{"id":41824,"date":"2007-01-13T23:50:09","date_gmt":"2007-01-13T15:50:09","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-may-require-ares-i-pad-for-sts-117\/"},"modified":"2007-01-13T23:50:09","modified_gmt":"2007-01-13T15:50:09","slug":"nasa-may-require-ares-i-pad-for-sts-117","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-may-require-ares-i-pad-for-sts-117\/","title":{"rendered":"NASA may require \u2018Ares I\u2019 pad for STS-117"},"content":{"rendered":"<p>NASA is still trying to officially bring Pad 39A into operation for STS-117 and may switch back to 39B \u2013 the pad that will soon begin morphing into the Ares I launch pad \u2013 for the March launch of Shuttle Atlantis.\n<\/p>\n<p>  Pad 39A was last used for the ill-fated launch of Shuttle Columbia in 2003, before beginning refurbishment. However, shuttle managers late in the week were still trying to confirm if the pad can be brought back into launch operations in time for STS-117, with a cut-off decision date fast approaching.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/em><\/p>\n<p><em>**Over 3000mb of STS-116 onwards&nbsp;related presentions and documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;<\/em><em>**&nbsp;<\/em><\/p>\n<p><!--StartFragment --><em>STS-117 Flight Plans and Mission Handbooks (800 pages worth \u2013 non generic). STS-125 and LON-326&nbsp;(Hubble Rescue) Information. Pad&nbsp;39B Funding Presentation. Twice Weekly Shuttle Stand-up\/Integration Reports (Expansive)&nbsp;and more available on L2 \u2013 with Ares I resources listed at the end of this article.<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 Processsing Flow**<\/em><\/p>\n<p><em>**LIVE news updates on&nbsp;Endeavour&nbsp;STS-118 (LON-318)&nbsp;Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-122 (LON-322)&nbsp;Processing**<\/em><\/p>\n<p>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">While there hasn\u2019t be any hint of a delay in finalizing work on 39A, notes in the latest Shuttle Stand-up\/Integration report point to a fast approaching deadline, before which NASA need to be assured they can Atlantis from 39A, or move the NET (No Earlier Than) March 15 launch to 39B.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Managers are meeting with the team (on Friday) to discuss all the details of Pad A to ensure that it is definitely ready, and that we would not have to go to Pad B for any reason,\u2019 noted the report. \u2018(Next Tuesday) is the drop dead date for when we would have to make this decision. Will go through this thoroughly and make the decision that we are definitely going to Pad A.\u2019 <\/font><\/p>\n<p>The specifics on why NASA has found itself unsure of which pad they will be launching Atlantis from are not know, although a follow-on note did speak of one issue with the pad, without making the link to the deadline. <\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Found issue (Wednesday) night while doing preps for&nbsp;PGHM (Payload Ground Handling Mechanism) proof loads. Found an interference with&nbsp;PGHM on a recently completed mod. Now reviewing the interference. There is a panel that needs to be removed and modified and then put back up again. <\/font><\/p>\n<p>\u2018We are impacting the schedule for the proof loads to be completed. There is a potential of impacting the dummy payload ops scheduled for early next week. Have been in contact with Boeing and are working this.\u2019 <\/p>\n<p><font face=\"Arial\" size=\"2\">Pad 39B was set to be stood down from shuttle operations after STS-116, but the decision to have a LON (Launch On Need) rescue flight with Shuttle Discovery on the pad when Atlantis launches to service the Hubble Space Telescope on STS-125 in September 2008 ensured the pad would remain operation for the shuttle. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Following the Hubble mission, the pad will then be handed over to Constellation for preparation work for the Ares I-1R test flight at the end of the decade, a large delay to what was originally an April 1, 2007 handover date.<\/font><\/p>\n<p>Some work is due to be carried out on the 39B complex regardless, most notably the construction of three 600 feet tall lightning protection towers which will protect the tall Ares I vehicle while on the pad.<\/p>\n<p><font face=\"Arial\" size=\"2\">Soon after the handover from shuttle to Constellation, NASA will carry out major work on Pad 39B, most notably the construction of a huge rollercoaster escape system, which is fast moving towards asking companies to bid on contract, following last year\u2019s official approval for the system.<\/font><\/p>\n<p><em><font face=\"Arial\"><\/font><font size=\"2\">L2 Resources For Ares I, V and Constellation:&nbsp;Vehicle interfaces for the DAC 1C version of Orion Ares \u2013 Jan&nbsp;3. <\/font><\/em><font size=\"2\"><em><font face=\"Arial\">Ares&nbsp;I-1R Test Flight Plan (full outline) Presentation. Ares I-1 timeline and modification&nbsp;expanded info.&nbsp;Ares I&nbsp;extra solids graphics and&nbsp;info. Ares I troubleshooting latest.&nbsp;Ares I Reference Trajectory. Boeing\u2019s STS to Ares \u2013 Lessons Learned Presentation. Latest Ares I and Ares V baseline Configuration image and data. CLV DAC-1C (Changes to CLV Upper Stage). <\/font><\/em><\/font><\/p>\n<p>Ares I-1: Four Seg+Dummy \u2018Tuna Can\u2019 stage. Ascent Developmental Flight Test Presentation. CLV Pad 39B Handover Info and Latest. New images of CLV on top of new MLP and LUT. Lockheed Martin CEV\/Orion Updates. Constellation news updates. ATK figures on the 5-Seg Booster weight for CLV. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"101\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13637\" width=\"180\" align=\"left\" vspace=\"5\" border=\"0\/\">90 Minute Video of Constellation all hands meeting. CLV TIM Meeting Information. CLV\/CaLV Infrastructure, Timelines and Information. Escape System Trade Study Presenation.<\/p>\n<p>CEV-CLV Design Analysis Cycle Review (DAC-2) Presentation. Constellation SRR updates. CLV Stick \u2013 Troubleshooting\/Alternatives\/Updates. New CEV Images (include abort mode). Flight Design and Dynamics Division CEV update. CLV Mono-propellant RCS system. CEV pressurisation system review. CLV\/CEV Configuration Images. The 2\u00d73 Seg SRB Crew Launch Vehicle Option Presentation\u2026plus more.<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\/\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><\/font><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><em><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA is still trying to officially bring Pad 39A into operation for STS-117 and may switch back to 39B \u2013 the pad that will soon begin morphing into the Ares I launch pad \u2013 for the March launch of Shuttle Atlantis. Pad 39A was last used for the ill-fated launch of Shuttle Columbia in 2003, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41824","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41824"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41824"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41824\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}