{"id":41958,"date":"2006-08-31T19:07:59","date_gmt":"2006-08-31T11:07:59","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/lockheed-martin-win-nasa-orion-contract\/"},"modified":"2006-08-31T19:07:59","modified_gmt":"2006-08-31T11:07:59","slug":"lockheed-martin-win-nasa-orion-contract","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/lockheed-martin-win-nasa-orion-contract\/","title":{"rendered":"Lockheed Martin win NASA Orion contract"},"content":{"rendered":"<p>Lockheed Martin have been awared the $4.5 billion contract by NASA, and will undertake the construction of the Crew Exploration Vehicle (CEV), known as Orion.  <\/p>\n<p>  The announcement was made by NASA during today\u2019s on-going press conference, which is a shock, given Northrop-Grumman\/Boeing were favourites.<br \/>\n<font face=\"Arial\" color=\"#ff0000\" size=\"2\"><em>  <\/em><\/font><\/p>\n<p><font face=\"Arial\" color=\"#ff0000\" size=\"2\"><em><font face=\"Arial\" size=\"2\"><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9981\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><\/em><\/font><\/p>\n<p><font face=\"Arial\" color=\"#ff0000\" size=\"2\"><em>  <\/p>\n<p>For comprehensive and in-depth&nbsp;coverage of the Constellation Program, including documents, presentations, videos, images and live updates, join L2.<\/p>\n<p><\/em><\/font><font face=\"Arial\" size=\"2\"><em>**LIVE CEV\/ORION DECISION UPDATE PAGE**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><em>**FREE&nbsp;VIDEO OF TODAY\u2019S&nbsp;ANNOUNCEMENT AND LM CEV VIDEOS**<\/em><\/font><em><font face=\"Arial\" size=\"2\">&nbsp;<\/font><br \/><\/em><font size=\"2\"><font face=\"Arial\"><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><\/font><\/font><font face=\"Arial\" size=\"2\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Orion will be capable of transporting four crewmembers for lunar missions and later supporting crew transfers for Mars missions. Orion could also carry up to six crew members to and from the International Space Station. <\/p>\n<p>\u2018We are honored by the trust that NASA has placed in the Lockheed Martin team for this historic and vital step forward in human space exploration,\u2019 said Bob Stevens, chairman of the board, president and chief executive officer of Lockheed Martin Corporation. <\/p>\n<p>\u2018Our entire team is fully committed to supporting NASA as we join together to help make the vision for space exploration a reality.\u2019<\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">The first Orion launch with humans onboard is planned for no later than 2014, and for a human moon landing no later than 2020. Orion will form a key element of extending a sustained human presence beyond low-Earth orbit to advance commerce, science and national leadership. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font>The contract with Lockheed Martin is the conclusion of a two-phase selection process. NASA began working with the two contractor teams, Northrop Grumman\/Boeing and Lockheed Martin, in July 2005 to perform concept refinement, trade studies, analysis of requirements and preliminary design options. Lockheed Martin will be responsible for the design, development, testing, and evaluation (DDT&amp;E) of the new spacecraft.   <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We are humbled and excited as we continue our legacy of five decades of partnership with NASA in every aspect of human and robotic space exploration,\u2019 said Joanne Maguire, executive vice president of Lockheed Martin Space Systems Company. <\/p>\n<p>\u2018Work already is underway and we are fully focused on the vital tasks that lie ahead to meet NASA\u2019s requirements for the program. We have a world-class team of highly dedicated, highly experienced women and men who are passionate about the success of NASA\u2019s missions.\u2019<\/font><\/p>\n<\/p>\n<p><font face=\"Arial\" size=\"2\">Manufacturing and integration of the vehicle components will take place at contractor facilities across the country. Lockheed Martin will perform the majority of the Orion vehicle engineering work at NASA\u2019s Johnson Space Center, Houston, and complete final assembly of the vehicle at the Kennedy Space Center, Fla. All 10 NASA centers will provide technical and engineering support to the Orion project. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">The contract is structured into separate schedules for DDT&amp;E with options for production of additional spacecraft and sustaining engineering. During DDT&amp;E, NASA will use an end-item cost-plus-award-fee incentive contract. This makes the award fee subject to final determination after the contractor has demonstrated that it meets the technical, cost, and schedule requirements of the contract. <\/font>  <\/p>\n<p>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">DDT&amp;E work is estimated to occur from Sept. 8, 2006, through Sept. 7, 2013. The estimated value is $3.9 billion. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Production and sustaining engineering activities are contract options that will allow NASA to obtain additional vehicles as needed. Delivery orders over and above those in the DDT&amp;E portion will specify the number of spacecraft to be produced and the schedule on which they should be delivered. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Post-development spacecraft delivery orders may begin as early as Sept. 8, 2009, through Sept. 7, 2019, if all options are exercised. The estimated value of these orders is negotiated based on future manifest requirements and knowledge gained through the DDT&amp;E process and is estimated not to exceed $3.5 billion. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Sustaining engineering work will be assigned through task orders. The work is expected to occur from Sept. 8, 2009, through Sept. 7, 2019, with an estimated value of $750 million, if all options are exercised. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/em><\/font><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><font face=\"Arial\" size=\"2\"><em>&nbsp;<br \/><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/em><\/font><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lockheed Martin have been awared the $4.5 billion contract by NASA, and will undertake the construction of the Crew Exploration Vehicle (CEV), known as Orion. The announcement was made by NASA during today\u2019s on-going press conference, which is a shock, given Northrop-Grumman\/Boeing were favourites. For comprehensive and in-depth&nbsp;coverage of the Constellation Program, including documents, presentations, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41958","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41958"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41958"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41958\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}