{"id":41760,"date":"2007-03-30T17:48:02","date_gmt":"2007-03-30T09:48:02","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-managers-praise-tank-repair-effort-clarify-flight-schedule\/"},"modified":"2007-03-30T17:48:02","modified_gmt":"2007-03-30T09:48:02","slug":"nasa-managers-praise-tank-repair-effort-clarify-flight-schedule","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-managers-praise-tank-repair-effort-clarify-flight-schedule\/","title":{"rendered":"NASA managers praise tank repair effort \u2013 clarify flight schedule"},"content":{"rendered":"<p>As NASA managers head towards the April 10th decision on which External Tank Atlantis will fly with on STS-117, the ongoing ET repair effort has received heaps of praise from both Shuttle manager Wayne Hale and Bill Gerstenmaier, NASA associate administrator for space operations.\n<\/p>\n<p>  Gerstenmaier also noted the changes to the upcoming launch schedule will be clarified around the same time as the tank decision, although that meeting has been deferred until April 16.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><font color=\"#0000ff\"><em>&nbsp;<\/em><em>**<\/em><\/font><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117 PAD Flow**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><em><font color=\"#e50000\"><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\">Related documentation on L2<\/font><font face=\"Arial\" size=\"2\">: Major STS Flight Schedule Changes (New FAWGs) \u2013 March 27 \u2013 NASA White Paper on Manifest Changes \u2013 March 27 \u2013 Shuttle Flight Preparation Status Charts to STS-124 \u2013 March 27. ET Repair Documentation \u2013 from start of, to end of, March.<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**Previous articles related to&nbsp;the ET&nbsp;damage events: <\/font><\/em><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 1<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em> \u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 2<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 3<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 4<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 5<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 6<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 7<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 8<\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>&nbsp;\u2013 <\/em><\/font><font face=\"Arial\" color=\"#0000ff\" size=\"2\"><em>Article 9<\/em><\/font><em><font face=\"Arial\"><\/font><font size=\"2\"><\/font><font color=\"#0000ff\">&nbsp;\u2013 <font color=\"#0000ff\">Article 10<\/font><\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 11<\/font><font color=\"#0000ff\">**<\/font>&nbsp;Click for <\/em><em><font face=\"Arial\" size=\"2\">more screenshots of the damage.<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">The amount of resources being concentrated on United Space Alliance and Lockheed Martin efforts to repair ET-124 back to flight status is epitomized by the huge amounts of daily assessment documentation, as engineers continue with the option of trying to save the tank from having to be shipped back to the Michoud Assembly Facility (MAF). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Those efforts were praised by Gerstenmaier, when he was asked for a status update by Senator Bill Nelson at Wednesday\u2019s \u2018Transitioning to a Next Generation Human Space Flight System\u2019 hearing at the US Senate.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018This is one of the best activities I\u2019ve ever seen in the human spaceflight area,\u2019 he noted. \u2018We have Lockheed Martin \u2013 who manufactures the tank for us, and the United Space Alliance \u2013 who do the processing at the Cape. Those two contactor organizations are working together better than I\u2019ve seen two contactor organizations work. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The teaming, the spirit, and the cooperation of the folks working on this tank is phenomenal. They are passing engineering data back and forth, they are making progress every day on repairing the tank and they are doing just a great job. They are actually mocking up the spray area in New Orleans, so that technicians can practise what they\u2019ll be doing back in Florida to finish up and complete.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Those mock tests at MAF relate to the \u2018non standard\u2019 repair areas of the tank, ensuring the processes and techniques are mapped out for the technicians inside the Vehicle Assembly Building (VAB). The ability to successfully repair those areas of the tank is one of the key factors on whether ET-124 will fly with Atlantis on STS-117. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Also adding to the positive progression with repairs, Wayne Hale made a point of praising the repair effort, noting he was \u2018extremely pleased with the hard work\u2019 from all those involved, while emphasising that the ultimate aim is ensuring STS-117 is returned to the status of being safe to fly, but only when that point has been reached. An obvious statement, but one that once again makes the point that the media generated phrase of \u2018schedule pressure\u2019 will not determine launch dates. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Our goal is to provide a good, flyable vehicle. We want to ensure it is safe, and we will fly it when it is ready,\u2019 said Hale. \u2018We would all like to see it fly as early as is practical, but our number one goal is to ensure it is safe when it flies.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">While the process of assessment and medium level repairs have proceeded without any major problem being noted, the decision on whether to stick with ET-124, or demate and re-stack with the soon-to-arrive ET-117, is still in the balance. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We still don\u2019t know which tank we\u2019ll use for STS-117,\u2019 added Gerst. \u2018If we need to, we can switch the tanks \u2013 with the new tank due to ship from New Orleans either on Sunday or Monday. It will be in Florida several days earlier than planned \u2013 the Lockheed team have done a great job.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font> <\/p>\n<p><font face=\"Arial\" size=\"2\">When Atlantis flies won\u2019t be known for a few weeks, with the ultimate decision on STS-117\u2019s launch target relating to if ET-124 can be repaired to the point of safe flight \u2013 which would possibly allow for a mid-May launch, or if NASA decides to swap with ET-124 \u2013 which would push STS-117 into June. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We\u2019ll make a decision around April 10 on which tank we\u2019ll use. We can potentially still make the May launch window, if we use this tank. If we don\u2019t, we\u2019ll be in the June timeframe. Each one of those launch window allows us to fly out the rest of the schedule for Space Station assembly. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>\u2018It turns out by the end of 2008, first part of 2009 that the ripple of this delay will have rippled out and we\u2019ll be back on track again. So we will still have the same margin we have today, we don\u2019t see this as a big impact downstream. Progress is going well and it\u2019s a tribute to this workforce. They understand the work that needs to be done.\u2019<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The fallout from the delay to STS-117 will change the NET (No Earlier Than) launch dates for a number of flights during 2007 and 2008, although this won\u2019t place any undue pressure on the 2010 retirement date for the shuttle. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018There will be some slippage through the rest of 2007, and a little bit into 2008. By the end of 2008, early 2009, that slippage will have pretty much of damped out,\u2019 added Gerst. \u2018You\u2019ll see the flights move around a little bit, and we have a manifest option out there now that moves a whole bunch of flights around.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">That manifest option, as revealed by this site, is \u2013 as always stated \u2013 a fluid schedule that is used for processing and planning purposes, rather than setting actual launch dates in stone. However, it should also be noted, that historically, such manifests tend to be the most accurate schedule documentation. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018That\u2019s just a planning manifest,\u2019 Gerst noted to Senator Nelson. \u2018So if you see that on a website somewhere that somebody has posted it looks like everything in the world has moved. It really hasn\u2019t, this is a planning exercise that we\u2019ve put out to the team to look at to try and find an optimum way\u2026to deal with this complicated assembly sequence, because it not only relies on the shuttle being ready to fly, but we need to see what activities need to be completed on board the space station. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Sometimes the Space Station activities pace the shuttle flight, so in some cases the shuttle might be ready to fly before the space station is ready to receive it, so it\u2019s a pretty integrated schedule that\u2019s more complicated that we\u2019ve had in the past. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018So we put this planning manifest out for the folks to look at. It (gives the appearance) that we\u2019ve more unstable that we really are, but the truth is it\u2019s just a planning manifest, and we\u2019ll have around April 10th or so a plan laid out for the rest of the year.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As NASA managers head towards the April 10th decision on which External Tank Atlantis will fly with on STS-117, the ongoing ET repair effort has received heaps of praise from both Shuttle manager Wayne Hale and Bill Gerstenmaier, NASA associate administrator for space operations. Gerstenmaier also noted the changes to the upcoming launch schedule will [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41760","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41760"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41760"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41760\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}