{"id":41798,"date":"2007-02-14T01:44:56","date_gmt":"2007-02-13T17:44:56","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/atlantis-booster-requires-troubleshooting\/"},"modified":"2007-02-14T01:44:56","modified_gmt":"2007-02-13T17:44:56","slug":"atlantis-booster-requires-troubleshooting","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/atlantis-booster-requires-troubleshooting\/","title":{"rendered":"Atlantis\u2019 booster requires troubleshooting"},"content":{"rendered":"<p>United Space Alliance (USA) engineers are working on a troubleshooting plan, following \u2018erratic\u2019 chamber pressure readings on the right hand SRB (Solid Rocket Booster).\n<\/p>\n<p>  The issue \u2013 which was noted last night without specifics \u2013 is still expected to delay rollout by 24 hours, although engineers are looking at possibly continuing their evaluations on the launch pad. However, two of the IPRs (In Process Reviews) are officially classed as constraints to rollout.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**The most comprehensive collection&nbsp;of STS-117 onwards&nbsp;related presentions and mission documentation are&nbsp;<\/em><em>available to download&nbsp;on L2<\/em><em>&nbsp;<\/em><em>**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 Processsing Flow**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">The issues have stopped the retraction of all the platforms that surround Atlantis and the STS-117 stack inside High Bay 1 of the Vehicle Assembly Building (VAB), with troubleshooting re-starting on Tuesday morning. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Rollout of STS-117 to the Pad may be delayed 24 hrs due to IPR\u00e2\u20ac\u2122s 0062 and 0063 on the RH SRB (see IPR status directly below) \u2013 the schedule is under review,\u2019 noted the expansive Launch Operations report for Tuesday.<\/font><\/p>\n<p>\u2018C Platform retraction was completed yesterday. E Platform retraction is on hold for IPR troubleshooting access requirements in the SRB forward skirt area.<\/p>\n<p>The list of IPRs were listed&nbsp;after the Integrated Space Shuttle Vehicle interface test was conducted on Atlantis and the STS-117 stack.<\/p>\n<p>\u2018IPR-0061: RH (Right Hand) aft separation motor \u2018no-go\u2019 should be \u2018go\u2019 \u2013 will close as GSE cable not mated properly,\u2019 listed the Launch Ops report.&nbsp;<\/p>\n<p>\u2018IPR-0062: Pitch and yaw indicator went from \u2018on\u2019 to \u2018off\u2019 to \u2018on\u2019. The constraint is to S0007 (Launch Countdown). This IPR may be related to IPR-0063. This IPR is a constraint to rollout.<\/p>\n<p>\u2018IPR-0063, The RH SRM (Solid Rocket Motor) chamber pressure went erratic \u2013 could be related to IPR-0062. This IPR is a constraint to stray voltage testing, platform retraction, and rollout. Power up troubleshooting was performed last evening to try to isolate the problem to the chamber pressure OPT (Operational Pressure Transducer) in the RH forward skirt area. <\/p>\n<p>\u2018Initial indications are that the transducer is faulty, however further troubleshooting will have to be performed to ascertain the condition of the cabling between the Monoball and the aft IEA, and the cabling between the aft IEA and the OPT in the forward skirt.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS-115 \u2013&nbsp;And&nbsp;now also with&nbsp;Discovery on STS-116&nbsp;\u2013 TWO Stunning high quality&nbsp;2hr, 355mb videos \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p>Troubleshooting the chamber pressure issue was ceased last night due to lack of manpower and a lack of adapter cables required for testing. This has resumed on Tuesday morning.<\/p>\n<p>\u2018IPR-0064, RH SRB camera recorder #2 was \u2018off\u2019 and should\u2019ve been \u2018on\u2019. Troubleshooting is complete to date; this may be a camera recorder card issue, and a camera\/recorder R&amp;R is possible. This IPR is not a constraint to roll out to the pad.<\/p>\n<p>Another issue was also noted via an electrical bus error, which is also a constraint to rollout. However, this issue is not fully understood as to the culprit of the fault, which could lie anywhere between the RH SRB and the aft of Atlantis herself. <\/p>\n<p><font face=\"Arial\" size=\"2\">ATK\u2019s Tuesday update confirmed the issues with the RH SRB, but noted that plans are in work to carrying out evaluations at the launch pad.<\/font><\/p>\n<p>\u2018S0008, Shuttle Interface Test, is worked as far as possible. Stray voltage tests will follow IPR 117V-0063 resolution. SSV Rollout to Pad A call-to-stations are scheduled for 0300 hours on Wednesday to Thursday at the same time,\u2019 noted the ATK Quick Look report for Tuesday. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018IPR 0063 was written against the RH SRB electrical measurement that had an erratic reading. Troubleshooting points toward a bad OPT. Plans to R&amp;R the OPT at the pad are in work.\u2019<\/font><\/p>\n<p>Atlantis\u2019 processing has enjoyed a smooth flow until thes issues with one of her boosters, and such hiccups can be expected in any pre-launch work. There remains plenty of contingency time in the flow towards a March 15 launch date, regardless of a delay with rollout.<\/p>\n<p><font face=\"Arial\" size=\"2\">In other pre-launch news, a bent bracket has caused a slight delay in the preparations of Atlantis\u2019 S3\/S4 integrated truss payload at the launch pad.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The S3\/S4 integrated truss payload transfer from the canister to the PGHM (Payload Ground Handling Mechanism) was delayed yesterday due to a bent bracket on one of the payload support beam drive motors,\u2019 added the expansive Launch Operations report for Tuesday. \u2018The Z drive motor was removed last night and the PGHM moved aft to close the canister doors in anticipation of poor weather.<\/font><\/p>\n<p>\u2018An engineering review of a proposed solution will need to be performed along with the repair on 1st shift today. It is estimated that everything could be ready to support a payload transfer around mid 1st shift today. Canister lowering and transfer to the Canister Rotation Facility (CRF) will follow.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>United Space Alliance (USA) engineers are working on a troubleshooting plan, following \u2018erratic\u2019 chamber pressure readings on the right hand SRB (Solid Rocket Booster). The issue \u2013 which was noted last night without specifics \u2013 is still expected to delay rollout by 24 hours, although engineers are looking at possibly continuing their evaluations on the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41798","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41798"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41798"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41798\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}