{"id":41883,"date":"2006-11-14T22:36:19","date_gmt":"2006-11-14T14:36:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/shuttles-stablizing-ahead-of-tcdt\/"},"modified":"2006-11-14T22:36:19","modified_gmt":"2006-11-14T14:36:19","slug":"shuttles-stablizing-ahead-of-tcdt","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/shuttles-stablizing-ahead-of-tcdt\/","title":{"rendered":"Shuttle\u2019s stablizing ahead of TCDT"},"content":{"rendered":"<p>All three of NASA\u2019s Shuttle orbiters are enjoying a smooth processing flow, ahead of the next launch with Discovery on STS-116.  <\/p>\n<p>  Another milestone in Discovery\u2019s preparations for the launch, set to take place between December 7th and 17th, is the Terminal Countdown Demonstration Test (TCDT) \u2013 which begins Wednesday.<br \/>\n<em><img loading=\"lazy\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/p>\n<p><em>**Over 2000mb of STS-116 onwards&nbsp;related presentions and mission documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;\u2013 including three presentations associated with this article**<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-116 Processing and TCDT LIVE**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 (STS-317) Processsing Flow**<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\">Discovery underwent a large amount of pad processing work over the weekend, with a hot fire test on APU (Auxiliary Power Unit) 3, and is now surrounded by the protective Rotating Service Structure (RSS). <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/em>\u2018Lots of work done on vehicle at launch pad this weekend,\u2019 noted Shuttle manager John Shannon the latest Shuttle Integration Report acquired by this site. \u2018Confidence run completed for APU 3. RSS rotated Payload installed. Tunnel adapter mated to SpaceHab and leak-checked. Installed RMS (Remote Manipulator System) side view cameras. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Chit for radiator retract hose leak check completed. Mated several OMS (Orbital Manoeuvring System) and RCS (Reaction Control System) quick disconnects for hypergols. Performed half of SRB (Solid Rocket Booster) aft flow tests, and plan to complete remainder today. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018TCDT on Wednesday and Thursday, and plan to close payload bay doors by Friday.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The TCDT is a countdown&nbsp;dress rehearsal for the crew of Discovery \u2013 which will be commanded by Mark Polansky. Among the TCDT tasks will be emergency scenarios, such as using the launch pad\u2019s Emergency Egress System. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Meanwhile, Atlantis \u2013 required for LON (Launch On Need) support of Discovery as LON-317, is pressing ahead with launch processing in OPF-1. She will receive her OBSS boom this week and is undergoing Fuel Cell and RCS Thrusters work. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Work is also progressing on the repair to the flash evaporator, which suffered issues during STS-115. Her three SSMEs (Space Shuttle Main Engines) will soon begin the installation process. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Remaining work on TPS (Thermal Protection System) tiles is picking up a pace with United Space Alliance orbiter&nbsp;techs now being moved from Discovery to aid work with Atlantis and Endeavour. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Endeavour herself is continuing to move out of her deep sleep, following a Major Modification Period. Main work surrounds External Tank door functionality and the installation of her chin panel. <\/p>\n<p><\/font><font face=\"Arial\" size=\"2\">Also of interest for Endeavour, as she moves towards next year\u2019s STS-118, is the installation of Tin Whisker boxes, which \u2013 while given no specific notes of their purpose \u2013 may be associated with evaluations on recent concerns over slices of metal from circuit boards&nbsp;in the orbiter causing potential shorts.<\/p>\n<p>Also on the good news front is the lack of issues pertaining to the next two External Tanks due out of the Michoud Assembly Facility (MAF) in New Orleans. ET-124 \u2013 Atlantis\u2019 tank, required for LON-317 \u2013 is still on schedule to leave MAF on December 17.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS-115 MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/p>\n<p><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/em><\/em><\/em><\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>All three of NASA\u2019s Shuttle orbiters are enjoying a smooth processing flow, ahead of the next launch with Discovery on STS-116. Another milestone in Discovery\u2019s preparations for the launch, set to take place between December 7th and 17th, is the Terminal Countdown Demonstration Test (TCDT) \u2013 which begins Wednesday. **Over 2000mb of STS-116 onwards&nbsp;related presentions [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41883","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41883"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41883"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41883\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}