{"id":41763,"date":"2007-03-27T00:03:32","date_gmt":"2007-03-26T16:03:32","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-may-change-orbiters-for-manifest-solution\/"},"modified":"2007-03-27T00:03:32","modified_gmt":"2007-03-26T16:03:32","slug":"nasa-may-change-orbiters-for-manifest-solution","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-may-change-orbiters-for-manifest-solution\/","title":{"rendered":"NASA may change orbiters for manifest solution"},"content":{"rendered":"<p>NASA managers have started to evaluate manifest options to mitigate schedule issues, following the continuing re-alignment of STS-117\u2019s launch date targets due to the ongoing repairs to ET-124.\n<\/p>\n<p>  Managers are assessing the option of switching orbiters on three upcoming missions, STS-120 \u2013 to Discovery, STS-122 \u2013 to Atlantis, and STS-124 \u2013 to Discovery, in order to allow the possibility of four 2007 missions, even if STS-117 is delayed until June.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation \u2013 not available anywhere else on the public net \u2013&nbsp;are&nbsp;<\/em><em><font color=\"#0000ff\">available to download&nbsp;on L2<\/font><\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Atlantis&nbsp;STS-117 \u2013&nbsp; ET&nbsp;repair latest**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font color=\"#0000ff\">**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">Related Notes and Presentations on L2, including: New FAWG Manifests \u2013 Post ET Damage. Daily Ops Reports. NASA and Lockheed Martin&nbsp;Presentations on the ET damage (VAST AND DAILY), plus new images and&nbsp;many downloadable&nbsp;presentations.&nbsp;ET Manifest (Lockheed Martin)&nbsp;ET-117 Production&nbsp;Milestone&nbsp;Presentations, \u2018through to\u2019 STS-124 Baseline Mission Presentations,&nbsp;plus more,<\/font><\/em><em>&nbsp;available to download on L2.<\/em><\/p>\n<p>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>**Previous articles on the damage events: <font color=\"#0000ff\">Article 1<\/font><font color=\"#0000ff\"> \u2013 <\/font><font color=\"#0000ff\">Article 2<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 3<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 4<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 5<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 6<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 7<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 8<\/font><font color=\"#0000ff\">&nbsp;\u2013 <\/font><font color=\"#0000ff\">Article 9<\/font><font color=\"#0000ff\">**&nbsp;<\/font>Click for more screenshots of the damage.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em><font color=\"#0000ff\">**FREE 100mb video of the NASA ET Damage&nbsp;press briefing**<\/font>&nbsp;\u2013 required to login to forum.<\/em><\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">Currently, two windows are on the table for Atlantis, starting with NET (No Earlier Than) May 11 \u2013 in a launch window extending through to May 20 \u2013 and NET June 17, should NASA decide next month that they will demate Atlantis and re-stack with ET-117. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018SSP (Space Shuttle Program) is still pursuing ET repairs that may support launch in the May 11-20 time frame,\u2019 noted Shuttle manager Paul Hill \u2013 recently selected as the Deputy of the Mission Operations Directorate (MOD). <\/font><\/p>\n<p>\u2018The charts (of the current) repair schedule show a STS-117 NET May 23, but that assumes all ~1600 sites must be repaired with standard PDL foam. The charts then go on to explain options to reduce that time by using larger\/non-standard repairs and flying some as-is. Thus May 11 is still a date SSP has asked us to work towards.<\/p>\n<p>May 23rd is not a viable launch target, due to the solar beta cut out, which ranges from May 21 to June 7.<\/p>\n<p>\u2018The PRCB (Program Control Requirements Board) will reconvene April 10 to make a final decision on flying a repaired ET-124 or swapping to ET-117. The intent is to have a complete set of risk analyses based on flight history and new tests to support that decision. <\/p>\n<p>\u2018If we swap to ET-117, STS-117 is estimated NET June 17.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font color=\"#0000ff\" size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">While Shuttle manager Wayne Hale noted last week that the interruption to the current manifest would be dissolved in about a year\u2019s time, actions are already being evaluated on ensuring the 2007 schedule allows for four missions. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018After manifest discussions with John Shannon and Mike Suffredini this morning the programs have agreed to float a manifest CR to ASSESS new launch dates which involves changing Orbiter assignments for STS-120\/10A (was Atlantis, assess moving to Discovery) STS-122\/1E (was Discovery, assess moving to Atlantis) and STS-124\/1J (was Atlantis, assess moving to Discovery),\u2019 noted a memo acquired by this site.<\/font><\/p>\n<p>\u2018This option, if implemented, allows for 4 flights this year vs. 3, and basically allows for us to start flying the manifest ~ 2 to 3 months sooner, which is extremely important to both programs if we\u2019re to meet the manifest by 9\/2010.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\">Swapping the orbiters is no easy task, with the need to refine the already baselined payloads for the respective orbiters. An example was already provided in the case of STS-122, which will see its mission reduced by two days, losing one of its spacewalks in the process.<\/font><\/p>\n<p>\u2018Atlantis does not, and is not planned to receive the SSPTS (Station-Shuttle Power Transfer System) mod, so STS-122\/1E will lose 2 days and 1 EVA from the current mission timeline, at least. The CR will allow the community to assess this very complicated change and be prepared to make a decision is in around 3 weeks.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">Minor troubleshooting is being carried out on Atlantis in the meantime, although such efforts are utilizing the opportunity of allowed time, as she remains attached to the damaged tank. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Initial repair efforts on ET-124 are proceeding without any major \u2018poke outs\u2019 \u2013 while assessments are still being carried out on the \u2018non standard\u2019 areas of the tank, ahead of the April 10 decision day. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The 30 sampling PDL pours are complete. Trim is in work. Assessment will be part of trim operations. Trim ops were completed on Friday. This completes repairs on the damage sample areas,\u2019 noted Monday\u2019s Launch Ops report. \u2018Implemented marking of the \u2018no ice\u2019 zone in preps for repairs\/sanding. PDL repair paper streamlining process was completed over the weekend. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018MAF (Michoud Assembly Facility) is assessing database against minimum thicknesses. The plan is to identify the areas that exceed the minimum thickness requirement. The minimum thickness violations will be further assessed by zone for combination with other adjacent minimum thickness violations and\/or against those adjacent items that only require sand and blend. <\/font><\/p>\n<p>\u2018This data will allow us to develop a repair strategy to maintain as much good NCFI as possible while minimizing repairs and KSC processing timeline. Our data assessment will attempt to identify any individual repairs that could be performed where it makes sense, i.e. where they are isolated or have no risk to aforementioned criteria.<\/p>\n<p>LO2 Tank Defect Repairs \u2013 Received (notification) from MAF delineating 89 new locations for PDL repair. Disposition is in place to perform these repairs and they will be in-work this week.\u2019<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have started to evaluate manifest options to mitigate schedule issues, following the continuing re-alignment of STS-117\u2019s launch date targets due to the ongoing repairs to ET-124. Managers are assessing the option of switching orbiters on three upcoming missions, STS-120 \u2013 to Discovery, STS-122 \u2013 to Atlantis, and STS-124 \u2013 to Discovery, in order [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41763","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41763"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41763"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41763\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}