{"id":41674,"date":"2007-06-29T20:09:37","date_gmt":"2007-06-29T12:09:37","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-due-back-at-ksc-noon-sunday\/"},"modified":"2007-06-29T20:09:37","modified_gmt":"2007-06-29T12:09:37","slug":"atlantis-due-back-at-ksc-noon-sunday","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-due-back-at-ksc-noon-sunday\/","title":{"rendered":"Atlantis due back at KSC noon Sunday"},"content":{"rendered":"<p>Issues with the retraction of Atlantis\u2019 landing gear (hydraulics), which stalled operations to mate Atlantis on top of the 747 Shuttle Carrier Aircraft (SCA) Thursday night, have been resolved by engineers at the Dryden Flight Research Center (DFRC).\n<\/p>\n<p>  Mating is now set to take place around midnight Friday in California, ahead of the duo\u2019s 7am Saturday morning flight to KSC \u2013 including at least one stop en route \u2013 for arrival back in Florida, noon Sunday.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation used in this article&nbsp;is available to download on the L2 section.<\/font><\/em><\/p>\n<p><em>Re-live Atlantis\u2019 STS-117 mission with on our <font color=\"#0000ff\">Flight Day specific interactive event pages<\/font> \u2013 open to all.<\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;Post Launch Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118&nbsp;Processing**<\/font><\/em><\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article: <\/u><\/em><\/p>\n<\/p>\n<p>As of Thursday, NASA were hoping to start Atlantis\u2019 ferry trip early on Friday. However, the problems with hydraulic operations, delayed the mating of Atlantis on top of the SCA. <\/p>\n<p>\u2018The morning meeting will convene at 0800 PDT to evaluate the status of the Orbiter, the Shuttle Carrier Aircraft, and the weather. Hydraulic operations to position the body flap and raise the landing gear are on hold for an o-ring,\u2019 noted processing information on Friday on L2.<\/p>\n<p>\u2018This is, in-turn, holding up mating of the Orbiter to the SCA. <\/p>\n<p>\u2018The final hydraulic operation to position the bodyflap and raise the landing gear was not completed last night. During a hose swap, an o-ring was damaged and some hydraulic fluid was spilled. <\/p>\n<p>All the fluid was contained except about 3 ounces and that has been cleaned up. No replacement o-rings are currently available. Replacement parts will be sent to Dryden from KSC today pending cleaning.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p>Another issue that held up mating related to a damaged left hand (LH) \u2018salad bowl\u2019 \u2013 which is a hemispherical ball connector on each side of the aft ET struts which fits into hollow hemispheres on the orbiter in the ET umbilical wells.<\/p>\n<p>\u2018The LH salad bowl installation is complete less ground checks. The damaged salad bowl removed from OV-104 has arrived at Huntington Beach for failure analysis to support STS-118 flight rationale. Tailcone bolts are installed and torqued. Fairing installations are in work,\u2019 added the processing information.<\/p>\n<p>\u2018Final orbiter power down and reconfigure for SCA power will be completed following resolution of the hydraulics issue.\u2019<\/p>\n<p>However, these issues have now been resolved.<\/p>\n<p>\u2018Orbiter mate to SCA is is estimated for 02:00 EDT Saturday,\u2019 added updated processing information.&nbsp;\u2018OV-104 (Atlantis)&nbsp;SCA depart from DRFR&nbsp;estimated 10:00 EST\/ 07:00 Pacfic Saturday OV 104 arrival at KSC estimated for noon Sunday July 1st.\u2019<\/p>\n<p><em><font color=\"#0000ff\">L2 members<\/font>: All documentation \u2013 from which the above article has quoted snippets \u2013 is available in full in the related L2 sections, updated live.<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" color=\"#0000ff\" size=\"2\">**STARLIGHT: BRAND NEW STS-117 MISSION&nbsp;REVIEW&nbsp;MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em> -.<br \/><\/em><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Issues with the retraction of Atlantis\u2019 landing gear (hydraulics), which stalled operations to mate Atlantis on top of the 747 Shuttle Carrier Aircraft (SCA) Thursday night, have been resolved by engineers at the Dryden Flight Research Center (DFRC). Mating is now set to take place around midnight Friday in California, ahead of the duo\u2019s 7am [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41674","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41674"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41674"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41674\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}