{"id":41733,"date":"2007-05-02T01:58:30","date_gmt":"2007-05-01T17:58:30","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-117-rollout-update-boosters-in-train-accident\/"},"modified":"2007-05-02T01:58:30","modified_gmt":"2007-05-01T17:58:30","slug":"sts-117-rollout-update-boosters-in-train-accident","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-117-rollout-update-boosters-in-train-accident\/","title":{"rendered":"STS-117 rollout update \u2013  Boosters in train accident"},"content":{"rendered":"<p>The rollout of Atlantis and her repaired External Tank is likely to take place on the 16th of this month, following the latest ET-124 repair estimates. Engineers are also half way through the process of removing Atlantis\u2019 main engines for inspection.\n<\/p>\n<p>  Meanwhile, booster segments \u2013 set to fly on a future mission \u2013 were involved in a train derailment while en-route to the Kennedy Space Center (KSC). The train is now back on the tracks and heading to Florida.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117&nbsp;VAB Flow**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><em><font color=\"#e50000\"><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\">Related documentation on L2<\/font><font face=\"Arial\" size=\"2\">: Standup Reports. Daily Processing Ops Reports. Lockheed Martin Schedule Presentations. Daily ATK Processing information. Daily ET Repair Assessment Presentations \u2013 plus more (vast).<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**Previous articles related to&nbsp;the ET&nbsp;damage events: <\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 1<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em> \u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 2<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 3<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 4<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 5<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 6<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 7<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 8<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 9<\/em><\/font><em><font face=\"Arial\"><\/font><font size=\"2\"><\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 10<\/font><\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 11<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 12<\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 13<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 14<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 15<\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 16**<\/font><\/font>&nbsp;\u2013 <font color=\"#0000ff\">Article 17**<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 18<\/font><font color=\"#0000ff\">**<\/font> <font color=\"#000000\">click for <\/font><\/em><em><font face=\"Arial\" size=\"2\">more screenshots of the damage.<\/font><\/em><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">While Discovery and Endeavour enjoy smooth processing flows, the main concentration of work is being held inside the huge Vehicle Assembly Building (VAB), where continued work is being conducted on the hail damaged ET-124. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Lockheed Martin schedule shows four days for ogive repair sprays, followed by shakedown inspections, another two days to reconfigure the platforms for pencil point area sprays, then will reconfigure and pull remainder of platforms back for rollout,\u2019 noted Monday\u2019s Shuttle Standup\/Integration report. \u2018This appears to lay out to May 16th rollout to pad.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">A May 16th rollout will leave only two days of pad contingency remaining in the current launch target of June 8. A review of the rollout date will take place on May 11, although the workforce received more praise from&nbsp;NASA shuttle management for their efforts thus far.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Work on the tank is extensive, with inspections on work that has been completed being undertaken at the same time as the final areas of repairs are being finished up. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u201977 PDL Pour areas had the Conathane applied and the molds installed Monday night,\u2019 added Tuesday\u2019s Launch Operations report. \u2018The PDL application will be completed this morning and then trim work will begin on 1st shift today.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Additional ET Foam Hail Damage: 1 PDL Pour area had Conathane applied and molds were installed last night. The PDL application will be completed this morning and trim work will begin on 1st shift today.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=20551\" width=\"187\" align=\"left\" vspace=\"5\" border=\"0\/\">Removal of Atlantis\u2019 main engines (SSMEs) is ongoing, with SSME 2 removed yesterday and placed into the VAB transfer aisle before being moved to the Kennedy Space Center (KSC) engine shop. The same process is being carried out today on SSME 3. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The removal is to allow detailed inspections for potential RepliSet contamination. The same process was carried out on Endeavour last week, with the delay to Atlantis\u2019 inspections being caused by clearance issues between the engines and scaffolding \u2013 which was removed on Sunday \u2013 that was erected for ET repairs. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018SSME removal\/reinstallation operations began yesterday with SSME #2 demate\/lowering. SSME #3 demate\/lowering is in work at this time. Engine removal\/flowliner inspection work continues through next week.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"139\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=20550\" width=\"189\" align=\"left\" vspace=\"5\" border=\"0\/\">Also now inside the VAB, ET-117&nbsp;has being placed into HighBay 2W, following its removal from an extended stay inside the barge that transported it from MAF last month. ET-117 will fly with Endeavour on STS-118. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">At one point, the tank looked like it would replace ET-124, before managers decided they could ably repair the primary tank for Atlantis\u2019 mission. However, should inspections find anything serious, the tank swap could still be carried out. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, at the Michoud Assembly Facility (MAF), the final External Tank has begun to take shape, as the New Orleans plant begins ET-138 construction. The tank is not manifested with any of the future shuttle missions, and will be used as a back up tank, should it be required. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The panel is the first of 12 that will eventually construct the Liquid Hydrogen Tank aft dome for the final tank, ET-138,\u2019 noted Michoud information. \u2018The tank will be \u2018partially-built,\u2019 providing NASA with an important resource should it be needed to support a future, unplanned shuttle mission.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Also inside the VAB this month will be the segments that make up the boosters for Endeavour\u2019s STS-118 mission. Reusable Solid Rocket Motor set (RSRM-97) and Booster Integration set (BI-130) will begin their build up in the VAB from the middle of May.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However,&nbsp;a future&nbsp;set of booster&nbsp;segments&nbsp;were involved in a train accident whilst en-route to KSC, as the train they were travelling on derailed late last week. No damage was noted to the booster segments, which were built at ATK\u2019s plant in Utar.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018There was a railroad train incident on a shipment of eight segments and two exit cones on their way to KSC. The train was travelling east to Kansas at about 9:00 a.m. CDT Friday morning when it experienced derailment of a few of the wheels on three of the segment cars on the aft end of the train,\u2019 noted this week\u2019s Standup report.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The segments involved were the&nbsp;six remaining RSRM 98 center and forward segments (STS-120)&nbsp;and RSRM 99 aft segments (STS-122).<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>\u2018The train was travelling about 20 mph when this happened, and was brought to a stop safely about 3\/4 miles down the track. There are eight axles on each railroad car, with two wheels per axle. Two axles are tied together into a truck, and two trucks are tied together with a span bolster. On the third and fourth cars from the aft end, the second axle on each car had one wheel inside and one wheel outside the track. <\/p>\n<p>\u2018Visual evidence indicated one more axle on the front end of each car had gone off and back on the track. The last car on the train had two axles that had gone off and then back on the track. This was a fairly simple re-railment procedure to the railroad personnel, but UP flew in their elite response team (called \u2018Go\u2019 team) within 2 1\/2 hours. <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The team did their assessment, and the re-railment was completed within minutes of starting. There was some brake line (hose and mechanical structure) damage. The train continued at slow speed 60 miles to Salina, Kansas. The railroad flew in their top mechanics and performed the repairs Sunday. The train was back on the road Sunday night and is currently in the Arkansas\/Louisiana area.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The rollout of Atlantis and her repaired External Tank is likely to take place on the 16th of this month, following the latest ET-124 repair estimates. Engineers are also half way through the process of removing Atlantis\u2019 main engines for inspection. Meanwhile, booster segments \u2013 set to fly on a future mission \u2013 were involved [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41733","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41733"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41733"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41733\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}