{"id":41886,"date":"2006-11-10T22:41:05","date_gmt":"2006-11-10T14:41:05","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-to-implement-new-external-tank-design\/"},"modified":"2006-11-10T22:41:05","modified_gmt":"2006-11-10T14:41:05","slug":"nasa-to-implement-new-external-tank-design","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-to-implement-new-external-tank-design\/","title":{"rendered":"NASA to implement new External Tank design"},"content":{"rendered":"<p>The final major modification to the External Tanks heads into its Critical Design Review (CDR) this weekend, as NASA aim to mitigate potential \u201cthreat areas\u201d of foam liberation during the Shuttle\u2019s ride uphill.  <\/p>\n<p>  The Ice Frost Ramps (IFRs) have completed wind tunnel testing, with the new design set to be incorporated next week on ET-124 (STS-117 \u2013 Atlantis) \u2013 and on all future tanks.<br \/>\n<em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=13910\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/p>\n<p><em>**Over 350mb of STS-116&nbsp;related presentions and mission documentation&nbsp;<\/em><em>available on L2<\/em><em>&nbsp;\u2013<\/em><em> Further IFR images and several documents on IFR re-design are available on L2.<\/em><\/p>\n<p><em>**LIVE news updates on Discovery&nbsp;STS-116 Processing Flow + ROLLOUT**<\/em><\/p>\n<p><em>**LIVE news updates on Atlantis&nbsp;STS-117 (STS-317) Processsing Flow**<\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><br \/><em>**UPDATE: NASA CDR defers decision past ET-124**<\/p>\n<p><u>Initial article:<br \/><\/u><\/em><br \/>An on site review of the new design is taking place on Saturday, which is part of the three day CDR that will end with the approval and immediate implementation of the design on ET-124. Work will start the day after the CDR concludes. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">That tank is currently undergoing final production work at the Michoud Assembly Facility (MAF) in New Orleans, as it heads for a mid December shipping date to the Kennedy Space Center in Florida. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><font size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/em>Each External Tank has 34 ramps, which house two pressurization lines that run alongside the tank. However, only the top four ramps on the Liquid Hydrogen area of the tank are deemed at risk of causing damage to an orbiter\u2019s TPS (Thermal Protection System) from foam liberating off the ramps during ascent.<\/p>\n<p>Getting to this stage of heading into the CDR has been a delayed process, with some test results having to be refined due to small amounts of chipping observed in the wind tunnel \u2013 which itself was unavailable for a period of time, adding to the delays. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However, aligned with the new schedule for the Shuttle fleet, Modifications on ET-124 can start next week, with plenty of time in adhering to the required shipping date to get the tank to Florida in time for Atlantis\u2019 LON-317 requirement next year. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The modifications to ET-124 will involve the top three IFRs being \u2018cut down\u2019 to a thin collar, which is the preferred design. At one stage it appeared that leaving the ramps \u2018as is\u2019 was favored by engineers, based on the excellent performance of tank on the last two flights. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However, given NASA wishes to continue to reduce the risks associated with foam loss on ascent, this extra move was seen as prudent, pre-empting any potential issue with the unmodified ramps on future flights. <\/font><\/p>\n<p>  SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">STS-116, launching in a window that begins on December 7, will be using ET-123, which does not have the modification of the new IFR design, but the confidence gained from the last two flights mitigate any concerns in regards of the unmodified ramps.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Further changes to the ETs during these final few years of the Shuttle program aren\u2019t ruled out, with Shuttle managers stressing tha the ET foam is not an exact science, with lessons learned on every ascent uphill.<br \/><\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=12993\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**INFINITY: 10 minute&nbsp;STS-115 MUSIC&nbsp;VIDEO**<\/font><\/em><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013 <br \/><\/em>(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/p>\n<p><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/em><\/em><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The final major modification to the External Tanks heads into its Critical Design Review (CDR) this weekend, as NASA aim to mitigate potential \u201cthreat areas\u201d of foam liberation during the Shuttle\u2019s ride uphill. The Ice Frost Ramps (IFRs) have completed wind tunnel testing, with the new design set to be incorporated next week on ET-124 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41886","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41886"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41886"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41886\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}