{"id":41702,"date":"2007-06-05T22:24:03","date_gmt":"2007-06-05T14:24:03","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-117-countdown-begins-for-atlantis\/"},"modified":"2007-06-05T22:24:03","modified_gmt":"2007-06-05T14:24:03","slug":"sts-117-countdown-begins-for-atlantis","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-117-countdown-begins-for-atlantis\/","title":{"rendered":"STS-117 \u2013 Countdown begins for Atlantis"},"content":{"rendered":"<p>Launch processing is continuing smoothly for Shuttle Atlantis at Launch Complex 39A at the Kennedy Space Center, as the countdown clock started ticking down to Atlantis\u2019 lift-off on Friday night.\n<\/p>\n<p>  Engineers and technicians received their call to stations 30 minutes prior to the start of the final phase of preparations \u2013 known as S0007 \u2013 which initiated the start of the three day countdown, as a complex ballet of pre-scheduled operations begin in earnest.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;** <font color=\"#ff0000\">Including&nbsp;all FRR documentation and presentations. All&nbsp;processing content and quotes from the article below orginate from L2\u2019s STS-117 Special Section.<\/font><\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;\u2013 S0007 Countdown \u2013 LIVE**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Atlantis\u2019 payload bays have been closed for the final time today, following a temporary requirement to open them for the purpose of accomplishing battery charging inside the cargo hold. Hyper\/MPS (Main Propulsion System) press\/closeouts were completed earlier this morning.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">STS-117 was set to launch earlier in the year, until an unexpected hailstorm on February 26 <font color=\"#0000ff\">damaged Atlantis\u2019 External Tank<\/font> (ET-124). However, the three month wait is nearly over, as Atlantis builds ever closer to the mission that will bring a new set of solar arrays to the International Space Station.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We\u2019re relieved that we are almost there,\u2019 said NASA Test Director Steve Payne at a press briefing on Tuesday. \u2018We are tracking no issues at the moment.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018It\u2019s been a long waiting period, and as you probably know, whenever you\u2019re ready to go and you have to stop and wait for a few months, it\u2019s a disappointment. But once you spool back up and everything\u2019s ready, and it looks like everything\u2019s falling into place nicely, the team\u2019s really excited and we\u2019re ready to get off the ground.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASA announced today that there is currently a 70 percent chance of favorable weather at the launch complex. Thunderstorms are expected to move into the area earlier in the day, but officials believe they will clear out as launch time nears.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The weather looks reasonably promising for launch,\u2019 shuttle weather officer Kathy Winters said. \u2018We do expect to see some afternoon thunderstorms in the area on launch day, but by launch time all that weather should move inland with the sea breeze.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The three day launch countdown is set to begin at 9:00pm local time on Tuesday night, with a precise set of events set to take place in anticipation of lift-off on Friday night at 7:38pm. With several built-in holds, the countdown clock started counting down from T-1 day, 19 hours.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Several milestones are upcoming for Atlantis. At around 10:30pm on Thursday the Rotating Servicing Structure (RSS) \u2013 that encapsulates the launch stack while workers service the shuttle prior to launch \u2013 is scheduled to be retracted. Tanking of the ET will take place no earlier than 9:12am Friday morning. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The ten-minute launch window opens up at 7:33pm. Should the launch&nbsp;be scrubbed on Friday, opportunities to lift-off remain open until July 17. A few constraints exist during STS-117\u2019s window, due to an Atlas V that is scheduled to launch on June 14 and a Delta II that is scheduled for a July 1 launch.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Final approval for the launch countdown to proceed as planned, including the go-ahead for the retraction of the RSS, will be giving at the L-2 Day Mission Management Team (MMT) meeting, <font color=\"#0000ff\">with only has a few issues remaining&nbsp;to be&nbsp;closed out<\/font>. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">On the whole, Atlantis\u2019 processing towards launch is proceeding well, with no show stoppers.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018All our systems right now are in great shape \u2013 we\u2019re tracking no constraints that are show stoppers,\u2019 said Payne. \u2018Teams are ready and everybody\u2019s eager to launch \u2013 we\u2019re looking forward to a successful assembly mission.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Payne also re-emphasized that a <font color=\"#0000ff\">planned strike by 570 United Space Alliance workers<\/font> will not affect launch or mission operations.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 COMING SOON: Atlantis\/Starlight.<br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Launch processing is continuing smoothly for Shuttle Atlantis at Launch Complex 39A at the Kennedy Space Center, as the countdown clock started ticking down to Atlantis\u2019 lift-off on Friday night. Engineers and technicians received their call to stations 30 minutes prior to the start of the final phase of preparations \u2013 known as S0007 \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41702","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41702"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41702"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41702\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}