{"id":41727,"date":"2007-05-08T17:35:15","date_gmt":"2007-05-08T09:35:15","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/t-one-month-atlantis-on-track-for-rollout-next-week\/"},"modified":"2007-05-08T17:35:15","modified_gmt":"2007-05-08T09:35:15","slug":"t-one-month-atlantis-on-track-for-rollout-next-week","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/t-one-month-atlantis-on-track-for-rollout-next-week\/","title":{"rendered":"T-One Month: Atlantis on track for rollout next week"},"content":{"rendered":"<p>NASA managers have noted their confidence that Atlantis and her repaired External Tank will be ready to rollout back to launch pad 39A next week.\n<\/p>\n<p>  All three of her main engines have been reinstalled, and the hail damaged tank is undergoing final assessments prior to the removal of platforms and scaffolding, with only a few minor engineering problems remaining prior to rollout.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;VAB Flow**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><em><font color=\"#e50000\"><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\">Related documentation on L2<\/font><font face=\"Arial\" size=\"2\">: Five major presentations on COPV evaluations. Standup Reports. Daily Processing Ops Reports. Lockheed Martin Schedule Presentations. Daily ATK Processing information. Daily ET Repair Assessment Presentations \u2013 plus more (vast). All the NASA and ATK reports on the train crash, plus vast amount of exclusive photos of the aftermath \u2013 plus more\u2026the ultimate place to follow Shuttle processing.<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**Previous articles related to&nbsp;the ET&nbsp;damage events: <\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 1<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em> \u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 2<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 3<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 4<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 5<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 6<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 7<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 8<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 9<\/em><\/font><em><font face=\"Arial\"><\/font><font size=\"2\"><\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 10<\/font><\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 11<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 12<\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 13<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 14<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 15<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 16**<\/font><\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 17**<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 18<\/font><font color=\"#0000ff\">** \u2013 <font color=\"#0000ff\">Article 19**<\/font><\/font>&nbsp;<font color=\"#000000\">click for <\/font><\/em><em><font face=\"Arial\" size=\"2\">more screenshots of the damage.<\/font><\/em><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">While a full rollout review will take place on the 11th \u2013 followed by a press conference \u2013 a Delta Rollout Review on Friday cleared Atlantis, despite a few niggling issues remaining. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Had Orbiter Delta Rollout Review Friday, with no constraints to rollout,\u2019 noted the latest Shuttle Standup\/Integration report. \u2018Main risk for going forward is COPV (Composite Overwrap Pressure Vessel) rippled liner. Also looking at RMS camera clearance analysis and potential updates for radiator clearance; also accepted risk for OV-104 cracked inserts.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The COPVs are spheres hold helium inside the orbiter, and recent mitigation techniques to avoid these vessels rupturing were undertaken by shuttle management. However, the rippled liner is a new condition to the tanks, although it won\u2019t be a problem for the upcoming STS-117. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Getting two spare COPV tanks ready to replace tanks 6 and 7 on OV-104 (Atlantis) after STS-117,\u2019 added the Standup report. \u2018Boroscope of tank S\/N 2 interior shows area of liner is rippled. Looking into this new condition.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Work is being finalized on ET-124, following what is pretty much the completion of repairs on the tank. Tuesday work included BX-265 (foam) Rough trim, Trim Tool Installation and Trim operations. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">It also appears that the cone of the tank will be given a coat of foam spray, meaning Atlantis will rollout with a new looking tank, as opposed to what has been dubbed a \u2018Dalmatian\u2019 looking tank with the repaired areas in evidence. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018ET intertank defect repairs completed. LH2 shakedown inspection completed,\u2019 added ET-124 repair processing information. \u2018Preparations (occurred at the) weekend for LO2 nose cone spray. Pencil Point BX-265 Spray was completed yesterday.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The re-installation of all three SSMEs (Space Shuttle Main Engines) on Atlantis has now been completed, with the search for RepliSet contamination proving to be a success \u2013 by the very nature of hardly anything of concern being found. All three engines have been given a clean bill of health. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018SSME removals, inspections, and reinstallations continue through next Monday. All 3 engines have been reinstalled. Post-Ops are continuing today (Tuesday), noted processing information on Tuesday. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Installed Engine 1 in OV-104 Friday. Installed Engine 2 Saturday. Engine mounted heat shields installed. Was a well coordinated job with high crew and heavy equipment at KSC. Hopefully doing leak checks Wednesday.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018SSME #1: single particle found during flowliner inspections has been confirmed to be foam. SSME #2 flowliner inspection found 1\/8 in. X 1\/32 in. piece of repliset last week.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">All in all, work on Atlantis and the tank is proving to be a huge success and a testament to the workforce following the disappointment of rollback. A review of the rollout date is likely to approve rollout in about a week\u2019s time, with the NET (No Earlier Than) launch date of June 8 appearing to be a solid target. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Processing on Discovery \u2013 and more importantly for LON (Launch On Need) requirements \u2013&nbsp;Endeavour are proceeding well, without any major issues in work. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">In other shuttle related activities, more positive news is being reported in NASA processing reports on the status of the<font color=\"#0000ff\"> train that crashed whilst transporting Reusable Solid Rocket Motor (RSRM) segments <\/font>to Florida. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018On the RSRM train accident, the two locomotives and pullman car were righted and removed. The three cars with RSRM segments involved in the collapse were put on firm track Thursday night. Forth car (with segment) that rolled on side was righted and moved onto firm track,\u2019 added integration information. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Railroad will work on logistics recommendations for taking these four segments to Utah; probably will take 1 and a half weeks. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The other four segments and exit cone that were not on collapsed track are in Iola, Kansas; loads in data recorder for these taken during collapse did not violate engineering limits. Plan to send these four segments with exit cone to KSC; independent team will assess loads on these.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have noted their confidence that Atlantis and her repaired External Tank will be ready to rollout back to launch pad 39A next week. All three of her main engines have been reinstalled, and the hail damaged tank is undergoing final assessments prior to the removal of platforms and scaffolding, with only a few [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41727","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41727"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41727"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41727\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}