{"id":41823,"date":"2007-01-15T23:15:17","date_gmt":"2007-01-15T15:15:17","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/shuttle-fleet-on-schedule-ahead-of-nasa-summit\/"},"modified":"2007-01-15T23:15:17","modified_gmt":"2007-01-15T15:15:17","slug":"shuttle-fleet-on-schedule-ahead-of-nasa-summit","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/shuttle-fleet-on-schedule-ahead-of-nasa-summit\/","title":{"rendered":"Shuttle fleet on schedule ahead of NASA summit"},"content":{"rendered":"<p>All three shuttle orbiters are enjoying a smooth processing flow ahead of the first key NASA summit of the year to discuss the status of the flagship vehicles.\n<\/p>\n<p>  The summit has been called for this Wednesday, which will be involve \u201cclose looks\u201d at post STS-116 processing on Discovery, and launch processing for Atlantis and Endeavour \u2013 as they are prepared for what is expected to be four launches in 2007.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**Over 3000mb of STS-116 onwards&nbsp;related presentions and mission documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;<\/em><em>**&nbsp;<\/em><\/p>\n<p><!--StartFragment --><em>Expansive Shuttle Stand-up\/Integration reports. NASA Launch Operation status reports. 15 PRCB presentations from the latest meeting&nbsp;on all shuttle related topics. Over&nbsp;800 pages of STS-117 Mission Information. Baseline Mission Presentations up to STS-120 \u2013&nbsp;and more available on L2.<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 Processsing Flow**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<p>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">The summit will be led by shuttle manager Wayne Hale, as the program reviews where they stand in terms of processing, in what could be classed as a mini FRR (Flight Readiness Review) for the fleet. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Summit on 17th for all vehicle processing. Orbiter, Program Integration, and a couple of elements will be involved in the discussion to assess the vehicles,\u2019 wrote Hale in the latest Shuttle Stand-up\/Integration report. \u2018Have list of agenda items; will ensure that we are all on the same page.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Atlantis will kick off the 2007 launch schedule for the shuttles, as she launches on STS-117 to the International Space Station (ISS), NET (No Earlier Than) March 15. Atlantis had her payload bay doors closed last week as she closes out work on her midbody, ready for rollover to the VAB (Vehicle Assembly Building). <\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\/\"><font face=\"Arial\"><\/font><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS_115&nbsp;\u2013 Stunning 2hr, 355mb video \u2013 from deorbit burn to post landing**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Vehicle in good shape. Have a month left of processing. Critical path is the tile; 41 cavities left and 105 completed. Have a good bond plan, which has us completing this task by the rollover date; will watch this closely every week,\u2019 added the report, confirming the rollover date \u2013 which has been delayed a week without any impacts to the launch date \u2013 is still under review.<\/font><\/p>\n<p>\u2018Closed the payload bay doors. Will do cycle of the doors after we do some tile work around the hinge line of the doors. Will not be leaving the doors open and will not be providing any access to the midbody at this point. Basically, the midbody is closed out for flight. <\/p>\n<p>\u2018Tile critical path includes the nose landing gear specifically. Marching towards a landing gear functional on the 23rd. Will ensure landing gear is completed before then and that the functional is complete. Everything going well with the ET and SRB process. Marching towards mate review on 15th and mate on 19th.\u2019<\/p>\n<p>Sometimes the forgotten orbiter of the fleet due to her lack of launch activity post Columbia \u2013 due to a Major Modification Period \u2013 Endeavour\u2019s march towards her summer launch (STS-118) is processing without issue. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Left Hand OMS (Orbital Manoeuvring Pod) is installed. The base work heel has been installed. Working on OBSS (Orbiter Boom Sensor System) and MPM optics alignment. Engineering has a good plan; putting shoulder back on the sill as a temporary installation.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The installation of her OMS Pods are a key stage towards flight, as the orbiter starts to take shape from her previous \u2018bare\u2019 appearance, as seen when she enjoyed a short spell in the Reusable Launch Vehicle hanger at the Kennedy Space Center, which was used for radar testing on Endeavour, as well as allowing work to be carried on in her Orbiter Processing Facility (OPF-2). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Doing optics now that Left Hand OMS is installed. Verifying that slotted holes are slotted in correct direction and in right amount. After fit check, will send out for holes to be slotted and install for flight. Issue is being handled well. Should be done by end of month for engineering installation.\u2019<\/font><\/p>\n<p>In another key event for her launch processing, Endeavour\u2019s three Space Shuttle Main Engines (SSMEs) will begin installation into the aft of the orbiter this week.<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Plan to start installing Engines 2045, 2051 and 2047 for OV-105 (Endeavour) on the 19th. They all have the AHMCs on them. Running final set of checkouts today on Engine 2045. When this is done, will get into leak check on that engine, which will be put into Position 1 on Friday.<\/font><\/p>\n<p>\u2018The other two Engines (2051 and 2047) have completed all critical processing and are in final pre-installation walk down, so we will be ready to support that critical milestone.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">The SSME installation comes shortly after a test on another engine was tested at the NASA Stennis Space Center (SSC), which suffered a sensor fault, but was still classed as a good test. However, they may conduct a re-test on Monday. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018On Engine 0525, had a good test. It ran a full duration of 710 seconds. It is in engine drying mode, and we will perform nozzle tube leak checks after that. We did have a low-pressure field pump discharge temp sensor that was kicked out during the test. Performed some troubleshooting on that again. <\/font><\/p>\n<p>\u2018If can resolve this, will be able to test again on Monday. This same sensor was removed during the last test in December. We sent sensor to the vendor who confirmed that under cryogenic conditions, one of the bridges did open up. Performing some wiggle tests on the harness today to isolate where the problem may be. Do have an extra sensor if it needs to be replaced.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">This test was also commented on the Stand-up\/Integration report by the Marshall Space Flight Center (MSFC), who added: That was the fifth test that we ran down at SSC on the hi-pot knife-edge seal redesign; have a few more to go. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Relative to the sensor that failed; that was a new sensor. A channel 8 failure on the sensor was verified. This was the same part number that failed and is not a flight configuration. We have a full effort going on to determine what is happening.\u2019<\/font><\/p>\n<p>Meanwhile, post flight processing of Discovery is progressing well, with inspections on her Thermal Protection System (TPS) continuing, which has so far identified 22 tiles that need to be replaced, following her successful STS-116 flight.<\/p>\n<p>\u2018TPS processing going well. We are 35 percent complete on post-flight inspections. Removed 6 tiles so far; there are 16 more planned. Total of 22 to be removed, but this number will grow as we finish post-flight inspections and review all that is being picked up.\u2019<\/p>\n<p><font face=\"Arial\" size=\"2\">While Discovery enjoyed a clean flight, damage was located around the ET door (Port), following an impact from the left Solid Rocket Booster during ascent. These tiles will require specialized installation.<\/font><\/p>\n<p>\u2018Looking at any replacements around the ET doors. Working with Engineering, because Engineering released that we install three around those areas. Working this with Engineering now.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">And finally, in what was previously a big concern for the shuttle manifest, Lockheed Martin and NASA workers at the Michoud Assembly Facility (MAF) in New Orleans are on schedule with their next series of External Tanks (ETs) that are being lined up for shipping to KSC. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018ET 117\u2019s production is going well. Continuing to support April 4th completion date. Moved tank to building 420 this week to continue with final production activity. Critical path is through the bipod; removing foam and doing some back shot work on harness assemblies.<\/font><\/p>\n<p>\u2018ET 125 is in Cell A where we are working towards completing work on flange. Dealing with corrosion issues. First sprays are planned for this weekend. <\/p>\n<p>\u2018For ET 120, have feed-through connector installation activities in progress as well as foam and cable tray removal, so can get to ice frost ramp.\u2019<\/p>\n<p><font size=\"2\"><\/font><font face=\"Arial\" size=\"2\">  <\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>All three shuttle orbiters are enjoying a smooth processing flow ahead of the first key NASA summit of the year to discuss the status of the flagship vehicles. The summit has been called for this Wednesday, which will be involve \u201cclose looks\u201d at post STS-116 processing on Discovery, and launch processing for Atlantis and Endeavour [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41823","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41823"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41823"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41823\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}