{"id":41726,"date":"2007-05-10T23:03:03","date_gmt":"2007-05-10T15:03:03","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/last-minute-problem-but-rollout-is-approved\/"},"modified":"2007-05-10T23:03:03","modified_gmt":"2007-05-10T15:03:03","slug":"last-minute-problem-but-rollout-is-approved","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/last-minute-problem-but-rollout-is-approved\/","title":{"rendered":"Last minute problem \u2013 but rollout is approved"},"content":{"rendered":"<p>Lockheed Martin engineers have evaluated what was being described as \u201clow foam\u201d on the closeout of repairs on the nose cone of ET-124.\n<\/p>\n<p>  The hail damaged tank is undergoing Ogive Pencil Point BX-265 (foam) trim operations during these final stages of completing the requirements for rollout. However, Atlantis will head to Pad 39A on the 16th, following a review of the tank repairs on Friday.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;VAB Flow**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><em><font color=\"#e50000\"><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\">Related documentation on L2<\/font><font face=\"Arial\" size=\"2\">: Standup Reports. Daily Processing Ops Reports. Lockheed Martin Schedule Presentations. Daily ATK Processing information. Daily ET Repair Assessment Presentations \u2013 plus more (vast)\u2026.the ultimate place to follow Shuttle processing.<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**Previous articles related to&nbsp;the ET&nbsp;damage events: <\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 1<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em> \u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 2<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 3<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 4<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 5<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 6<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 7<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 8<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 9<\/em><\/font><em><font face=\"Arial\"><\/font><font size=\"2\"><\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 10<\/font><\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 11<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 12<\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 13<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 14<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 15<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 16**<\/font><\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 17**<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 18<\/font><font color=\"#0000ff\">** \u2013 <font color=\"#0000ff\">Article 19**<\/font><\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 20**<\/font>&nbsp;<font color=\"#000000\">click for <\/font><\/em><em><font face=\"Arial\" size=\"2\">more screenshots of the damage.<\/font><\/em><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">Should the evaluations \u2013 which were ongoing on Thursday through Friday&nbsp;\u2013 prove the low foam areas require re-work, engineers will&nbsp;need to trim out the undersprayed area, re-apply conathane and re-spray the affected area.<\/font><br \/>\n<font face=\"Arial\" size=\"2\">&nbsp;<\/font><br \/>\n<font face=\"Arial\" size=\"2\">\u2018Ogive Pencil Point BX-265 trim operations utilizing the tool will be continuing today,\u2019&nbsp;noted Thursday\u2019s ET-124&nbsp;repair&nbsp;presentation.&nbsp;\u2018Lockheed Martin is currently evaluating some areas of low foam in the closeout.\u2019<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">The machine trim was performed on the pencil sharpener area on Wednesday, where it was noticed that several large patches around the top of the LO2 tank appeared to be undersprayed.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font> <\/p>\n<p><font face=\"Arial\" size=\"2\">Images show the trim was successful. However,&nbsp;observations showed that some of the&nbsp;\u2018smoothed\u2019 down areas in question had&nbsp;what appeared to&nbsp;be dips, which are the&nbsp;areas where Lockheed Martin engineers are evaluating a course of action, which could include flying as-is. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Other options include another trim operation, then respraying the cone area. The evaluations include how the area will react with the thermal issues associated with loading the tank with super cold propellants, and aerodynamic issues with the tank during ascent<\/font><font face=\"Arial\" size=\"2\">.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Lockheed Martin today decided to trim down some areas of the tank today, and more is expected to be trimmed on Friday, in what is a delicate operation. The effort is be carried out slowely as to ensure workers do not remove too much foam from the areas.<\/p>\n<p>NASA managers made no reference to the low foam issue during a press conference today, despite the issue being documented over the past two days on NASA presentations.<\/p>\n<p>However, the issue appears to be within tolerances for a final trim, with the confirmation of rollout on the 16th \u2013 or maybe even the 15th \u2013 being noted by shuttle manager Wayne Hale.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lockheed Martin engineers have evaluated what was being described as \u201clow foam\u201d on the closeout of repairs on the nose cone of ET-124. The hail damaged tank is undergoing Ogive Pencil Point BX-265 (foam) trim operations during these final stages of completing the requirements for rollout. However, Atlantis will head to Pad 39A on the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41726","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41726"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41726"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41726\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}