{"id":41771,"date":"2007-03-16T01:16:44","date_gmt":"2007-03-15T17:16:44","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-lockheed-martin-managers-approve-et-124-repair-plan\/"},"modified":"2007-03-16T01:16:44","modified_gmt":"2007-03-15T17:16:44","slug":"nasa-lockheed-martin-managers-approve-et-124-repair-plan","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-lockheed-martin-managers-approve-et-124-repair-plan\/","title":{"rendered":"NASA\/Lockheed Martin managers approve ET-124 repair plan"},"content":{"rendered":"<p>Repairs proper will begin on Friday for ET-124, following the NASA\/United Space Alliance TIM (Technical Interchange Meeting) on Wednesday, and Lockheed Martin\u2019s presentation to the powerful PRCB (Program Control Requirements Board) meeting on Thursday.\n<\/p>\n<p>  While there\u2019s a long way to go in the process, documentation confirms they will proceed with repairs on ET-124, rather than calling for a change of tank to ET-117, which would have pushed STS-117 to June. A May launch date appears most likely at this stage.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation \u2013 not available anywhere else on the public net \u2013&nbsp;are&nbsp;<\/em><em>available to download&nbsp;on L2<\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 \u2013&nbsp; ET&nbsp;repair latest**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">Related Notes and Presentations on L2, including: New FAWG Manifests \u2013 Post ET Damage. Daily Ops Reports. NASA and Lockheed Martin&nbsp;Presentations on the ET damage (VAST AND DAILY), plus new images and&nbsp;many downloadable&nbsp;presentations.&nbsp;ET Manifest (Lockheed Martin)&nbsp;ET-117 Production&nbsp;Milestone&nbsp;Presentations, \u2018through to\u2019 STS-124 Baseline Mission Presentations,&nbsp;plus more,<\/font><\/em><em>&nbsp;available to download on L2.<\/em><\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>**Previous articles on the damage events: Article 1 \u2013 Article 2&nbsp;\u2013 Article 3&nbsp;\u2013 Article 4&nbsp;\u2013 Article 5&nbsp;\u2013 Article 6&nbsp;\u2013 Article 7**&nbsp;Click for more screenshots of the damage.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>**FREE 100mb video of the NASA ET Damage&nbsp;press briefing**&nbsp;\u2013 required to login to forum.<\/em><\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">Currently, the best estimated launch target for Atlantis remains late April, but planning documentation continues to reference the 45 day repair and certification plan that will be conducted in the VAB, which was outlined as one of the four manifest options for the refined launch date, listed \u2013 in this scenario \u2013 as NET (No Earlier Than)&nbsp;May 11.<\/font><\/p>\n<p>During the&nbsp;referencing of a moisture level requirement on a Thursday United Space Alliance presentation, the 45 day stay in the VAB was once again listed as the current timeline the tank repair flow.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018PLBD Drying: The 45 day VAB stay, coupled with the minimum 22 days required for pad processing, remain within the bounds for PLBD moisture requirements under the current conditions. Updates incorporating actual (past) data with projected 70 percent humidity will be performed each week.\u2019<\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Continued refinement is expected as repairs proceed, and another major meeting has been set for next week (on the 21st) to update the status of the timeline and repairs.<\/font><\/p>\n<p>This meeting is required to further evaluate the \u2018non standard\u2019 repairs on the tank, which involves new foam being sprayed on to some of the damaged areas. Certification efforts will be focused on such repairs to ensure the tank would be safe to fly.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Group generally concurred with proposed methods for hardware assessment and repairs. Existing data, planned testing and demonstration were appropriate to support disposition and flight rationale,\u2019 noted a summary of the TIM meeting, in a PRCB presentation on Thursday.<\/font><\/p>\n<p>\u2018Actions issued to support verification primarily associated with residual risk of undetected crushed foam (ice and TPS debris) and LO2 tank repair flight history assessment \u2013 Includes correlation of STS-96 to STS-117 hail environments and additional assessment of STS-96 performance (debris due to undetected damage \/ ice).\u2019<\/p>\n<p>While a small level of repairs have already started on ET-124 \u2013 including the application of red dye to aid the assessment process and LO2 Ogive Foam<b>\u2013<\/b>trim\/sanding \u2013 the official go-ahead to proceed with full repairs on the tank has been given.<\/p>\n<p>\u2018Team concurred with rationale to proceed with standard repairs (allowed per engineering). Dispositions in work. Repairs possibly starting Friday,\u2019 added the presentation. \u2018Additional data required for approach proposed for non-standard repairs (i.e. forward ogive demonstration \/ verification, damage &lt; 0.25\u201ddeep) and undetected damage.\u2019<\/p>\n<p>This was an important milestone, given the opposing option \u2013 waiting for ET-117 to arrive from the Michoud Assembly Facility (MAF) in April \u2013 would have moved STS-117 to a June launch target.&nbsp;However, this \u201ctank swap\u201d&nbsp;option remains on the table.<\/p>\n<p><font face=\"Arial\" size=\"2\">MAF documentation shows that ET-117 will be ready for shipping at the end of March, for an April 4 arrival at KSC. The next tanks in the flow (ETs 120, 125, 126 and 128) are all on schedule.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Repair evaluation presentations have continued to be produced on a daily basis, as the plan to bring ET-124 back up to an acceptable flight status continue unabated. The latest presentations (Thursday)&nbsp;note an increased area that will be trimmed from the top of the LOX area of the ET, now reaching around 300 degrees of the circumference.<\/font><\/p>\n<p>Further meetings are planned to discuss and evaluate the status of the repair effort, working on both the engineering and technical standpoints, as the assessment process refines the areas of damage that need to be repaired. A further 106 areas of damage were listed on Wednesday. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Senior Management Review scheduled for 3\/21 to review approach for non-standard repairs and acceptance of undetected damage,\u2019 noted the PRCB presentation. \u2018Forward ogive repair technical data review tentatively scheduled for early April (week of 4\/9).<\/font><\/p>\n<p>Meanwhile, repairs on Atlantis\u2019 left wing, which suffered a small amount of damage from the freak hail storm, are almost complete.<\/p>\n<p>\u20186 repairs remain needing repair,\u2019 a United Space Alliance presentation on Thursday listed, which also noted the need for further access requirements. \u2018Need high crew access. Platform installation to commence this week. Work scheduled for next week.\u2019<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Repairs proper will begin on Friday for ET-124, following the NASA\/United Space Alliance TIM (Technical Interchange Meeting) on Wednesday, and Lockheed Martin\u2019s presentation to the powerful PRCB (Program Control Requirements Board) meeting on Thursday. While there\u2019s a long way to go in the process, documentation confirms they will proceed with repairs on ET-124, rather than [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41771","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41771"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41771"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41771\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}