{"id":42002,"date":"2006-07-15T01:09:28","date_gmt":"2006-07-14T17:09:28","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-sets-targets-for-new-ares-infrastructure\/"},"modified":"2006-07-15T01:09:28","modified_gmt":"2006-07-14T17:09:28","slug":"nasa-sets-targets-for-new-ares-infrastructure","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-sets-targets-for-new-ares-infrastructure\/","title":{"rendered":"NASA sets targets for new Ares infrastructure"},"content":{"rendered":"<p>April of next year has been set as the handover date for Launch Complex 39B from Shuttle operations to CLV (Crew Launch Vehicle) recommisioning, in the first step of Kennedy Space Center\u2019s transition back to a moon port.  <\/p>\n<p>  However, it\u2019ll come at a price, with brand new \u201clightweight\u201d MLPs (Mobile Launch Platforms) and infrastructure, plus up to four test flights in the 2009 through 2010 time frame, before Ares I launches on its debut manned mission in 2012.\n<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"122\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7083\" width=\"224\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><br \/>**CLICK HERE FOR HI RES IMAGE OF CLV ON NEW MLP**<\/p>\n<p><em>Further images and extensive&nbsp;information on L2 \u2013 from which this article was collated <\/em><\/p>\n<p>The Vision for Space Exploration (VSE) remains a fluid goal, with dissenting opinion continues&nbsp;behind the scenes on the \u2018stick\u2019 concept. However,&nbsp;the timeline of&nbsp;bringing together the elements required is starting to come to fruition.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Shuttle operations on Pad 39B \u2013 first used as an Apollo launch pad in 1969 and as a Shuttle pad in 1986 \u2013 will cease on March 31, 2007, with all remaining STS flights utilising Pad 39A \u2013 which is currently undergoing an overhaul that is expected to last for another six months.<\/p>\n<p>The confirmation of 39B is yet to be made official by NASA, although sources note the decision has taken place, ruling out Launch Complex 40 \u2013 which was the other frontrunner for CLV operations.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">Initially, LC 39B will see the dismantling of its RSS (Rotating Service Structure). Funding for the design and modification of the pad will come into effect around August, 2007, involving the modification of the FSS (Fixed Service Structure).<\/p>\n<p>Up to four test flights will take place prior to the pad being fully modified for Ares I operations. The test flights will utilise a the current four segment SRB (Solid Rocket Booster), with a dummy second stage.<\/p>\n<p>While the existing FSS is tall enough for the test flights, the LOX Vent Arm and the Crew Access Arm will also be modified to access the interstage and SRB electronics respectively. Full modifications on the pad&nbsp;for the Ares I vehicle will be staged during the test flights. The current FSS will then be removed after the last test flight.<\/p>\n<p>Overall, initial design phase is expected to last nine months, with fabrication, demolition, construction, modifications and testing expected to take another 15 to 18 months. The goal is to have the pad ready for flight hardware evaluations by the end of 2008, with the first test flight to launch from the pad a year later. <\/p>\n<p>NASA\u2019s goal is to have LC 39B ready to start testing with real test flight hardware no later than the end of 2008. Each of the three or four test flights will happen four months apart.<\/p>\n<p><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7015\" width=\"468\" vspace=\"5\" border=\"0\"><\/font><\/p>\n<p>One major change that\u2019ll have to occur is the construction of new MLPs (Mobile Launch Platforms) for Ares I \u2013 with one of the Shuttle MLPs being handed over for use in the test flights. This handover is expected to happen in October, 2007.<\/p>\n<p>This MLP will require only a slight amount of modification, utilising the left hole currently used&nbsp;by the left SRB of the Shuttle stack for the test flights of the four seg CLV test vehicle. However, for Ares I, a&nbsp;new, lightweight MLPs will be necessary. The current MLPs are simply too heavy for combination of all the weight associated with the Ares I, inadequate by around one and a half million pounds for the crawler\/transporters.<\/p>\n<p>The MLPs used for the Shuttle program have a weight of about eight and a half million pounds in their Shuttle configuration. Add on the 4 million pounds the new LUT (Launch Umbilical Tower) will weigh,&nbsp;plus a fully loaded solid fuelled vehicle and other elements that will require carrying to the pad \u2013 means the crawlers would not be able to&nbsp;carry&nbsp;the load. <\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">To get around this problem, NASA will build new MLPs for Ares I, which have a different appearance to the current MLPs by way of their shape and steel beams that will replace large parts of the current \u2018box\u2019 platform.<\/font><\/p>\n<p><font face=\"Arial\" size=\"2\">The existing MLPs will still live on, ready to be utilised by the Ares V (CaLV) heavy cargo vehicle. Whilst also requiring modification, the ARES V stack \u2013&nbsp;along with the MLP\/LUT \u2013&nbsp;is expected to be pushing in excess of 15 million pounds in weight. For this, NASA will build two new super-sized crawler\/transporters, using all three of the existing MLPs.<\/p>\n<p><em>More articles will follow.<br \/><\/em>*CLV\/CEV dedicated information pages*<br \/>*CaLV\/SDLV dedicated information pages*<\/p>\n<p><font face=\"Arial\" size=\"2\"><em>**FREE STS-121 VIDEOS**<\/em><\/font><font face=\"Arial\"><font size=\"2\"><em>&nbsp;\u2013&nbsp;<\/em>SRB Cam, Docking, Hatch Opening. Rbar (RPM) Video (8x).&nbsp;Flight&nbsp;Deck ascent video.<\/font><\/font><font face=\"Arial\"><font size=\"2\">&nbsp;Five videos of the debris events. Full T-30 mins&nbsp;to T+60 mins STS-121 launch video and all views of launch, plus more.<br \/><\/font><font size=\"1\">(<em>Video section is FREE, but you need to sign up as a member of the forum to enter the video section of the site. We only use your e-mail to send you your password. It will not be used for spam etc.)<\/em><\/font><\/font><\/font><\/p>\n<p><em><font face=\"Arial\" size=\"2\">**NASASpaceflight.com Job Opportunities**<\/font><font face=\"Arial\" size=\"2\">&nbsp;<\/font><\/em><\/p>\n<p>  Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><font face=\"Arial\" size=\"2\"><em><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/www.lduhtrp.net\/image-1911168-10415279\" width=\"120\" align=\"left\" vspace=\"5\" border=\"0\"><\/em><\/font><em><font face=\"Arial\" size=\"2\"><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"10\" src=\"http:\/\/www.awltovhc.com\/image-1911168-10419894\" width=\"120\" align=\"right\" vspace=\"10\" border=\"0\"><\/font><\/em><br \/><font face=\"Arial\" size=\"2\"><em>&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/em><\/font><u><font face=\"Arial\" size=\"2\"><em>LIVE&nbsp;UPDATE PAGES<\/em><\/font><\/p>\n<p><\/u><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"60\" alt=\"\" hspace=\"5\" src=\"http:\/\/forum.nasaspaceflight.com\/forums\/get-attachment.asp?action=view&amp;attachmentid=7016\" width=\"468\" align=\"left\" vspace=\"5\" border=\"0\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>April of next year has been set as the handover date for Launch Complex 39B from Shuttle operations to CLV (Crew Launch Vehicle) recommisioning, in the first step of Kennedy Space Center\u2019s transition back to a moon port. However, it\u2019ll come at a price, with brand new \u201clightweight\u201d MLPs (Mobile Launch Platforms) and infrastructure, plus [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-42002","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42002"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=42002"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/42002\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=42002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=42002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=42002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}