{"id":41715,"date":"2007-05-22T20:45:57","date_gmt":"2007-05-22T12:45:57","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-ready-for-hyper-loading-sts-118-build-up-starts-thursday\/"},"modified":"2007-05-22T20:45:57","modified_gmt":"2007-05-22T12:45:57","slug":"atlantis-ready-for-hyper-loading-sts-118-build-up-starts-thursday","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-ready-for-hyper-loading-sts-118-build-up-starts-thursday\/","title":{"rendered":"Atlantis ready for hyper loading \u2013 STS-118 build up starts Thursday"},"content":{"rendered":"<p>Space Shuttle operations are building up momentum this week, as Atlantis heads into her next stage of launch preparations for the June 8 launch attempt for STS-117.\n<\/p>\n<p>  At the same time, booster build-up will begin inside the Vehicle Assembly Building (VAB) on Thursday, as Endeavour\u2019s stack \u2013 ahead of the NET (No Earlier Than) August 9 launch date for STS-118 \u2013 will begin to take shape.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation, plus expansive daily processing documentation and updates&nbsp;are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;PAD FLOW&nbsp;\u2013 LIVE**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Hyper loading \u2013 the fuelling of hypergolic fuels into Atlantis\u2019 RCS (Reaction Control System) thrusters \u2013 will take until Friday to complete. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Had a good weekend. All SSME leak checks were completed, and reports back are good. Hyper preps were in work all weekend and are nearly completed. Will be in a position to begin hyper loading on 001 Wednesday; expect to complete this by Friday,\u2019 noted the latest shuttle integration report. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018This should put them in a good position at end of next week to be ready for launch on June 8th. Great work by folks over weekend to complete several items. Work was completed successfully and was a great effort all around.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p>The notably smooth pad processing flow is thankfully lacking any major issues, with the only notes of interest relayed from the pad being the replacement of a couple of screws on the payload bay doors \u2013 which have now been closed ahead of hyper loading.<\/p>\n<p>No time was lost on pad processing&nbsp;during Tuesday, despite an <font color=\"#0000ff\">incursion into KSC airspace by a small plane<\/font>.<\/p>\n<p><font face=\"Arial\" size=\"2\">Also ahead of the launch, several LOX tankers have arrived at the Kennedy Space Center, ready to fuel Atlantis\u2019 repaired ET-124, for what will be four launch attempts, due to the June 14 launch target for the Atlas V launch with NRO L-30 from Cape Canaveral Air Force Station. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Atlas is currently on Range, with June 14 launch date, so Range re-configuration begins around June 12,\u2019 added NASA information. \u2018Trying to have four Shuttle launch attempts through June 12. If do not go by then, must stand down until June 17, and then will have an opportunity every other day.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">STS-117\u2019s Flight Readiness Review (FRR) remains on schedule for the middle of next week, with most Delta reviews of FRR material now completed. (Full STS-117&nbsp;MOD FRR and Delta FRR coverage on L2).<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile on Endeavour, Reusable Solid Rocket Motor set RSRM-97, Booster Integration set BI130, will begin to build up on Mobile Launch Platform 1 inside the VAB on Thursday. This process is working on a tight timeline, which engineers will be working extra hours to complete. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Got MLP (Mobile Launch Platform)&nbsp;in VAB Friday. Will begin SRB (Solid Rocket Booster)&nbsp;stacking this Thursday,\u2019 added integration information. \u2018This is the critical path for this mission. Working six and seven day weeks to complete this.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Endeavour herself is enjoying a smooth run towards <font color=\"#0000ff\">her first flight in nearly five years<\/font>, with preparations to close her payload doors ahead of rollover to the VAB on July 5 (current schedule). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Nose landing gear rigging and tile is in work. Plan to complete this before landing gear functionals on Friday,\u2019 added processing information. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Preps are in work for final payload bay door closure; doors should be closed by Wednesday. This will close out the midbody. Doors will remain closed until vehicle reaches the pad.\u2019<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Space Shuttle operations are building up momentum this week, as Atlantis heads into her next stage of launch preparations for the June 8 launch attempt for STS-117. At the same time, booster build-up will begin inside the Vehicle Assembly Building (VAB) on Thursday, as Endeavour\u2019s stack \u2013 ahead of the NET (No Earlier Than) August [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41715","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41715"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41715"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41715\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}