{"id":41873,"date":"2006-11-30T00:29:27","date_gmt":"2006-11-29T16:29:27","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-approve-sts-116-launch-date\/"},"modified":"2006-11-30T00:29:27","modified_gmt":"2006-11-29T16:29:27","slug":"nasa-approve-sts-116-launch-date","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-approve-sts-116-launch-date\/","title":{"rendered":"NASA approve STS-116 launch date"},"content":{"rendered":"<p>NASA managers have concluded their two day FRR (Flight Readiness Review) by approving the NET (No Earlier Than) December 7 launch of Shuttle Discovery on STS-116.  <\/p>\n<p>  During the meeting, managers evaluated all updated concerns relating to the 12 day mission to the International Space Station (ISS) \u2013 including related issues of what will be the first night launch since the loss of Columbia.<br \/>\n<em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/p>\n<p><em>**Over 2100mb of STS-116 onwards&nbsp;related presentions and mission documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-116 Processing**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 (STS-317) Processsing Flow**<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">The launch window will extend to December 17 \u2013 with a return to evaluations on whether they can launch after that date, given the conflict of YERO (Year End Rollover), which would require Discovery to be docked on the ISS during the end of year event.<\/p>\n<p><\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Following STS-115 being called as the most complex assembly flight in Shuttle history, Associate Administrator Bill<!--StartFragment --> Gerstenmaier noted that STS-116 will be even more complex, as the mission carries out what is being tagged as a&nbsp;re-wiring of&nbsp;the station, following the installation of the P3\/P4 truss elements on the previous launch. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We\u2019ve had a very thorough review over the past two days covering a variety of topics, \u2018said<!--StartFragment --> Gerstenmaier. \u2018We spent a lot of time talking about the complexity of his mission, which starts off with the installation of the P5 truss segment \u2013 which has two inches of (robotic) arm clearance (during installation). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We\u2019re also going to retract the P6 Array on the station, after that has been deployed for six years now. We\u2019ve spent a lot of time checking we can do that retraction correctly.\u2019 <\/font><\/p>\n<p><!--StartFragment --><font face=\"Arial\" size=\"2\">Gerstenmaier also noted how the complexity of the mission was brought to light during the FRR, as the technical community gave their overviews on stations during the review. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Another way to look at the complexity of this mission is by how many commands we\u2019ll be sending to the ISS. On a typical day we\u2019d expect to send about 800 commands a day. On this mission we\u2019ll be sending over 4,000 commands for three days. <\/p>\n<p>\u2018So that gives you an idea of just how much command traffic has to come from the ground to Station to carry out elements of this mission on orbit. That really struck me during the review.\u2019<\/p>\n<p><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, Shuttle manager Wayne Hale paid tribute to the workforce for realizing the NET December 7 launch date \u2013 which was the first time a NET date on the schedule has actually been moved up, rather than pushed down, as normally seen with processing flows. <\/font><\/p>\n<p>  Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018As we were going through several issues in vehicle processing, the team found a couple of items they needed to call a timeout for,\u2019 noted Hale. \u2018They stopped work, and carried out the processing properly. I\u2019m very proud of the team for taking the right approach to the schedule, which is to say it comes second to doing the work properly and making sure we\u2019re safe. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018That is probably as good an omen for the future of the space program as I could ask for.\u2019<\/p>\n<p>Hale also noted that collecting imagery of any foam liberation on ascent won\u2019t be as restricted as the night launch scenario would lead people to assume. The recent night booster firing by ATK has proved that the lighting conditions caused by the intense light from the exhaust will allow for most cameras to be able to gain the required data. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We had a marvellous night firing of a solid rocket motor out in Utah, and we proved the camera on the vehicle will still be able to get quite a lot of data for us,\u2019 he said. \u2018For the first two minutes of the first stage of ascent, we should get some good data.<\/p>\n<p>\u2018I\u2019m looking forward to a really spectacular launch.\u2019<\/p>\n<p><\/font><\/p>\n<p><font size=\"2\"><font face=\"Arial\">Further articles will follow.<\/font><br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS-115 MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/p>\n<p><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/em><\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have concluded their two day FRR (Flight Readiness Review) by approving the NET (No Earlier Than) December 7 launch of Shuttle Discovery on STS-116. During the meeting, managers evaluated all updated concerns relating to the 12 day mission to the International Space Station (ISS) \u2013 including related issues of what will be the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41873","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41873"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41873"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41873\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}