{"id":41770,"date":"2007-03-17T20:05:26","date_gmt":"2007-03-17T12:05:26","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-green-light-lar-capability-for-hubble-mission\/"},"modified":"2007-03-17T20:05:26","modified_gmt":"2007-03-17T12:05:26","slug":"nasa-green-light-lar-capability-for-hubble-mission","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-green-light-lar-capability-for-hubble-mission\/","title":{"rendered":"NASA green light LAR capability for Hubble mission"},"content":{"rendered":"<p>The Large Area Repair (LAR) capability has been approved for development by NASA\u2019s PRCB (Program Control Requirements Board), receiving $4m of funding.\n<\/p>\n<p>  Documentation now confirms that the capability is targeted for STS-125 \u2013 Atlantis\u2019 mission to service the Hubble Space Telescope \u2013 giving the crew the possibility of covering a large breach in the orbiter\u2019s TPS (Thermal Protection System), should damage occur during the mission.\n<\/p>\n<p><em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em>available to download&nbsp;on L2<\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 PAD Flow**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><font face=\"Arial\"><\/font><font size=\"2\"><em><br \/><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"134\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=17438\" width=\"133\" align=\"left\" vspace=\"5\" border=\"0\/\">The panel, which can be shaped to the curve of the leading edge of the orbiter\u2019s wings, would be fastened over the breach with screws, after an astronaut had drilled holes into the Reinforced Carbon Carbon (RCC) panel. It is also capable of being a patch for the nose cap of the orbiter.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The 12\u201d x 12\u201d patch is large enough to cover a sizable breach in the TPS, which currently would result in a LON (Launch On Need) requirement being called, with the crew taking up the safe haven option at the International Space Station (ISS), before being \u2018rescued\u2019 by another orbiter. STS-125 is the only flight on the remaining manifest not to have the option of safe haven at the ISS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"69\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=19374\" width=\"140\" align=\"left\" vspace=\"5\" border=\"0\/\">As originally revealed by this site in January, a 33 page presentation didn\u2019t directly link this capability to STS-125\u2019s mission to service the Hubble Space Telescope. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>However, a second 12 page presentation dated March 15 clearly shows the capability is following a timeline for being ready to fly on STS-125. <em>Both presentations available to download on L2.<\/em><\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Recommendation: <\/font><font face=\"Arial\" size=\"2\">Approve. $4.14M FY07-08 Cost Plan for RCC Large Area Repair Project. Project content for review of design, materials properties evaluations, and PDR-level maturity of EVA Tools.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p>The next major step involved with bringing LAR into the repair manifest is to procure multiple batches of LAR flexible ceramic sheet, SAR covers, C\/SiC threaded fasteners and NOAX sealant \u2013 needed to support arcjet tests and thermal\/mechanical tests.<\/p>\n<p><font face=\"Arial\" size=\"2\">The increased capability is an improvement on the current \u2018plug\u2019 repair, which would be used on small holes, but not those which could occur around interfaces \u2013 such as T-seals. LAR already has costings and a level of developmental maturity in place to allow this concept to move forward. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>The LAR patch is flexible, allowing for the covering of breaches in the wing leading edge, as well as being able to be placed over small holes \u2013 such as MMOD (micrometeoroid\/orbiting debris) impacts \u2013 on the nose cap.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=17437\" width=\"119\" align=\"left\" vspace=\"5\" border=\"0\/\">To install the patch would be no easy task, with spacewalkers being required to drill\/tap holes into the RCC around the damaged location. Fasteners and washers would be needed to help secure the patch in place, before being sealed with NOAX. The tools associated with this capability will also be developed in tandem.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font><font face=\"Arial\" size=\"2\">The capability will only be certified after extensive thermal and mechanical testing, and a two year schedule has been mapped out to ensure that process runs smoothly.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Development will begin immediately, with reviews and associated concepts timelined for June and September, 2007, February and August, 2008. It is not known if the capability will fly on the mission prior to STS-125 \u2013 especially with the manifest showing a slip to the end of 2008 for the mission \u2013 in order to carry out on-orbit certification.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">NASA is looking at a <\/font><u><font color=\"#0000ff\"><\/font><font face=\"Arial\" size=\"2\">salvo of capabilities in case of a worst case scenario<\/font><\/u><font face=\"Arial\" size=\"2\"> debris event with Atlantis, ensuring the unique LON mission that will support STS-125 will only be called when all efforts of repairing the damaged orbiter have failed.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><\/em><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Large Area Repair (LAR) capability has been approved for development by NASA\u2019s PRCB (Program Control Requirements Board), receiving $4m of funding. Documentation now confirms that the capability is targeted for STS-125 \u2013 Atlantis\u2019 mission to service the Hubble Space Telescope \u2013 giving the crew the possibility of covering a large breach in the orbiter\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41770","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41770"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41770"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41770\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}