{"id":41767,"date":"2007-03-22T00:23:20","date_gmt":"2007-03-21T16:23:20","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-117s-new-launch-date-undecided-et-summit\/"},"modified":"2007-03-22T00:23:20","modified_gmt":"2007-03-21T16:23:20","slug":"sts-117s-new-launch-date-undecided-et-summit","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-117s-new-launch-date-undecided-et-summit\/","title":{"rendered":"STS-117\u2019s new launch date undecided \u2013 ET summit"},"content":{"rendered":"<p>NASA and contractor engineers\/managers have met to evaluate the latest data and presentations relating to the repair of ET-124 \u2013 which was damaged by a hail storm last month.\n<\/p>\n<p>  The meeting evaluated the problems related to the non-standard repairs required on the tank, and the subsequent timeline of returning the stack to flight status \u2013 although a new launch date wasn\u2019t decided, and won\u2019t be until April 10 when a final decision will be taken on if to fly with ET-124 or swap to ET-117.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation \u2013 not available anywhere else on the public net \u2013&nbsp;are&nbsp;<\/em><em>available to download&nbsp;on L2<\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 \u2013&nbsp; ET&nbsp;repair latest**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">Related Notes and Presentations on L2, including: New FAWG Manifests \u2013 Post ET Damage. Daily Ops Reports. NASA and Lockheed Martin&nbsp;Presentations on the ET damage (VAST AND DAILY), plus new images and&nbsp;many downloadable&nbsp;presentations.&nbsp;ET Manifest (Lockheed Martin)&nbsp;ET-117 Production&nbsp;Milestone&nbsp;Presentations, \u2018through to\u2019 STS-124 Baseline Mission Presentations,&nbsp;plus more,<\/font><\/em><em>&nbsp;available to download on L2.<\/em><\/p>\n<p>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>**Previous articles on the damage events: Article 1 \u2013 Article 2&nbsp;\u2013 Article 3&nbsp;\u2013 Article 4&nbsp;\u2013 Article 5&nbsp;\u2013 Article 6&nbsp;\u2013 Article 7&nbsp;\u2013 Article 8**&nbsp;Click for more screenshots of the damage.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>**FREE 100mb video of the NASA ET Damage&nbsp;press briefing**&nbsp;\u2013 required to login to forum.<\/em><\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><u>Article during the Summit from this morning \u2013 confirmed post media call:<br \/><\/u><\/em><br \/>While most documentation currently points to the NET (No Earlier Than) May 11 launch target, information that is being presented to the summit points towards the requirement for more data, before a new schedule can be confidently produced. However, the opportunity to launch in April isn\u2019t possible \u2013 as reported by this site two weeks ago.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018On Wednesday, they will discuss ET repair efforts,\u2019 summarized shuttle manager Wayne Hale\u2019s notes on the latest stand-up\/integration report. \u2018Other projects affected by hail should attend and summarize where we are.<\/font><\/p>\n<p>\u2018At the PRCB (Program Control Requirements Board), (we) will have detailed review of the appropriation of the baseline plan as if were going to use ET-124, with on the order of 45 days of repair work in VAB, and proceeding to launch sometime in early May. A series of TIMs (Technical Interchange Meetings) have provided the preliminary technical discussion on the repair techniques. <\/p>\n<p><font face=\"Arial\" size=\"2\">NASA administrator Mike Griffin and assistant administrator Bill Gerstenmaier called for the senior management level review of ET-124 repairs, for the purpose of finalizing the approach for STS-117, with the options ranging from proceeding with repairs \u2013 currently being carried out on the tank, or to swap with ET-117 \u2013 which is set to arrive at KSC next month. A tank swap \u2013 classed as unlikely at this stage \u2013 would delay STS-117 to June. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We are faced with the discussion of whether will we be able to repair this tank,\u2019 added Hale\u2019s notes. \u2018Will we get to a point where we can repair the tank and make the launch window, or do we need to move to the next tank when it arrives at KSC, take ET-124 offline, do longer duration repairs, and proceed to a late June launch window? <\/font><\/p>\n<p>\u2018The launch window is still in work. This will be part of the discussion with the senior level management. Really have to get story together to present to senior level management.\u2019<\/p>\n<p>Hopes that the data would be complete to the point where a definitive plan was available for a new launch date decision was dismissed by a NASA HQ memo, which noted: \u2018The repair work is proceeding on the STS-117 external tank. There will be a briefing today to senior agency management, to discuss the forward work plan. There will be no decisions made on the new launch date during this meeting.\u2019 <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Also, a series of presentations that are being viewed by today\u2019s summit point to a range of opinions on whether ET-124 is repairable to the level required for safe flight.<br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018There will be a repair risk impact to STS-117, the extent of which is yet to be determined,\u2019 claimed the Repair Risk Assessment Summary presentation. \u2018Conditional probabilities (risk level as a function of time) are calculated for repairs because of the unknown release time. The failure mechanism(s) have not been determined to the point of accurately characterizing the release time or amount of debris liberated<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The highest repair risk is from repairs made to the LO2 tank. The greater the mass and release rate, the higher the risk. Depending on the mass size, a single release from the LO2 tank can have very high risk level if the repair liberates at the worst possible time.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Another presentation, NASA Engineering and Safety Center (NESC)\u2019s STS-117 Hail Damage Repair Assessment Project Status, called for more tests to be carried out on ET-124, for the purpose of confirming non-standard repairs can be completed successfully.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Recommendations: Perform additional crushed foam testing on panels with simulated hail damage. Use (special) panels sprayed with foam thickness representative of high damage area away from the nose cone BX-265 repair<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Impact panels in such a manner as to simulate STS-117 hail damage. Inspect and repair panels using the same techniques, processes and criteria. Expose panels to hot gas ascent heating conditions to assess the potential for foam loss.\u2019<\/font><\/p>\n<p>NASA is hosting a media call this evening to discuss the status of the repair and assessment effort, although at this stage \u2013 with the meeting still ongoing \u2013 it appears managers will note they need to continue their assessments.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA and contractor engineers\/managers have met to evaluate the latest data and presentations relating to the repair of ET-124 \u2013 which was damaged by a hail storm last month. The meeting evaluated the problems related to the non-standard repairs required on the tank, and the subsequent timeline of returning the stack to flight status \u2013 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41767","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41767"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41767"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41767\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}