{"id":41780,"date":"2007-03-04T19:34:33","date_gmt":"2007-03-04T11:34:33","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-back-in-the-vab-six-week-et-repair-plan-drawn-up\/"},"modified":"2007-03-04T19:34:33","modified_gmt":"2007-03-04T11:34:33","slug":"atlantis-back-in-the-vab-six-week-et-repair-plan-drawn-up","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-back-in-the-vab-six-week-et-repair-plan-drawn-up\/","title":{"rendered":"Atlantis back in the VAB \u2013 six week ET repair plan drawn up"},"content":{"rendered":"<p>Shuttle Atlantis has arrived back inside the Vehicle Assembly Building (VAB) Sunday, ahead of repairs to ET-124, which was damaged by a freak hail storm last week.\n<\/p>\n<p>  Platforms and scaffolding has already been erected inside the VAB, in readiness for engineers to take a detailed look at the state of the damaged areas of the STS-117 stack. An initial repair plan has been put into place, with work currently estimated to continue until mid April.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em>available to download&nbsp;on L2<\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 \u2013&nbsp; ROLLBACK\/ET&nbsp;repair exclusives**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>Related Notes and Presentations on L2, including: The NASA and Lockheed Martin&nbsp;notes on the ET damage (VAST), plus new images and serveral presentations.&nbsp;ET Manifest (Lockheed Martin)&nbsp;ET-117 Production&nbsp;Milestone&nbsp;Presentations, plus more,<\/em><em>&nbsp;available to download on L2.<\/em><\/font><\/p>\n<p>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>**Previous articles on the damage events: Article 1 \u2013 Article 2**&nbsp;\u2013 Article 3**&nbsp;Click on the images for more screenshots of the damage.<\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>**FREE 100mb video of the NASA press briefing**&nbsp;\u2013 required to login to forum.<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>The completion of the payload transfer to the PCR was completed on Saturday, as engineers worked towards the rollback of the RSS (Rotating Service Structure) \u2013 usually reserved for the final day of the launch countdown.<\/font><\/p>\n<p>However, despite STS-117 being the smoothest pre-launch flow for many a year, Mother Nature decided to throw a spanner in the works, with an unprecedented hail storm causing over 7000 areas of damage, primarily to the top of the LOX tank on the ET. <\/p>\n<p><font face=\"Arial\" size=\"2\">Now&nbsp;Atlantis is back inside the VAB, she was&nbsp;greeted by special platforms and scaffolding that were erected on Saturday night, with first evaluations to take place on Monday.<\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018LO2 platforms and scaffolding installation will be continuing through Sunday night. Engineering Evaluation Team Pretest Briefing is scheduled for Monday at 0830 hrs (VAB 2K6),\u2019 noted a NASA memo. \u2018Inspections and grid marking will be continuing throughout Monday. Remaining platforms and scaffolding will be in work through Monday night.<\/font><\/p>\n<p>\u2018QC inspections are scheduled to begin on lower platforms (B &amp; D) on 2nd shift Monday. ET-124 Damage Assessment &amp; Repair. Initial planning is complete for platforms, access control, initial engineering inspection, tank grid mapping and quality inspection. Details are currently being worked.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\">Lockheed Martin \u2013 in charge of ET production at the Michoud Assembly Facility (MAF) in New Orleans \u2013 are deeply involved with the repair plan, which they claim won\u2019t be completed until mid April, making&nbsp;the NET (No Earlier Than) April 22 launch target less likely than at the start of May. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">LM, speaking at last Thursday\u2019s PRCB (Program Requirements Control Board) meeting at the Johnson Space Center noted: \u2018Early estimates indicated mid-April completion (subject to change pending results of detailed inspection).\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Adequate inspection requires hands on inspection to determine depth of damage,\u2019 added a LM presentation to the PRCB. \u2018Concern is GO2 seal \u2013 which is expected to take the longest to repair \u2013 land waviness ascent heating \/ re-entry and ice\/TPS debris. Rollback required to adequately assess damage and repair.\u2019<\/font><\/p>\n<p>Repairs will continue after the assessment on a 24 hour, 7 days a week basis, with an initial plan already drawn up by LM\/MAF. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Developed approach for repair of damaged areas\/General Assumptions: Pencil sharpener repair is tall pole, other repair areas performed in parallel with certified USA resources.<\/font><\/p>\n<p>\u2018BX-265 is viable repair, requires mission specific heating rates \u2013 spray similar to PAL ramp spray. Spray extends to nosecone aft skirt. Nose cone remains installed. 24 hr \/ 7 day activities. ICD requirements (waviness) maintained by hand sanding. Michoud resources allocated as required.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"150\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=18598\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\">Work on the top of the ET is not something KSC workers aren\u2019t experienced at carrying out, having previously used the platforms in the VAB to repair ET-100, which caused the last rollback, on STS-96. Workers also replaced the LOX vent and relief valve on ET-119 in a similar fashion.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Processing similar to ET-119 LO2 tank damage,\u2019 added Lockheed Martin\u2019s presentation. \u2018Standard process controls for manual sprays within the critical debris zone (mock-ups required for BX spray). Schedule driven by longest span activity (expected to be GO2 seal land repair).\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Although this repair plan will take up to six weeks, it still remains a better option than having to destack Atlantis from the tank, and wait for the mid April arrival of ET-117, which is currently set to fly with Atlantis on STS-118. Such a worst case scenario would delay STS-117 to the summer.<\/font><\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\"><em>Further articles will follow. Please refer to the live update pages on L2 (for NASA presentations,&nbsp;memos, emails and images) and on Atlantis\u2019 section (open to all)<\/em>.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Shuttle Atlantis has arrived back inside the Vehicle Assembly Building (VAB) Sunday, ahead of repairs to ET-124, which was damaged by a freak hail storm last week. Platforms and scaffolding has already been erected inside the VAB, in readiness for engineers to take a detailed look at the state of the damaged areas of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41780","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41780"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41780"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41780\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41780"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41780"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}