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle, Ares, Orion&nbsp;and ISS&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section. Special STS-118 L2 Section NOW LIVE, with breaking processing news and mission documentation.<\/font><\/em><em><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-122 Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 ROLLOUT**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><u>Article: <\/u><\/em><\/p>\n<\/p>\n<p>The damage to ET-117 is minor and unlikely to be an issue, although it is being classed as the first \u2018mishap\u2019 of tank processing in the Vehicle Assembly Building (VAB) \u2013 after a platform was retracted ahead of rollout.   <\/p>\n<p>During that process, the platform caused minor scratches to the foam surrounding the Minus-Y and Plus-Y ET Bipod struts. Engineers are carrying out evaluations on the scratches. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;and&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing \u2013 several more videos showing landing from 90,000 ft also available**<\/font><\/p>\n<p>Inside the VAB, Shuttle Interface Verification Testing has been completed and Endeavour has been powered up. A long list of IPRs (In Process Reviews) were created over the weekend, mainly relating to electrical issues with the SRBs. <\/p>\n<p>\u2018During Ignition Sep PIC Test, SRB Ignition Fire 1 and Fire 2 failed; could not continue testing Saturday night,\u2019 noted Monday\u2019s processing information on one of the IPRs. \u2018Will try to work this after Stray Voltage tests (completed over Sunday).\u2019 <\/p>\n<p>Other IPRs are deemed no constraint to rollout, while another will be worked at the pad, allowing Endeavour to continue on track with the first launch attempt on August 7.<\/p>\n<p>Endeavour and the STS-118 stack were due to start first motion out of the VAB just after midnight Monday. However, storm activity in the area led to the one day delay.<\/p>\n<p>\u2018Rollout has been cancelled. Stand down due to unfavorable weather, which is predicted to arrive before arrival at pad,\u2019 noted United Space Alliance information.<\/p>\n<p>\u2018Call to stations 6pm tonight. 1st motion 10pm. 4am to 5am arrival at pad Wednesday.\u2019<\/p>\n<p>Preparations for the launch are proceeding on the timeline, with more waves of tankers, filled with LH2, arriving at Pad 39A, ready to be tanked into ET-117 just prior to launch. The rollout delay will have no impact.<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> <\/em><\/font><\/p>\n<p><font color=\"#ff0000\">**ROCK YOU LIKE A HURRICANE: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO \u2013 AS SEEN BY THE STS-117 CREW!!**<\/font>&nbsp;-.<br \/><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have approved rollout of the STS-118 stack, despite a series of last minute troubleshooting with the SRBs (Solid Rocket Boosters) and slight damage to the External Tank (ET-117). However, rollout was moved to Tuesday night (10pm local) due to poor weather forecast in the Kennedy Space Center area during the latter part of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41665","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41665"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41665"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41665\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}