{"id":41722,"date":"2007-05-15T23:33:03","date_gmt":"2007-05-15T15:33:03","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-arrives-at-pad-39a-endeavour-readied-for-rollover\/"},"modified":"2007-05-15T23:33:03","modified_gmt":"2007-05-15T15:33:03","slug":"atlantis-arrives-at-pad-39a-endeavour-readied-for-rollover","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-arrives-at-pad-39a-endeavour-readied-for-rollover\/","title":{"rendered":"Atlantis arrives at Pad 39A \u2013 Endeavour readied for rollover"},"content":{"rendered":"<p>Leaving the VAB (Vehicle Assembly Facility) Tuesday morning, Shuttle Atlantis and her repaired \u2013 and somewhat speckled \u2013 External Tank have arrived at Pad 39A ahead of the June 8 launch of STS-117.\n<\/p>\n<p>  The crawler transporter started first motion just after 5am local time, ahead of a six hour trip to the pad \u2013 following over two months of repairs on ET-124 after it suffered hail storm damage. Meanwhile, Endeavour is set to rollover on July 5.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;ROLLOUT \u2013 LIVE**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-120 (LON-320)&nbsp;Processing**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><em><font color=\"#e50000\"><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\">Related documentation on L2<\/font><font face=\"Arial\" size=\"2\">: Five major presentations on COPV evaluations. Standup Reports. Daily Processing Ops Reports. Lockheed Martin Schedule Presentations. Daily ATK Processing information. Daily ET Repair Assessment Presentations \u2013 plus more (vast). All the NASA and ATK reports on the train crash, plus vast amount of exclusive photos of the aftermath \u2013 plus more\u2026the ultimate place to follow Shuttle processing.<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**Previous articles related to&nbsp;the ET&nbsp;damage events: <\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 1<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em> \u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 2<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 3<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 4<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 5<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 6<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 7<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 8<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 9<\/em><\/font><em><font face=\"Arial\"><\/font><font size=\"2\"><\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 10<\/font><\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 11<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 12<\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 13<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 14<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 15<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 16**<\/font><\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 17**<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 18<\/font><font color=\"#0000ff\">** \u2013 <font color=\"#0000ff\">Article 19**<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 20**<\/font><\/font>&nbsp;<font color=\"#000000\">click for <\/font><\/em><em><font face=\"Arial\" size=\"2\">more screenshots of the damage.<\/font><\/em><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018All ET work completed,\u2019 declared shuttle manager Wayne Hale on the latest Stand-up\/Integration report. \u2018Inspections performed on weekend and the paper reviewed (12,000 pages). Scaffolds were removed. Having constraints review; constraints appear low.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Atlantis is rolling to the pad with a few issues, including a requirement for an engine seal check, after leaking seals were changed out at the weekend inside the VAB. This follows the removal of Atlantis\u2019 engines to check for RepliSet contamination. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Had couple of engine seals leaking; changed these out on weekend, and leak checks will be performed at pad,\u2019 added the Stand-up. \u2018Ultrasound performed on LO2 turbopump.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">That is not expected to be a problem, with the only issue being evaluated on Atlantis being rippling observed on one of her COPV (Composite Overwrap Pressure Vessel) tanks.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Only issue still working for launch is waviness in titanium liner in COPV S\/N 2 tank (spare tank that were getting ready to put in OV-104 after STS-117). Know now this phenomenon appears in many tanks. Not documented in old inspection reports, but weren\u2019t looking for this. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Have actions on this topic, teams formed, and have another tagup with OPO (Orbiter Project Office) Wednesday.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">STS-117 is still expected to be the first of four flights in 2007, which is reflected in the positive outlook of the next two rollover dates for Atlantis\u2019 sisters. Endeavour is set to rollout on July 5 for STS-118. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Planned orbiter rollover date is July 5,\u2019 noted the processing status of Endeavour this week. \u2018Did CEIT (Crew Equipment Interface Test) on weekend; couple of switches were loose and are under engineering review. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Have 30 TPS (Thermal Protection System) cavities remaining; most awaiting configuration. Dome heat shields (for the engines) installed. Closing payload bay doors in one week (earlier than normal) for rollout; need to do this for tile work and modal test.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, Discovery is being prepared to move to the VAB on August 31, ahead of her STS-120 mission. Major work on Discovery relates to post STS-116 work on her TPS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Good progress toward OPF (Orbiter Processing Facility) rollover scheduled August 31; no issues,\u2019 added her processing update. \u2018Total tile cavity count is 250, of which 122 remain to bond.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Tuesday\u2019s rollout of Atlantis \u2013 without the need for a tank swap with ET-117 \u2013 earned more praise from the shuttle management, who thanked the team effort in turning around Atlantis in time for the NET (No Earlier Than) June 8 launch. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Thanks to KSC team and ET project for working ET repairs over last 10 weeks. They have emphasized this is a team effort; many individuals worked long hours getting job done. Mr. Hale concurred.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Leaving the VAB (Vehicle Assembly Facility) Tuesday morning, Shuttle Atlantis and her repaired \u2013 and somewhat speckled \u2013 External Tank have arrived at Pad 39A ahead of the June 8 launch of STS-117. The crawler transporter started first motion just after 5am local time, ahead of a six hour trip to the pad \u2013 following [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41722","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41722"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41722"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41722\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}