{"id":41865,"date":"2006-12-05T20:47:01","date_gmt":"2006-12-05T12:47:01","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-working-two-issues-ahead-of-sts-116\/"},"modified":"2006-12-05T20:47:01","modified_gmt":"2006-12-05T12:47:01","slug":"nasa-working-two-issues-ahead-of-sts-116","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-working-two-issues-ahead-of-sts-116\/","title":{"rendered":"NASA working two issues ahead of STS-116"},"content":{"rendered":"<p>Tuesday\u2019s L-2 Mission Management Team (MMT) has found two issues that require further evaluations, ahead of Shuttle Discovery\u2019s Thursday\u2019s launch from the Kennedy Space Center in Florida.  <\/p>\n<p>  S0007 Launch Countdown Operations are proceeding, although two issues, one with orbiter power and another with test results on the Solid Rocket Motor J Seal, will require further evaluations at Wednesday\u2019s L-1 MMT.<br \/>\n<em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/p>\n<p><em>**Over 2100mb of STS-116 onwards&nbsp;related presentions and mission documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-116 Processing at the Pad**<\/em>&nbsp;<em>Extensive Launch and Mission coverage begins Wednesday night<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 (STS-317) Processsing Flow**<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">Flight Director Leroy Cain noted that at present Discovery is on the timeline in the countdown for the Thursday night launch at 9:35pm local time, with cryogenic loading set to take place tonight.<\/p>\n<p>While the L-2 MMT proceeded relatively smoothly, two issues remain outstanding. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We met today at our L-2 MMT and reviewed several items in the meeting \u2013&nbsp;as we always do in the way of status,\u2019 noted Cain. \u2018We also reviewed several items that are open, and we have a couple of new issues. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Two of the issues that we\u2019re working through will be discussed at the L-1 MMT meeting (Wednesday), because we don\u2019t yet have enough data coming into the meeting today to discuss in any level of detail. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/em>\u2018One of the issues happened overnight, where we had a condition out at the pad with the vehicle and the power systems. We were adjusting the power from the MLP (Mobile Launch Platform) to the orbiter and there was a transient \u2013 or erratic condition, which put a voltage condition on the main A Bus on the orbiter that resulted in that Bus coming off line and being shared by the other two Buses \u2013 Main B and Main C. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We don\u2019t yet know what some of the systems on the orbiter saw, as the guys have not had a chance to go look at the data, so they are going to do that. We do know \u2013 in the case of the other elements \u2013 such as the External Tank, Solid Rocket Boosters and main engines, that we don\u2019t have any issues with those due to the configuration they were in at the time of this transient condition. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Because the transient was very short lived \u2013 less than half of a second \u2013 that we\u2019re probably not going to have any issues with that.\u2019<\/p>\n<p>Engineers and technicians are checking Discovery at present to gain more data on the incident. The resulting information will be presented to Wednesday\u2019s T-1 MMT. <\/font><\/p>\n<p>  NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The second issue is with the Solid Rocket Motor, relating to the plies that are on the joint (J Seal). <\/p>\n<p>\u2018There is a pressure sensitive application \u2013 adhesive if you will \u2013 and there may be an issue with one of the poll tests for this specific adhesive material. We don\u2019t know the details of it yet. We don\u2019t know if it will be any kind of restraint or issue that we have to talk about beyond what we\u2019ll hear tomorrow when we get more information. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018So we have those two items that we\u2019re coming back with tomorrow, and we\u2019ll talk about anything else that comes up between now and then.\u2019<\/p>\n<p>Past those two issues, Discovery\u2019s preparations are moving along smoothly.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The launch countdown is proceeding on the timeline, as the team next prepare to carry out cryogenic loading on the vehicle tonight,\u2019 added Cain. \u2018So we\u2019re on track for Thursday.<\/p>\n<p>\u2018This will be our third mission this year, the second for Discovery which will be significant for us, the 33rd for Discovery overall, and the 117th mission in the history of the Space Shuttle program. <\/p>\n<p>\u2018The preparation of Discovery by this team has been outstanding, (given) it involved a 110 day processing flow in the Orbiter Processing Facility.\u2019<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS-115 MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/p>\n<p><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/em><\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tuesday\u2019s L-2 Mission Management Team (MMT) has found two issues that require further evaluations, ahead of Shuttle Discovery\u2019s Thursday\u2019s launch from the Kennedy Space Center in Florida. S0007 Launch Countdown Operations are proceeding, although two issues, one with orbiter power and another with test results on the Solid Rocket Motor J Seal, will require further [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41865","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41865"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41865"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41865\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}