{"id":41829,"date":"2007-01-07T00:05:38","date_gmt":"2007-01-06T16:05:38","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/launches-slip-four-2007-shuttle-missions\/"},"modified":"2007-01-07T00:05:38","modified_gmt":"2007-01-06T16:05:38","slug":"launches-slip-four-2007-shuttle-missions","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/launches-slip-four-2007-shuttle-missions\/","title":{"rendered":"Launches slip \u2013 four 2007 Shuttle missions"},"content":{"rendered":"<p>Both STS-122 and STS-123 have slipped in the latest NASA FAWG (Flight Assignment Working Group) launch manifest, reducing the amount of shuttle missions in 2007 to four.  <\/p>\n<p>  The moves set up a run of six launches in 2008, the year which will be highlighted by STS-125 \u2013 the mission to service the Hubble Space Telescope for a final time.\n<\/p>\n<p><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/p>\n<p><em>**Over 2500mb of STS-116 onwards related presentions and mission documentation <\/em><em>available on L2<\/em><em> <\/em><em>** <\/p>\n<p><\/em><!--StartFragment --><em>Latest FAWG Manifest Presentation. STS-124 Additonal Crewmember Evaluation Presentation. Flight Processing Documentation (Through to STS-123). Daily Extensive NASA\/USA Integration and Status Reports. STS-122 Baseline Mission Presentation (100 pages) \u2013 and more available on L2.<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis STS-117 Processsing Flow**<\/em><\/p>\n<p><em>**LIVE news updates on Endeavour STS-118 (LON-318) Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery STS-122 (LON-322) Processing**<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"140\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=17018\" width=\"101\" align=\"left\" vspace=\"5\" border=\"0\">The two moves are both listed as \u2018ISS requests\u2019 \u2013 which refer to conflicts in the schedule of visiting vehicles to the station, namely the on-going changes to the Soyuz and shuttle arrival and departure dates. <\/p>\n<p>At present, due to a previous change in the shuttle manifest, Soyuz TMA-11\u2019s October arrival ultimately conflicts with STS-122, causing Discovery\u2019s launch to move to November, pushing STS-123 with Endeavour into 2008. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Discovery\u2019s return to action post-STS-116 was set for October 17 with STS-122, but has now been pushed back to November 5. STS-123 \u2013 Endeavour\u2019s second flight since coming out of her Major Modification Period \u2013 was set to take place on December 8, but now moves into 2008, with a new NET (No Earlier Than) date of January 17. <img loading=\"lazy\" decoding=\"async\" height=\"137\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=17019\" width=\"116\" align=\"right\" vspace=\"5\" border=\"0\"><\/p>\n<p>Both orbiter\u2019s LON (Launch On Need) rescue mission requirements remain unchanged. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Unrelated moves are also being evaluated to add a seventh crewmember to STS-124, which would see some of the cargo on Atlantis\u2019 flight being moved to STS-123 to aid such an addition to take place. Further details on those evaluations will follow in the coming days. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, processing on the fleet continues at a strong pace, with post flight work on Discovery going to schedule, along with launch preparations on Atlantis and Endeavour, as they are both readied to carry out the next three shuttle missions. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">On Discovery, Vent Door functionality checks were delayed on Friday, due to the unavailability of required consoles in Firing Room 2A at the Kennedy Space Center (KSC), which monitor the tests on the orbiter. The test will now be carried on Monday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"110\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=16974\" width=\"150\" align=\"left\" vspace=\"5\" border=\"0\">Discovery\u2019s SPACEHAB module\/payload was removed from her cargo bay in the OPF (Orbiter Processing Facility) on Friday, while the SPACEHAB duct will be removed from the orbiter on Sunday.<\/p>\n<p>Troubleshooting on an event timer indicated a bad contact on thumb wheel or a bad cable; a breakout box will be installed at the Timer Display Panel to further isolate the failure to the thumbwheel contacts or the timer binary decoder. <\/p>\n<p>Work is continuing over the weekend, with \u2018SCAPE ops for hyper de-servicing and APU catch bottle drains are scheduled for Sunday,\u2019 according to the Jan 5 NASA Launch Ops Status Report. \u2018Weekend work: Discovery will be powered up on Sunday to support SCAPE ops for hyper de-servicing and APU catch bottle drains.\u2019<\/p>\n<p>Work to ready Endeavour for her first mission in years is progressing well in OPF-2, with the orbiter beginning to take shape as major propulsion elements are re-installed into her body. <\/font><\/p>\n<p>  Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">Notable work taking place at the end of the week included the left hand OMS (Orbital Manoeuvring System) pod installation preparations, which is now in the OPF, ready for installation on Endeavour next Tuesday. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Several leak and functionality checks are ongoing on the orbiter, which has her payload bays doors open for the successful deployment test of her KU Band antenna, which will beam down TV pictures of her STS-118 flight, which is due to launch at the end of June.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"130\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13815\" width=\"200\" align=\"left\" vspace=\"5\" border=\"0\"><font face=\"Arial\"><font size=\"2\">**Ride home through the fire and plasma of re-entry with Atlantis on STS_115 \u2013 Stunning 2hr, 355mb video \u2013 from deorbit burn to post landing**<\/font><\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">United Space Alliance engineers also noted that some of Endeavour\u2019s Forward Reaction Control System (FRCS) brushings were not found to be seated properly on their attach points on the orbiter, which has led to a similar investigation on Atlantis.<\/p>\n<p>\u2018Data from attach point gap dimensions before and after final torque on 104 (Atlantis) will be evaluated by engineering again to determine if any rework will be required; results are expected mid-next week,\u2019 added the extensive Jan 5 report. \u2018TPS (Thermal Protection System) rework will be an issue if inspections are required.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Engineers are also working over the weekend on \u2018Cabin air recirc\/maintenance, forward compartment closeout\/hatch ops, flipper door closeouts, TPS ops, SSME (Space Shuttle Main Engines) carrier panels, and pyro hi-pots.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=16966\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\">In the VAB (Vehicle Assembly Building), Atlantis\u2019 twin Solid Rocket Boosters, know as Booster Integration (BI-129) have completed their stacking operation and are now being readied for the mating of the External Tank (ET-124). Segment Leak Checks and Segment Joint Closeouts have also been completed. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">While a few closeout operations are being completed this weekend, an issue has arisen with ET-124, which is undergoing evaluations. \u2018Unknown Contamination on LO2 Tank. Contamination was removed yesterday and engineering evaluation is currently in work,\u2019 noted the report.<\/p>\n<p>It is not uncommon for such issues to be seen on a tank, shortly after being shipped from Michoud (MAF) to KSC. Last year, ET-118 was observed to be leaking water out of its IT GSE access door, before being cleared for flight with Atlantis on STS-115.<\/font><em><br \/><\/em><br \/><em><font face=\"Arial\" size=\"2\">**Re-live Discovery STS-116 \u2013 FOR EACH FLIGHT DAY**<\/font><\/em><font face=\"Arial\" size=\"2\"> \u2013 100,000s of visitors over the mission. T|he largest collection of STS-116 mission updates anywhere on the net.<\/font><br \/><font size=\"2\"><br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute STS MUSIC VIDEO**<\/font><\/em><font face=\"Arial\"><font size=\"2\"><em> \u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\"> <\/p>\n<p><\/font><\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Both STS-122 and STS-123 have slipped in the latest NASA FAWG (Flight Assignment Working Group) launch manifest, reducing the amount of shuttle missions in 2007 to four. The moves set up a run of six launches in 2008, the year which will be highlighted by STS-125 \u2013 the mission to service the Hubble Space Telescope [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41829","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41829"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41829"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41829\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41829"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41829"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41829"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}