{"id":41973,"date":"2006-08-18T01:00:42","date_gmt":"2006-08-17T17:00:42","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-draws-up-sts-116-troubleshoot\/"},"modified":"2006-08-18T01:00:42","modified_gmt":"2006-08-17T17:00:42","slug":"nasa-draws-up-sts-116-troubleshoot","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-draws-up-sts-116-troubleshoot\/","title":{"rendered":"NASA draws up STS-116 troubleshoot"},"content":{"rendered":"<p>While NASA prepares for the launch of Shuttle Atlantis on STS-115 at the end of the month, the agency is working on solutions for Discovery\u2019s STS-116 mission, which could suffer a stranglehold on its launch window, due to a problem called YERO.  <\/p>\n<p>  YERO, or Year End Rollover, could prove to be a problem if Discovery launches late in her window, which would see her on orbit during the change of year to 2007 \u2013 which has an adverse effect on flight software.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img fetchpriority=\"high\" decoding=\"async\" height=\"129\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9981\" width=\"600\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>Information collated from documents available to download on L2.<br \/>Previous related article: http:\/\/www.nasaspaceflight.com\/content\/?cid=4640<\/p>\n<p>**STS-116 LIVE UPDATES**<\/em><\/p>\n<p>A number of documents acquired by this site show NASA is working on both the potential issues that may arise with the orbiter\u2019s reaction to a change of year whilst on orbit \u2013 along with a troubleshooting test that will be carried out in October. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018STS-116 launch window may result in Shuttle operations over the year end,\u2019 noted the troubleshooting outline document. \u2018If so, at midnight GMT on Dec. 31 the MTUs (Master Timing Units) will rollover to day 1 and PASS (Primary Avionics System Software) flight software, which increments to day 366, will declare them failed and fault down to internal GPC time. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The purpose of this test is to verify that the YERO procedure successfully forces STS-116 PASS FSW to accept MTU time and correctly configures it for continued operations, through landing.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"125\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9361\" width=\"125\" align=\"left\" vspace=\"5\" border=\"0\"><\/font>A post-test briefing will be held on October 31, well ahead of STS-116\u2019s Flight Readiness Review, which could see Discovery\u2019s mission either going ahead as planned \u2013 with a solution in place, a restriction of the launch window being reduced to just three days, or the launch window being moved to 2007. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Should a YERO event prove to be unacceptable for flight, the launch window opportunity for Discovery in December will end after December 16, as noted in the YERO outline document: \u2018Potential YERO event in flight if launch after December 16.\u2019<\/p>\n<p>NASA has no real experience of how an orbiter would react on orbit with a change of year, given what would have been the only previous YERO flight \u2013 STS-32 in 1989 \u2013 suffered a launch slip. <\/p>\n<p>However, NASA does have an arsenal of testing resources to fall back on, noted as the four SAIL&nbsp;(Shuttle Avionics Integration Lab)&nbsp;tests, completed at the end of 2005,&nbsp;which was recommended for contingency use only.<\/p>\n<p>Processing with Discovery is going smoothly in the flow, allowing NASA a relaxed timeline in completing evaluations for making a decision on projected impacts \u2013 allowing engineers and technicians two months to report back with their findings. <\/font><\/p>\n<p>  SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">The overview document is clear in its current standing on the impact, with the findings to \u2018Determine which launch dates MOD can support \u2013 YERO event while docked: Timeline impacts \u2013 Post-undock: No ISS resources (comm, att cntl) \u2013 YERO not permitted: Launch window impact. <\/p>\n<p>\u2018If YERO option is permitted \u2013 STS-116 Team will: Determine placement of YERO procedure in flight timeline (for portions which can be delayed).\u2019<\/p>\n<p>A full agenda has been tasked on the \u2018YERO team\u2019 \u2013 allowing for a clear representation of options available for shuttle managers, which will likely report back to various PRCB meetings at the Johnson Space Center.<\/p>\n<p>\u2018YERO Team will: Determine which YERO steps may be delayed, and for how long. Identify impacts and point-of-contact for affected areas. Develop flight-specific procedure for STS-116 (on-board and ground). <\/p>\n<p>\u2018Support integrated STS-116 SAIL\/MCC test in conjunction with FSW verification team(include other centers, where possible). Revisit MCC rollover test (may piggy-back with ISS BCC test). Work with DT to develop flight-specific YERO sims for STS-116 team (on-orbit and entry teams). <\/p>\n<p>The document continues with a variety of potential impacts, how long they could impact the orbiter, and potential on orbit solutions should YERO manifest itself during the mission during the change of year. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The main concerns are loss of General Purpose Computer function and control of the orbiter for a undefined period of time. Such considerations need to be taken into account when the mission time may be extended into a YERO event, for reasons such as being waived off from the planned landing date due to unacceptable weather at the landing facilities.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The full test in October will give a clearer picture on how NASA should proceed.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The other main issue surrounding the launch window for STS-116 \u2013 namely the External Tank shipping date for Atlantis\u2019 LON (Launch On Need \u2013 STS-317) requirement is starting to show signs it will arrive at the Kennedy Space Center within the required timelines. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Memos note that ET-124 is now catching up with the scheduled arrival time to support STS-317\u2019s NET 9th of February launch date requirement.<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/em><\/font><font face=\"Arial\" size=\"2\"> <\/font><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**NASASpaceflight.com Job Opportunities**<\/em><\/font><font face=\"Arial\" size=\"2\"><em>&nbsp;<br \/><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/em><\/font><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>&nbsp;<\/em><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While NASA prepares for the launch of Shuttle Atlantis on STS-115 at the end of the month, the agency is working on solutions for Discovery\u2019s STS-116 mission, which could suffer a stranglehold on its launch window, due to a problem called YERO. YERO, or Year End Rollover, could prove to be a problem if Discovery [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41973","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41973"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41973"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41973\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41973"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41973"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}