{"id":41776,"date":"2007-03-10T18:29:18","date_gmt":"2007-03-10T10:29:18","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/pad-39bs-transition-hubble-rescue-role-and-ares-future-mapped-out\/"},"modified":"2007-03-10T18:29:18","modified_gmt":"2007-03-10T10:29:18","slug":"pad-39bs-transition-hubble-rescue-role-and-ares-future-mapped-out","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/pad-39bs-transition-hubble-rescue-role-and-ares-future-mapped-out\/","title":{"rendered":"Pad 39B\u2019s transition \u2013 Hubble rescue role and Ares future mapped out"},"content":{"rendered":"<p>NASA managers are continuing to build their roadmap for Pad 39B\u2019s transition to Ares, in tandem with keeping the pad available to host one final shuttle, a shuttle they hope they\u2019ll never have to launch.\n<\/p>\n<p>  Work will be conducted \u2013 including the construction of three giant lightning towers \u2013 around the pad for Ares, prior to the Hubble mission (STS-125), which will launch from 39A with Atlantis, while Discovery is sat on 39B as the rescue shuttle.<br \/>\n<font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"250\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=14333\" width=\"270\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><em><font face=\"Arial\" size=\"2\">Huge amounts of&nbsp;VSE related insider news and presentations \u2013 THE most comprehensive place to follow Ares\/Orion&nbsp;development \u2013&nbsp;are&nbsp;<\/font><\/em><font face=\"Arial\" size=\"2\"><em>available for download on L2<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>. See list at the end of this article.<\/em><\/font><\/p>\n<p><font size=\"2\"><br \/>\n<\/font><\/p>\n<p><font size=\"2\"><\/font><em><font face=\"Arial\" size=\"2\">**ARES I \/ ORION LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**ARES V \/ Mars Transport Vehicle (MTV) LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\"><\/font><\/em>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Plans by Constellation for the 600ft high towers that will protect Ares I from lightning strikes, and a presentation to NASA\u2019s PRCB (Program Requirements Control Board) relating to the Hubble LON (Launch On Need) role, show the attention surrounding Pad 39B only intensified after its \u2018final\u2019 launch, carried out in December 2006 with STS-116. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The decision to approve the final servicing mission to Hubble was not as cut-and-dry a decision as first thought, with the rescue\/LON requirement playing a major role in reducing the risk factor \u2013 documented as a 15 percent reduction in \u2018risk\u2019 \u2013 which satisfied NASA Safety enough to give their blessing for the mission to go ahead.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>This, the fifth mission to Hubble, will also be the Atlantis\u2019 first \u2013 and last \u2013 visit to the space telescope, after Hubble was launched by Discovery. Previous HSMs have been carried out by Endeavour, December 1993, Discovery, February 1997, Discovery, December 1999 and Columbia, March 2002. <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"100\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=4986\" width=\"160\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><font face=\"Arial\" size=\"2\"><em>**Click the image to view the camcorder video recording of HSM mission STS-109\u2019s 2002&nbsp;launch&nbsp;(free&nbsp;to view for&nbsp;forum members)**<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The rescue mission is different to any of the other LON flights, due to Atlantis\u2019 trip into space being the only flight on the remaining shuttle manifest not to have the \u2018safe haven\u2019 of the International Space Station (ISS). Even in \u2018lifeboat\u2019 mode, a rescue orbiter has to reach the stricken craft within a few weeks, meaning the launch would also require accelerating in the flow. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">While a \u2018P-t-P\u2019 (Pad to Pad) option was available, the turnaround was too tight to be viable, leading to NASA deciding to hold back the full handover date of Pad 39B to Constellation until after the stand-down was giving during STS-125. Previously, Constellation were set to get their hands on 39B on April 1 of this year. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"174\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/two.jpg\" width=\"149\" align=\"left\" vspace=\"5\" border=\"0\/\">As outlined in the March 2007 presentation (available on L2), the plan is for the LON orbiter (Discovery) to rollover to High Bay 3 and then out to Pad 39B first. Discovery would sit on the pad while Atlantis was stacked in the opposite High Bay, for rollout two weeks after Discovery. After the stand-down of the LON requirement was giving during STS-125, Discovery would then be transported from Pad B to Pad A and prepared for her primary mission, STS-126.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Pad 39B will not be used for payload integration, given Discovery\u2019s supporting rescue roll would not require any payload for the emergency launch, which allows the pad to undergo a level of Constellation related modifications, so long as they do not interfere with the launch aspects required for Discovery to launch a rescue mission. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Constellation modifications for Pad B implemented prior to HST LON will be conducted on a non-interference basis with Shuttle operations and not affect Shuttle flight safety,\u2019 as noted by the 31 page PRCB presentation.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Such work will include a major change to the appearance of the Pad 39B complex, the construction of three 600ft high Lightning Protection System Towers.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"147\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=18899\" width=\"224\" align=\"left\" vspace=\"5\" border=\"0\/\">Documentation acquired by this site (available on L2)&nbsp;show a huge amount of work has already been undertaken on producing blueprints and guidelines for contractors to use for fabricating these huge structures that will surround the complex. Those blueprints are complete, to the finest detail, as Constellation move towards the actual fabrication of the steel work.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Construction of these towers is expected to start this year, rising out of the ground as huge pylons, with five levels for worker access \u2013 the highest being Level E at 482ft \u2013 rising yet further to a total height of 594ft. Access to the five levels can be reached by stairs or via the \u2018man lift\u2019 that travels up the side of the tower. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Along with the towers \u2013 which it has been proposed will be named after Apollo 1, Challenger and Columbia \u2013 will be nine large downconducters, placed around the complex, which will be anchor points for the massive cables that will stretch across the lightning towers. Foundation work will be the first element of construction to begin, leading to 12 areas of the complex that will undergo major engineering work.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>This work is not specifically required ahead of the 2009 test flight of Ares 1-X (1-X being the new name for the Ares I-1 flight. The second test flight is now renamed to Ares I-Y.). For the test flight, NASA will simply add a longer lightning mast on top of 39B to protect the test vehicle. <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, shuttle operations on Pad 39B will undergo improvements, with the five areas identified as required to be carried out prior to Discovery\u2019s arrival at the pad, these include:<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>\u2018Inspect &amp; Repair Pad B Sound Suppression Water Tank. Inspect and repair corrosion. Previous refurbishment of Pad A tank experience indicates condition of Pad B tank could require extensive repair. Pad B tank has not been inspected since 1995. Inspection results expected in April\/May timeframe.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font><font face=\"Arial\" size=\"2\">\u2018Repair Pad B Main Flame Deflector. Prevent degeneration of refractory concrete and associated FOD by inspecting, patch repairing and performing spot corrosion control.<br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018FSS\/RSS Refurbishment. Perform spot corrosion control on hammerhead crane machine room and support structure \u2013 remove corroded items where feasible. Restore Pad B Concrete Slopes. Perform surface and joint sealing only.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Work on Pad 39B, for the LON flight alone, is expected to cost around $20m, as NASA aim to have the pad in perfect working order, in the highly unlikely and undesired event of having to launch Discovery to rescue to the crew of Atlantis.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/font><em><i>  <\/i><\/em><\/p>\n<p><em><i><\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\">L2 Resources For Ares I, V and Constellation: DAC-1C DDD Vast Slides on Vehicle Design. ATK First Stage Presentation. 39B Lightning Towers Slides.<br \/>DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes). Orion\/CEV Display Layout Presentation (40 pages) \u2013 Feb 5. ATK figures on the 5-Seg Booster weight for CLV \u2013 Feb 2. Weather Shield (Rain Shield) for Orion on the pad \u2013 Feb 1. New Super hi-res images of Ares I \u2013 Feb 1. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric \u2013 Feb 1. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation. <\/font><\/p>\n<p><font size=\"2\"><br \/>\n<\/font><\/p>\n<p><font size=\"2\"><\/font><font face=\"Arial\" size=\"2\">Orion Launch Abort System (LAS) overview presentation \u2013 Jan 16. Major changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. Saturn Twang Test Video for use with Ares I-1R. CLV Umbilical Trade Matrix XLS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Vehicle interfaces for the DAC 1C version of Orion Ares \u2013 Jan 3. Ares I-1R Test Flight Plan (full outline) Presentation. Ares I-1 timeline and modification expanded info. Ares I troubleshooting latest. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. Latest Ares I and Ares V baseline Configuration image and data. CLV DAC-1C (Changes to CLV Upper Stage). <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Ares I-1: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. Constellation news updates. ATK figures on the 5-Seg Booster weight for CLV. <br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"101\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" width=\"180\" align=\"left\" vspace=\"5\" border=\"0\/\">90 Minute Video of Constellation all hands meeting. CLV TIM Meeting Information. CLV\/CaLV Infrastructure, Timelines and Information. Escape System Trade Study Presentation.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Constellation SRR updates. CLV Stick \u2013 Troubleshooting\/Alternatives\/Updates. New CEV Images (include abort mode). Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.<\/font><\/p>\n<p><\/i><\/em><\/p>\n<p><em><i><\/i><\/em><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><\/em><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><font face=\"Arial\" size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><br \/>\n<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers are continuing to build their roadmap for Pad 39B\u2019s transition to Ares, in tandem with keeping the pad available to host one final shuttle, a shuttle they hope they\u2019ll never have to launch. Work will be conducted \u2013 including the construction of three giant lightning towers \u2013 around the pad for Ares, prior [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41776","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41776"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41776"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41776\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}