{"id":41707,"date":"2007-05-31T19:49:07","date_gmt":"2007-05-31T11:49:07","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-117-frr-completed-atlantis-confirmed-for-june-8-launch\/"},"modified":"2007-05-31T19:49:07","modified_gmt":"2007-05-31T11:49:07","slug":"sts-117-frr-completed-atlantis-confirmed-for-june-8-launch","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-117-frr-completed-atlantis-confirmed-for-june-8-launch\/","title":{"rendered":"STS-117 FRR completed \u2013 Atlantis confirmed for June 8 launch"},"content":{"rendered":"<p>Shuttle managers have concluded their Flight Readiness Review (FRR) by approving Shuttle Atlantis to proceed with the first launch attempt of STS-117 on June 8.\n<\/p>\n<p>  The as-expected announcement follows a meeting that lasted one and a half days, which shuttle managers used to discuss all elements regarding the vehicle and the upcoming mission.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><font color=\"#0000ff\"><em>available to download&nbsp;on L2<\/em><\/font><font color=\"#0000ff\"><em>&nbsp;** <font color=\"#ff0000\">Including&nbsp;all FRR documentation and presentations.<\/font><\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;PAD FLOW&nbsp;\u2013 LIVE**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The FRR was approved by all members, which discussed launch safety criteria such, including the repaired External Tank (ET-124) which initially caused the delay to the launch until June. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We had a very good review over the past day and a half,\u2019 said associate administrator Bill Gerstenmaier. \u2018We\u2019ve set the launch date for June 8. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We often talk about a high performance team and how folks work together, across the contractors and work as a true team to get things done. I don\u2019t think I\u2019ve ever seen an effort done as well as this External Tank team.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Other items that were discussed involved the <font color=\"#0000ff\">Composite Overwrap Pressure Vessels (COPV)<\/font>&nbsp;in Atlantis, the <font color=\"#0000ff\">aluminum housing\/inserts for flange bolts that hold the Low Pressure Oxidizer Turbo Pump (LPOTP<\/font>) in place inside the main engines, the Pan Tilt Unit (PTU) Qual Unit Failure issue, and a crack in one tile \u2013 all of which gained flight rationale.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">In all, over 100 issues were up for discussion. <\/font><font face=\"Arial\" size=\"2\">However, it was the External Tank that continued to gain the majority of the comments during the post-FRR media briefing, with Shuttle manager Wayne Hale paying a special tribute to the workforce involved.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font> <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018I can come to you today and say we are extremely confident that we have done a perfectly good repair and that we have a tank that is safe to fly \u2013 which is all due to the very hard work of this team which as you know is still recovering from Katrina,\u2019 said Hale. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018In the face of all the work they had to do to get this particular tank repaired and ready for flight, they have also had to do a major redesign change to the Ice Frost Ramps (IFR) for ET-120 and for a final design change for ET-128 onwards, and keep production up on the schedule that we asked them to do. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">  <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>\u2018Adversity can breed character and resilience, and I\u2019m extremely proud of this team that has come through all of these difficulties and be stronger for it.\u2019<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>Another&nbsp;article will appear shorly,&nbsp;reviewing the FRR documentation acquired by this site on L2.<\/em><br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 COMING SOON: Atlantis\/Starlight.<br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle managers have concluded their Flight Readiness Review (FRR) by approving Shuttle Atlantis to proceed with the first launch attempt of STS-117 on June 8. The as-expected announcement follows a meeting that lasted one and a half days, which shuttle managers used to discuss all elements regarding the vehicle and the upcoming mission. **The most [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41707","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41707"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41707"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41707\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}