{"id":41997,"date":"2006-07-20T23:32:18","date_gmt":"2006-07-20T15:32:18","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/tanks-very-much-lockheed-and-maf\/"},"modified":"2006-07-20T23:32:18","modified_gmt":"2006-07-20T15:32:18","slug":"tanks-very-much-lockheed-and-maf","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/tanks-very-much-lockheed-and-maf\/","title":{"rendered":"Tanks very much Lockheed and MAF"},"content":{"rendered":"<p>With most of the data now analysed, Lockheed Martin and the Michoud Assembly Facility (MAF) have noted their pleasure in the performance of ET-119, which rode uphill with Shuttle Discovery during STS-121\u2019s ascent on July 4.  <\/p>\n<p>  While it was crucial for the tank to perform without issue \u2013 to allow the re-start of regular Shuttle flights \u2013 managers ensured their workforce didn\u2019t go unpraised, many of whom are unsung heroes of NASA\u2019s successful second test flight.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"240\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9252\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\">Only a few minor issues have been noted thus far, with electrical, propulsion, structural and thermal protection sytems all performing well.<\/p>\n<p>Critical areas that were closely watched was the&nbsp;LH2 pre-pressurization&nbsp;ratios\/counts&nbsp;\u2013 data which is still being analysed, plus the ECO (Engine Cut Off) sensors \u2013 with all replaced sensors working within their parameters. While an \u2018old\u2019 5 percent sensor failed, a simple bypass ensured it would not play any role in affecting the launch.<\/p>\n<p>Importantly, as noted in Lockheed\u2019s Mission Success Bulletin, \u2018The bipod and bellows heaters worked well, with no ice\/frost noted. One bipod heater temperature sensor approached Launch Commit Criteria limits on the first launch attempt (July 1), but was switched to a manual control mode without issue.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">While the full suite of Developmental Flight Instrumentation (DFI) was not flown on this tank, important data was gained on how the tank reacted to the removal of its PAL (Proturberance Airloads) ramp.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Instrumentation data were successfully gathered from three of four Enhanced Data Acquisition System boxes on the Solid Rocket Boosters,\u2019 added the report. \u2018Available data are currently in review. Structural systems performed as expected as well, and ET disposal in the Pacific Ocean, south of the Cook Islands, occurred as forecasted.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Performance of the Thermal Protection Systems (TPS) received considerable attention and preliminary reviews suggest ET performance was good. Pre-launch TPS performance was nominal, and all ice conditions fell within required levels. <\/p>\n<p>\u2018The two weekend launch attempts scrubbed due to weather conditions resulted in minor instances of crushed foam, cracks and minor erosion. What was expected to be a quiet Monday after two launch attempts changed suddenly with the discovery of a crack and subsequent small foam loss in the TPS on the inboard strut of the LO2 feedline. After a day of examination and analysis, NASA accepted a use-as-is disposition.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The LO2 ice frost ramps (IFR) saw popcorning and typically minor erosion on about one-half of the ramps. No divots were observed. The Intertank IFRs experienced typical popcorning on two ramps and light to moderate erosion on most. As on the LO2, no divots were noted on the Intertank IFRs. <\/p>\n<p>\u2018On the 16 LH2 IFRs, foam loss was typically isolated to minor popcorning on a majority of the ramps and light to moderate erosion on about one-half. Divots appeared in five areas, but all were within the allowable debris size. Probable causes include delta pressure, secondary impacts or void in PDL foam.\u2019<\/p>\n<p>The success of ET-119\u2019s performance wasn\u2019t just essential, but critical to the future flow of the remaining Shuttle manifest. Such was the media and industry attention on the tank, the pressure on a clean flight was clearly being focused on the workers involved with the&nbsp;fabricating, modifying and certification of&nbsp;the tank for flight.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">However, what is often forgotten is that those very workers, especially the ones at MAF\u2019s facility in New Orleans, have been to hell and back, following last year\u2019s Hurricane Katrina. Not only did Mother Nature destroy infrastructure, but she systematically attempted to wreck the personal lives of the very people who \u2013 in a lot of cases \u2013 put their job roles with the Shuttle&nbsp;program&nbsp;before their own personal problems away from work. <\/font><\/p>\n<p>  Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018The performance of ET-119 during ascent showed extraordinary improvement and is a direct result of tireless efforts of the entire ET team,\u2019 said Wanda Sigur, vice president of the ET Project at Lockheed\/MAF, who didn\u2019t need to overplay the contributions made, given the team attitude that has been consistent throughout the last 12 months.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018My thanks and appreciation go to everyone involved in supporting the STS-121 mission. It\u2019s great to have a tangible sign that our hard work is paying off. STS-121 and the performance of ET-119 is that sign.\u2019<br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p>However, simply ensuring ET-119 was ready for safe flight wasn\u2019t the only concern that had to be address. ET-118 also have to stay within its scheduled flow, ready to be used on LON (Launch On Need) support, in case Discovery\u2019s mission had gone seriously wrong, and required Atlantis to rescue the crew from the International Space Station.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Arriving at KSC (Kennedy Space Center) with a large amount of work incomplete, nearly 100 MAF workers travelled to Florida to ensure the tank complied with STS-330 LON requirements. With five days lost on the shipping date, and with its ECO sensors requiring the complex Remove and Replace (R&amp;R) work inside the VAB (Vehicle Assembly Building), schedules placed just one day of contingency in the flow, raising concerns the tank was struggling to meet its deadlines.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img fetchpriority=\"high\" decoding=\"async\" height=\"170\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9365\" width=\"420\" align=\"left\" vspace=\"5\" border=\"0\">However, MAF workers managed to turn the situation around, immediately setting about venting the Intertank foam, finishing external shakedown activities, completing Non-Conformance Documents deferred to KSC, and removing and replacing engine cut-off (ECO) sensors, beating their own deadline by six days. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018When we were down before, we had to send all the data and photos back to Michoud where they crunched the numbers and sent it back to us at KSC,\u2019 said MAF Business planner Bill Gilbert. \u2018So we were losing a lot of schedule time getting dispositions. <\/p>\n<p>\u2018This time we said why not bring all of our people with us up front, let\u2019s attack all these areas, get all our dispositions and do our repairs. It\u2019s on the spot, real-time processing.<\/p>\n<p>\u2018The team was able to concentrate on high traffic PAL ramp removal and bipod areas to finish the tank shakedown three days quicker. Likewise with the ECO sensors, the team saved schedule time by getting all the mechanical and quality engineers to KSC early to review the paper with United Space Alliance and NASA, to decide the exact scope of work and to assign who was responsible for each task. <\/p>\n<p>\u2018When ET-118 was moved to the horizontal position on the transporter after ECO sensor removal, the team made up more time by combining three hand packs of super light ablator into one on the bolts, the leakport and the attach points after the manhole cover had been reattached. This plan saved several cure times of 24 hours. <\/p>\n<p>\u2018The crews averaged 70 workers from Michoud each day. In all, approximately 100 employees cycled through KSC to do their part, working two 12-hour shifts, seven days a week.\u2019<\/p>\n<p>Gilbert was coordinating with production manager Mike Holcomb, who noted that the trip to Florida only had one goal in mind, as opposed to the goals a lot of people travel to Florida for.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018Not a lot of beach time,\u2019 joked Holcomb. \u2018(It was) a miraculous effort by everybody \u2013 TPS, ME\u2019s, QE\u2019s, QC\u2019s and technicians. They all pulled together and worked in an out-of-position environment, having to go up and down 20 to 30-foot scaffolding. It was a real challenge.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">MAF workers who remained at KSC for the final elements of work on the tank did get some just rewards, however. 30 of the workers got to cheer&nbsp;Discovery \u2013 and their \u2018other\u2019&nbsp;tank&nbsp;\u2013&nbsp;launch uphill from the vantage point of next to the VAB, before returning to MAF to join in with work on the next tank to ship from the facility, ET-123 \u2013 set to fly with Discovery at the end of this year.<\/font><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7016\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**FREE STS-121&nbsp;VIDEOS**<\/em><\/font><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013&nbsp;<\/em>Re-Entry and Landing. SRB Cam, Docking, Hatch Opening. Rbar (RPM) Video (8x).&nbsp;Flight&nbsp;Deck ascent video.<\/font><\/font><font face=\"Arial\"><font size=\"2\">&nbsp;Five videos of the debris events. Full T-30 mins&nbsp;to T+60 mins STS-121 launch video and all views of launch, plus more.<br \/><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**NASASpaceflight.com Job Opportunities**<\/font><font face=\"Arial\" size=\"2\">&nbsp;If you&nbsp;are awaiting a&nbsp;response, please re-send due to e-mail failure.<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With most of the data now analysed, Lockheed Martin and the Michoud Assembly Facility (MAF) have noted their pleasure in the performance of ET-119, which rode uphill with Shuttle Discovery during STS-121\u2019s ascent on July 4. While it was crucial for the tank to perform without issue \u2013 to allow the re-start of regular Shuttle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-41997","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41997"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=41997"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/41997\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=41997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=41997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=41997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}