{"id":42000,"date":"2006-07-17T22:56:54","date_gmt":"2006-07-17T14:56:54","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-ready-to-roll-with-atlantis-and-sts-115\/"},"modified":"2006-07-17T22:56:54","modified_gmt":"2006-07-17T14:56:54","slug":"nasa-ready-to-roll-with-atlantis-and-sts-115","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-ready-to-roll-with-atlantis-and-sts-115\/","title":{"rendered":"NASA ready to roll with Atlantis and STS-115"},"content":{"rendered":"<p>While NASA celebrates the successful conclusion to STS-121, following Monday\u2019s return of Shuttle Discovery, the kick-start to the task of completing the International Space Station (ISS) starts in earnest next month.  <\/p>\n<p>  Atlantis\u2019 STS-115 mission, with a NET (No Earlier Than) August 27 launch date, is a major step up from Discovery\u2019s mission, a point emphasised by Shuttle manager Wayne Hale, who classed the mission as \u201cthe most complicated assembly mission in the history of human space flight.\u201d<br \/>\n<font color=\"#ff0000\"><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"90\" alt=\"\" hspace=\"5\" src=\"http:\/\/content.nasaspaceflight.com\/library\/1016\/logo2_1bk.jpg\" data-rel=\"penci-gallery-image-content\" width=\"182\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><br \/><\/font><font face=\"Arial\" size=\"2\">**The 200 page STS-115 Flight Plan is available in full on L2**<\/p>\n<p>**Atlantis STS-115 Live Update Pages**<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">As Discovery rolled back into her home Orbiter Processing Facility (OPF 3), sister ship Atlantis is just a week away from leaving her home (OPF 1) to rollover to the VAB (Vehicle Assembly Building) in preparations to be mated with the STS-115 stack. <\/font>  <\/p>\n<p><font face=\"Arial\" size=\"2\">Atlantis\u2019 mission payload will be carrying the Port 3\/4 truss \u2013 the next major addition to the 11-segment integrated truss structure that will eventually span more than 300 feet. The truss, with its two large solar arrays, is a vital component in supplying extra power to the future configuration of the orbital outpost. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We are launching in just six weeks time on probably the most complicated assembly mission that has ever been scheduled in human space flight,\u2019 said Hale. \u2018We have the team practised and battle hardened and ready to go do that.\u2019<\/p>\n<p>STS-115, according to its Flight Plan, will involve a 12 day mission, incorporating three spacewalks (EVAs) and the installation of the truss segment \u2013 plus deployment of its solar arrays. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"240\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=9252\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\">\u2018The primary objective of this flight is to deliver and integrate the completion of ISS Stage 12A with the P3\/P4 Integrated Truss Segment (ITS). The P4 Photovoltaic (PV) Module (PVM) contains two beta gimbal\/PV array assemblies, two Beta Gimbal Transition Structures (BGTSs), one Integrated Equipment Assembly (IEA) \u00e2\u20ac\u201c Type I, and associated cabling,\u2019 noted the Flight Plan. <\/p>\n<p>\u2018The cargo element also includes 6 battery sets, PV radiator, 2 Unpressurized Cargo Carrier Attach Systems (UCCAS), Solar Array Rotating Joint (SARJ) and preintegrated Orbiter Space Vision System (OSVS) targets. The CE occupies the majority of the payload bay and is attached in the payload bay by four active longeron trunnion latches and two active keel trunnion latches.<\/p>\n<p>\u2018Also part of the LP are the ISS Utilization payloads, which consist of six unpowered and three powered experiments.\u2019<\/p>\n<p>Hale also noted that a meeting on Friday will finalise the date for when Atlantis will be making the trip over the VAB, whilst confirming launch processing is ahead of schedule. <\/p>\n<p>Much of the gained contingency was earned by Lockheed Martin engineers and technicians, who worked around the clock to changeout the ECO (Engine Cut Off) sensors in ET-118 at KSC, way ahead of schedule. Initially, only one day of contingency (for STS-301 LON \u2013 Launch On Need) remained following the arrival of the \u2018incompleted\u2019 tank.<\/p>\n<p>A few more days of work will be carried out on Atlantis, including the changeout of around 100 gap fillers around the ET umbilical doors, resulting from a few issues spotted during Discovery\u2019s two week journey in orbit.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018We have (Atlantis) almost ready to rollout \u2013 and we have gone back and looked at the little bugs that we saw on Discovery, in terms of gap fillers and thermal blankets. We have also looked very hard at the APU (Auxiliary Power Units) system,\u2019 added Hale. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018This Friday we will have our rollout review for Atlantis, and next Monday or Tuesday we will see the rollout (rollover) of Atlantis to mate with the tank and solid rocket boosters.\u2019 <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Subject to Atlantis\u2019 launch will be the status of Discovery, as she is required to support her sister as the rescue vehicle during STS-115. Managers will be able to assess the status of Discovery by the time Atlantis is due to launch, as Discovery will be half way through her turnaround processing for STS-116 \u2013 her primary mission, which is set to launch in December.<\/p>\n<p>\u2018We will be working very hard to get Discovery turned around. The landing at the Kennedy Space Center gives us an additional week of time that we would have normally worried about in the processing if we had landed out west (at Edwards Air Force base in California).\u2019<\/p>\n<p>Hale also added that ET-123, the tank which will fly with Discovery on STS-116 (and STS-301 if required) is on schedule, with an arrival time of September 10 \u2013 five days before the deadline for LON processing. <\/font><\/p>\n<p>  Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\">\u2018So we\u2019re on track for the launch of Atlantis, we will be well covered from a rescue flight standpoint,\u2019 Hale noted. \u2018We also have considerable margin to get Discovery ready for December.\u2019<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Should all go to plan, NASA will be able to launch three times before the year is out.<\/font><br \/><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**FREE STS-121&nbsp;VIDEOS**<\/em><\/font><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013&nbsp;<\/em>Re-Entry and Landing. SRB Cam, Docking, Hatch Opening. Rbar (RPM) Video (8x).&nbsp;Flight&nbsp;Deck ascent video.<\/font><\/font><font face=\"Arial\"><font size=\"2\">&nbsp;Five videos of the debris events. Full T-30 mins&nbsp;to T+60 mins STS-121 launch video and all views of launch, plus more.<br \/><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**NASASpaceflight.com Job Opportunities**<\/font><font face=\"Arial\" size=\"2\">&nbsp;If you&nbsp;are awaiting a&nbsp;response, please re-send due to e-mail failure.<\/font><\/em><\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7016\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While NASA celebrates the successful conclusion to STS-121, following Monday\u2019s return of Shuttle Discovery, the kick-start to the task of completing the International Space Station (ISS) starts in earnest next month. Atlantis\u2019 STS-115 mission, with a NET (No Earlier Than) August 27 launch date, is a major step up from Discovery\u2019s mission, a point emphasised [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42000","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42000"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42000"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42000\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}