{"id":41699,"date":"2007-06-07T23:05:27","date_gmt":"2007-06-07T15:05:27","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/shuttle-managers-continue-evaluations-rss-retracted\/"},"modified":"2007-06-07T23:05:27","modified_gmt":"2007-06-07T15:05:27","slug":"shuttle-managers-continue-evaluations-rss-retracted","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/shuttle-managers-continue-evaluations-rss-retracted\/","title":{"rendered":"Shuttle managers continue evaluations \u2013 RSS retracted"},"content":{"rendered":"<p>With less than a day to go before the lift-off of STS-117, Shuttle Atlantis is having her final issues resolved, as S0007 Launch Countdown procedures enter the final stages.\n<\/p>\n<p>  The Rotating Service Structure (RSS) has been rolled back to reveal a floodlit Atlantis on Pad 39A, as managers continue to approve flight rationale surrounding the final few issues surrounding the vehicle.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;L-1 Countdown&nbsp;\u2013 LIVE**<\/font><\/em>&nbsp;\u2013 <em><font color=\"#ff0000\">L2 Members&nbsp;can follow live evaluations with memos and presentations as they are produced via our special STS-117 Special Section<\/font><\/em>.<\/p>\n<p><font color=\"#0000ff\"><em>STS-117: LIVE LAUNCH DAY<\/em><\/font> \u2013<em> The world\u2019s most read interactive live event pages for Shuttle Launches<\/em>.<\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">With the RSS now retracted, work will be carried out in preparation for tanking tomorrow. Technicians will&nbsp;arrive at work&nbsp;in the early hours to follow the process.<\/font><\/p>\n<p>Only a few IPRs (In Process Reviews) remained by the end of day on Thursday, with one \u2013 a leak observed in the Ground Support Equipment (GSE) during PRSD (Power Reactant Storage and Distribution) loading \u2013 receiving a waiver. <\/p>\n<p><font face=\"Arial\" size=\"2\">The major bulk of Mission Management Team (MMT) and OPO (Orbiter Project Office) meetings have been related to t<font color=\"#0000ff\">he \u2018suspect\u2019 MSBLS (Microwave Scanning Beam Landing System), or MLS (Microwave Landing System<\/font>). Orbiters have three MLS\u2019 on board, with number three being the \u2018suspect\u2019 in question. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The MMT met to discuss the MLS issues, before the OPO looked at historical data surrounding the system. The late OPO meeting ended without a resolution, but will \u2018tag-up\u2019 Friday morning to finalize their evaluations. A positive conclusion is expected. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018MLS#3 \u2013 failed S\/T yesterday for Range. Performed 20 additional S\/Ts that all passed,\u2019 noted manager Steve Poulos on the L-1 Day MMT overview presentation <font color=\"#0000ff\">(on L2).<\/font> \u2018Leading theory is ingestion of gas that caused start up transient, later gas heated up and cleared.<\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font> <\/p>\n<p>\u2018We were ready to R&amp;R (Remove and Replace) last night, but weather didn\u2019t cooperate, causing delays in PRSD loading. LCC (Launch Commit Criteria) still go even if call MLS failed.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">The OPO meeting looked back at historical data relating to this number three MLS, which included the history of power up transients and hardware. This MLS number three had its decoder box removed and replaced earlier in the month and suffered some issues at that time. <\/font><\/p>\n<p>Poulos noted that there is \u2018a need to go look back and see if hardware is telling us something. Still go for MLS #3.\u2019<\/p>\n<p>Manager Leroy Cain \u2013 at the MMT \u2013 noted the two string ability even with one failure (number 3), which keeps the MLS within the LCC requirements for launch, as there is redundancy even if MLS 1 or MLS 2 fails during the mission. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018MOD (Mission Operations Directorate), Firing room and Orbiter will think about what we want to do if we see something in the count,\u2019 he added. \u2018Don\u2019t have a LCC violation if we declared MLS failed. We have not declared MLS#3 failed yet for purposes of the count.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Other managers, and even astronaut Steve Lindsey, gave their opinions on how to deal with a failure of the MLS system during landing (or abort), with references to the GPS (Global Positioning Satellite) system. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018GPS is great tool, but not a MLS replacement,\u2019 added one manager. \u2018MLS takes precedent at lower altitudes, but in a pinch could take GPS if we lost all MLS. LCC\/FR maintain MLS for both single and three string GPS flights.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The focus now appears to be on whether to actually class MLS number 3 as failed, given it had passed 20 tests without an error being found. If managers decide to class the system as failed \u2013 as opposed to suspect \u2013 then Atlantis can still launch, although extra focus will be placed on the MLS system as a whole during the mission.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018(We are) not declaring it failed, there is work to do before get into final countdown. I consider it suspect,\u2019 noted Cain. \u2018As to whether we declare it failed we need to do some more work. That\u2019s where I think we are.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The full evaluation transcript was extensive, allowing comments from all who wished to make one \u2013 another example of the professionalism and openness of NASA evaluations and meetings that is now common place. This was also the subject of praise from Space Shuttle S&amp;MA.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Thanks for all the dissenting opinions that helped make good flight rationale. We have a well trained \u2013&nbsp;and after their long wait \u2013 I am sure they are ready to go. Looking forward for having Sunni (Williams) home.\u2019<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 COMING SOON: Atlantis\/Starlight.<br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With less than a day to go before the lift-off of STS-117, Shuttle Atlantis is having her final issues resolved, as S0007 Launch Countdown procedures enter the final stages. The Rotating Service Structure (RSS) has been rolled back to reveal a floodlit Atlantis on Pad 39A, as managers continue to approve flight rationale surrounding the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41699","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41699"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41699"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41699\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}