{"id":41789,"date":"2007-02-23T18:17:55","date_gmt":"2007-02-23T10:17:55","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-publishes-rfp-for-ares-i-rollercoaster-escape-system\/"},"modified":"2007-02-23T18:17:55","modified_gmt":"2007-02-23T10:17:55","slug":"nasa-publishes-rfp-for-ares-i-rollercoaster-escape-system","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-publishes-rfp-for-ares-i-rollercoaster-escape-system\/","title":{"rendered":"NASA publishes RFP for Ares I Rollercoaster escape system"},"content":{"rendered":"<p>NASA has published its Request For Proposals (RFP) to potential contractors, ahead of the construction of the rollercoaster Emergency Egress System (EES), which was first revealed by this site last September.\n<\/p>\n<p>  The multi-million dollar system is a fully functioning rail car system that will be used by the astronauts and pad workers in the event of needing to escape the Ares I launch pad (Launch Complex 39B).<br \/>\n<font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"250\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=14333\" width=\"270\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><em><font face=\"Arial\" size=\"2\">Huge amounts of&nbsp;VSE related insider news and presentations \u2013 THE most comprehensive place to follow Ares\/Orion&nbsp;development \u2013&nbsp;are&nbsp;<\/font><\/em><font face=\"Arial\" size=\"2\"><em>available for download on L2<\/em><\/font><font face=\"Arial\"><\/font><font size=\"2\"><em>. See list at the end of this article.<\/em><\/font><\/p>\n<p><font size=\"2\"><br \/>\n<\/font><\/p>\n<p><font size=\"2\"><\/font><em><font face=\"Arial\" size=\"2\">**ARES I \/ ORION LIVE UPDATE PAGES**<\/font><\/em><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**ARES V \/ Mars Transport Vehicle (MTV) LIVE UPDATE PAGES**<\/font><\/em>  <\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**The September Rollercoaster&nbsp;Exclusive&nbsp;Article**<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The RFP \u2013 which can be viewed in full by clicking this link&nbsp;\u2013&nbsp;was finalized by NASA at the start of the year, following the approval of the NASA trade study\u2019s findings that ranked the rollercoaster option as the preferred choice for the Ares I system.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>While the trade study (available to download on L2)&nbsp;provided a variety of graphical representations, the RFP expanded on some of the technical requirements of the EES.<\/p>\n<p>\u2018The Emergency Egress System (EES) is planned to provide a safe mode of emergency egress from the Crew Exploration Vehicle (CEV) to a safe location via a multi-vehicle, rail system for the flight crew, closeout and contingency crews, and ground operations personnel,\u2019 the presentation noted.<\/p>\n<p>\u2018The rail system vehicles will have an entry point located on the crew access level of the yet to be designed Mobile Launcher Tower (MLT; ~367 ft. above ground level) and exit point at a safe location a distance of at least 1200 ft. west of entry point at ground level. The Architect and Engineering (A&amp;E) firm will be responsible for the portion of the EES starting at the vehicle loading area on the MLT crew access level and ending at the safe location. <\/p>\n<p>\u2018The MLT will provide the access to assemble, test, check out, service, transfer to the pad, launch, perform on-pad abort, and post launch securing of the Crew Launch Vehicle\/CEV. The MLT will provide structural support for the vertical or near-vertical travel of the EES rails and rail vehicles as well as contain the loading area.<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"158\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=18428\" width=\"230\" align=\"left\" vspace=\"5\" border=\"0\/\">The requirements also listed the maximum amount of time that will be allotted for all personnel to be transported to an area of safety in the event of a serious problem with the vehicle.<\/font><\/p>\n<p>\u2018The general requirements of the Emergency Egress System include, but are not limited to: the total egress time from CEV hatch to the safe location for 15 able-bodied personnel shall not exceed two minutes (with 30 seconds allotted for transport from the CEV to the EES vehicle loading area),\u2019 added the RFP.<\/p>\n<p>\u2018The system must be able to accommodate up to nine incapacitated crew\/pad personnel to safely egress to the safe location; the system shall be capable of experiencing two (2) failures and still operate; the system shall remain operational after a total launch pad power failure.\u2019<\/p>\n<p>The RFP also noted that the system won\u2019t be automatic at the pad end, requiring one person to initiate the railcars ride down to the bunker, which will automatically stop once it arrives.<\/p>\n<p>Contractors have until April 20th to provide details of their proposals, which will include computer simulations of their concepts.<\/p>\n<p>In other Ares I news, NASA has issued a request for proposal for the Ares I launch vehicle upper stage element. The upper stage proposals are due to Marshall Space Flight Center no later than 1 p.m. CST April 13, 2007. <\/p>\n<p>The contract will provide for the manufacture and assembly of test articles, flight test units, and the operational upper stage elements to support NASA\u2019s flight manifest through 2016. Final manufacturing and assembly will take place at NASA\u2019s Michoud Assembly Facility in Louisiana.<\/p>\n<p>NASA also selected Hamilton Sundstrand Space Systems International Inc. of Rockford, Ill., to design, develop, fabricate, test and deliver engineering models of a turbine pump assembly for the Ares I upper stage thrust vector control subsystem. The cost-plus-fixed-fee contract \u2013 a competitive award \u2013 has a two-year period of performance with a maximum value of $5,009,388.<\/p>\n<p><em><i>  <\/i><\/em><\/p>\n<p><em><i><\/p>\n<p><font face=\"Arial\"><\/font><font size=\"2\">L2 Resources For Ares I, V and Constellation: <br \/>DAC-1C Departure points to DAC-2 Upper Stage Graphcs (Many Changes). Orion\/CEV Display Layout Presentation (40 pages) \u2013 Feb 5. ATK figures on the 5-Seg Booster weight for CLV \u2013 Feb 2. Weather Shield (Rain Shield) for Orion on the pad \u2013 Feb 1. New Super hi-res images of Ares I \u2013 Feb 1. ATK Cutaway graphics of Ares I \u2013 perspective and axonometric \u2013 Feb 1. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. CEV Paracute Assembly System (CPAS) Presentation. <\/font><\/p>\n<p><font size=\"2\"><br \/>\n<\/font><\/p>\n<p><font size=\"2\"><\/font><font face=\"Arial\" size=\"2\">Orion Launch Abort System (LAS) overview presentation \u2013 Jan 16. Major changes to Ares I Upper Stage \u2013 expansive details and data. Ares I\/Orion CxP 72031 Requirements Validation Matrix Information. Saturn Twang Test Video for use with Ares I-1R. CLV Umbilical Trade Matrix XLS. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><\/p>\n<p>Vehicle interfaces for the DAC 1C version of Orion Ares \u2013 Jan 3. Ares I-1R Test Flight Plan (full outline) Presentation. Ares I-1 timeline and modification expanded info. Ares I troubleshooting latest. Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. Latest Ares I and Ares V baseline Configuration image and data. CLV DAC-1C (Changes to CLV Upper Stage). <\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Ares I-1: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. Constellation news updates. ATK figures on the 5-Seg Booster weight for CLV. <br \/><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"101\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" width=\"180\" align=\"left\" vspace=\"5\" border=\"0\/\">90 Minute Video of Constellation all hands meeting. CLV TIM Meeting Information. CLV\/CaLV Infrastructure, Timelines and Information. Escape System Trade Study Presentation.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/>\n<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Constellation SRR updates. CLV Stick \u2013 Troubleshooting\/Alternatives\/Updates. New CEV Images (include abort mode). Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.<\/font><\/p>\n<p><\/i><\/em><\/p>\n<p><em><i><\/i><\/em><em><\/em><\/p>\n<p><em><br \/>\n<\/em><\/p>\n<p><em><\/em><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><font face=\"Arial\" size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><br \/>\n<\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\/\"><\/em><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA has published its Request For Proposals (RFP) to potential contractors, ahead of the construction of the rollercoaster Emergency Egress System (EES), which was first revealed by this site last September. The multi-million dollar system is a fully functioning rail car system that will be used by the astronauts and pad workers in the event [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41789","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41789"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41789"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41789\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}