{"id":41679,"date":"2007-06-23T20:04:39","date_gmt":"2007-06-23T12:04:39","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-avoids-early-retirement-will-keep-flying-to-2010\/"},"modified":"2007-06-23T20:04:39","modified_gmt":"2007-06-23T12:04:39","slug":"atlantis-avoids-early-retirement-will-keep-flying-to-2010","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-avoids-early-retirement-will-keep-flying-to-2010\/","title":{"rendered":"Atlantis avoids early retirement \u2013 will keep flying to 2010"},"content":{"rendered":"<p>NASA managers have decided to manifest shuttle orbiter Atlantis with missions through to 2010, cancelling her previously planned retirement in 2008.\n<\/p>\n<p>  Information gained from STS-122 \u2013 the next flight of Atlantis \u2013 processing documentation, along with the latest FAWG (Flight Assignment Working Group) manifests, confirm the addition of two further missions for the orbiter, to follow after STS-122 and her flagship STS-125 mission to service the Hubble Space Telescope.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of&nbsp;Shuttle related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#ff0000\">L2 Members: All documentation and presentations used in this article are available to download on the L2 section.<\/font><\/em><\/p>\n<p><em>Re-live Atlantis\u2019 STS-117 mission with on our <font color=\"#0000ff\">Flight Day specific interactive event pages<\/font> \u2013 open to all.<\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;Post Launch Processing \u2013 LIVE**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118&nbsp;Processing**<\/font><\/em><\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><u>Article: <\/u><\/em><\/p>\n<\/p>\n<p>Atlantis was originally set to retire in 2008 <font color=\"#0000ff\">after the Hubble mission<\/font>. Given the shuttle program is due to end in 2010, the subsequent OMDP (Orbiter Maintenance Down Period) \u2013 which would have taken at least a year \u2013&nbsp;it was decided her retirement in 2008 was deemed to be&nbsp;the best course of action. <\/p>\n<p>Atlantis would have remained inside an OPF (Orbiter Processing Facility) and maintained to near flight ready condition, to be used as a parts donor for her two sisters, Discovery and Endeavour. <\/p>\n<p>This decision has now been reversed, with Atlantis taking two missions which were previous allocated to either Discovery or Endeavour. The STS-122 baseline presentation \u2013 acquired by this site\u2019s L2 section in May \u2013 shows that one of those flights which Atlantis will take is STS-127, set to launch NET (No Earlier Than) June 30, 2009.<\/p>\n<p>Previously Endeavour\u2019s mission, STS-127 will deliver the final element of the Japanese Experiment Module \u2013 the EF (Exposed Facility \u2018Terrace\u2019) \u2013 which will be located outside the port cone of the JAXA Pressurized Module (PM) core component \u2013 set to fly with Discovery on STS-124 (April 24, 2008). <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font color=\"#0000ff\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p>The other mission Atlantis is likely to take is STS-131 (ULF4), carrying the CBC, Russian Docking Cargo Module, manifested to fly NET January 28, 2010. <\/p>\n<p>With this extension to Atlantis\u2019 operational lifetime, certain elements of the OMDP can still be safely carried out during pre\/post-launch processing intervals. <\/p>\n<p>The ability to keep the fleet flying without the stand-down of OMDP before 2010 was outlined in an October 2006 presentation to the PRCB (Program Control Requirements Board). <\/p>\n<p>Titled the \u20183 year \/ 8 Flight OMRSD (Operations Maintenance Requirements Specifications Document) Review,\u2019 the presentation from the Orbiter Project Office (OPO) showed that only Endeavour had the ability to keep flying until 2010 before an OMDP was due \u2013 under the then current guidelines. <\/p>\n<p>\u2018Current 3 year\/8 flight OMDP interval requirement does not support remaining flight manifest without test reset or interval increase,\u2019 the presentation opened, before noting that Discovery is actually due an OMDP in March 2008, Atlantis in July 2008, along with Endeavour in July 2010 at the time of the document\u2019s creation.<\/p>\n<p>The purpose of the evaluations noted in the presentation was to look at the possibility of extending the OMDP interval requirement to 5.5 years, which would enable the whole fleet to keep flying until the scheduled retirement of the shuttle program.<\/p>\n<p>This appeared favorable, as the review found that out of the \u2018722 subsystem-coded requirements\u2019 only 29 \u2018dispositions\u2019 were deemed unacceptable past the three year interval \u2013 with those requirements likely to be worked on the orbiters during pre\/post flight processing flows, compared with 693 \u2018dispositions\u2019 classed as acceptable for the extension to a 5.5 year interval between OMDPs.<\/p>\n<p>Concluding that the program will \u2018define new OMDP new interval of 8 flights and 5.5 years, for extendable requirements,\u2019 the shuttle program will \u2018continue to partner with KSC the Implementation Plans for the items that must be performed prior to 3 years,\u2019 with Discovery and her previously due date for OMDP \u2013&nbsp;which ensures that \u2018based on these OMRSD Reviews, (OMDP, Interval and Time\/Cycle), there should be no large impacts to the current manifest.\u2019<\/p>\n<p>Ultimately, this was implemented into the STS-122 baseline, before finally being confirmed with the extension to Atlantis\u2019 operation lifetime in the latest FAWG manifests, which also confirm some refinements to the schedule, including the advancement of Endeavour\u2019s upcoming return to flight action after a five year wait. Another set of minor refinements were made to the manifest last Friday.<\/p>\n<p><font color=\"#3300ff\">STS-118 now has a new NET date of August 7<\/font>, assisted by a very smooth processing flow which is allowing the youngest orbiter to rollover&nbsp;out of&nbsp;OPF 2 on July 2, ahead of mating with ET-117 and the twin Solid Rocket Boosters inside the VAB.<\/p>\n<p>Meanwhile, Atlantis \u2013 <font color=\"#3300ff\">currently at Edwards Air Force Base after Friday\u2019s return to Earth on STS-117 <\/font>\u2013 is undergoing a level of post flight processing, including the flushing of residual propellants from her&nbsp;main engines, and the SCAPE operations to remove hazardous hypergolic fuels&nbsp;from her Reaction Control Systems.<\/p>\n<p>After this process, a tail cone faring will be mated&nbsp;on her aft, before being mated with NASA\u2019s SCA (Shuttle Carrier Aircraft) next week for the piggyback ride back to KSC. <\/p>\n<p>Her crew, including <font color=\"#3300ff\">former ISS crewmember Suni Williams<\/font>, have arrived back at their home base in Houston on Saturday.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em>For <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>L2 members<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>, follow and review&nbsp;NASA\u2019s evaluations on the L2 Flight Day specific pages for STS-117\u2019s mission and post launch processing (which contain many 100s and&nbsp;same day MMT level documentation and presentations \u2013&nbsp;uploaded live during each Flight Day).<\/em><\/font><\/p>\n<p><u><font size=\"3\">Latest Manifest \u2013 in text form:<\/font><\/u><\/p>\n<p>2007 <br \/>July 22&nbsp;\u2013 Progress M-61 <b><\/b>(26P<b><\/b>) <br \/>August 7&nbsp;\u2013 STS-118 <b><\/b>(13A.1<b><\/b>)&nbsp;\u2013 Endeavour&nbsp;\u2013 Spacehab-SM, S5, ESP3 <br \/>[October 5&nbsp;\u2013 STS-322 <b><\/b>(Rescue STS-118<b><\/b>)&nbsp;\u2013 Discovery] <br \/>October 10&nbsp;\u2013 Soyuz TMA-11 <b><\/b>(15S<b><\/b>) <br \/>October 20&nbsp;\u2013 STS-120 <b><\/b>(10A<b><\/b>)&nbsp;\u2013 Discovery&nbsp;\u2013 Node 2 \u2018Harmony\u2019 <br \/>[December 2&nbsp;\u2013 STS-320 <b><\/b>(Rescue STS-120<b><\/b>)&nbsp;\u2013 Atlantis] <br \/>December 6&nbsp;\u2013 STS-122 <b><\/b>(1E<b><\/b>)&nbsp;\u2013 Atlantis&nbsp;\u2013 ICC-Lite, Columbus <br \/>December 12 <b><\/b>(TBD<b><\/b>)&nbsp;\u2013 Progress M-62 <b><\/b>(27P<b><\/b>) <\/p>\n<p>2008 <br \/>January&nbsp;\u2013 ATV-1 \u2018Jules Verne\u2019 <br \/>[January 31&nbsp;\u2013 STS-323 <b><\/b>(Rescue STS-122<b><\/b>)&nbsp;\u2013 Endeavour] <br \/>February 12 <b><\/b>(TBD<b><\/b>)&nbsp;\u2013 Progress M-63 <b><\/b>(28P<b><\/b>) <br \/>February 14&nbsp;\u2013 STS-123 <b><\/b>(1J\/A<b><\/b>)&nbsp;\u2013 Endeavour&nbsp;\u2013 SLP-D1 with SPDM \u2018Dextre\u2019, JEM ELM-PS <br \/>April 8 \u2013 Soyuz TMA-12 <b><\/b>(16S<b><\/b>) <br \/>[April 10&nbsp;\u2013 STS-324 <b><\/b>(Rescue STS-123<b><\/b>)&nbsp;\u2013 Discovery] <br \/>April 24&nbsp;\u2013 STS-124 <b><\/b>(1J<b><\/b>)&nbsp;\u2013 Discovery&nbsp;\u2013 JEM PM with JEM RMS&nbsp;<br \/>[July 23&nbsp;\u2013 STS-326 <b><\/b>(Rescue STS-124<b><\/b>)&nbsp;\u2013 Endeavour] <br \/>September 10&nbsp;\u2013 STS-125 <b><\/b>(HST-SM4<b><\/b>)&nbsp;\u2013 Atlantis <br \/>[September 17&nbsp;\u2013 STS-400 <b><\/b>(Rescue STS-125<b><\/b>)&nbsp;\u2013 Endeavour] <br \/>October 16&nbsp;\u2013 STS-126 <b><\/b>(ULF2<b><\/b>)&nbsp;\u2013 Endeavour&nbsp;\u2013 MPLM, LMC <\/p>\n<p>2009 <br \/>January 15&nbsp;\u2013 TBD&nbsp;\u2013 Discovery&nbsp;\u2013 TBD <br \/>April 23&nbsp;\u2013 TBD&nbsp;\u2013 Endeavour&nbsp;\u2013 TBD <br \/>June 30&nbsp;\u2013 TBD&nbsp;\u2013 Atlantis&nbsp;\u2013 TBD <br \/>September 11&nbsp;\u2013 TBD&nbsp;\u2013 Discovery&nbsp;\u2013 TBD <br \/>November 19&nbsp;\u2013 TBD&nbsp;\u2013 Endeavour&nbsp;\u2013 TBD <\/p>\n<p>2010 <br \/>January 28&nbsp;\u2013 TBD&nbsp;\u2013 Atlantis&nbsp;\u2013 TBD <br \/>April 7&nbsp;\u2013 TBD&nbsp;\u2013 Discovery \u2013 TBD <br \/>June 10&nbsp;\u2013 TBD&nbsp;\u2013 Endeavour&nbsp;\u2013 TBD<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 COMING SOON: Atlantis\/Starlight.<br \/><\/em><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have decided to manifest shuttle orbiter Atlantis with missions through to 2010, cancelling her previously planned retirement in 2008. Information gained from STS-122 \u2013 the next flight of Atlantis \u2013 processing documentation, along with the latest FAWG (Flight Assignment Working Group) manifests, confirm the addition of two further missions for the orbiter, to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41679","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41679"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41679"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41679\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}